896
|
Thursday, April 23, 2015, 09:08 |
David Wang | Conditioning Station | Maintenance | TM1 | UCx12 | Huge Leak on TM1 contaiment box window. | There is a huge leak on TM1 containment
box window. I did a 70 psi helium pressure
test on all TM1 water circuits this morning. |
|
897
|
Thursday, April 23, 2015, 12:56 |
Anders Mjos | Conditioning Station | Maintenance | TM1 | | IG1 Good Vacuum limit changed | Changed by Dave Morris.
New value is 1E-5 T (old value was
7.09E-5 T) |
|
898
|
Monday, April 27, 2015, 10:28 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx12 | TM4 has been partially disconnected at CS. | TM1 has been partially disconnected at
CS for tomorrow move. The CS TP1S is still
running and will be stopped and disconnected |
|
901
|
Tuesday, April 28, 2015, 10:21 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx12 | CS and TM1 was vented with Argon gas | Dan and I vented CS and TM1 with Argon
gas before it is moved this morning. |
|
902
|
Tuesday, April 28, 2015, 10:26 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | ITW target pit o-ring seal replacement. | Dan and I replaced ITW target pit o-ring
seal(.275DIA X42"ID). It is an annual
job before first beam to ITW. The old o-ring |
|
904
|
Tuesday, April 28, 2015, 11:14 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module move | TM#1 with UC#12 has been moved from the
conditioning station to the west target station. |
|
905
|
Tuesday, April 28, 2015, 17:17 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | TM1 has been connected in ITW. | TM1 has been connected in ITW. Five turbo
pumps have been started. The TM1 containment
box window line is capped on the service |
|
916
|
Friday, May 22, 2015, 15:44 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW. I checked all ITW
water signals, and they are good. ITW |
|
940
|
Wednesday, June 10, 2015, 13:17 |
David Wang | ITE | Standard Operation | TM1 | | Target Hall Scheduled Activities April 07 - July 26 2015 | Weekly update the schedule after some jobs
have been finished in this week. |
|
953
|
Friday, June 19, 2015, 11:43 |
David Wang | ITW | Repair | TM1 | | ITW external water leak on dump circuit | There was an external water leak in ITW
during the last beam running time. The leak
started after the shielding blocks transfer(May |
6x |
969
|
Tuesday, June 30, 2015, 11:27 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module moved | TM#1 with UC#12 has been moved from the
west station to the south hot cell. |
|
970
|
Tuesday, June 30, 2015, 12:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#12 | UCx #12 Removal | UCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly |
|
971
|
Tuesday, June 30, 2015, 15:41 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW this morning. | TM1 was disconnected in ITW this
morning. The ITW was vented with argon last
night. |
|
974
|
Thursday, July 02, 2015, 11:49 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south hot
cell to the south west silo. |
|
988
|
Thursday, July 09, 2015, 13:17 |
Anders Mjos | Conditioning Station | Standard Operation | TM1 | | TM1 in TCS for alpha contamination test | Thursday, July 09, 2015, 13:17: Water
package started.
Thursday, July 09, 2015, 15:20: Water |
|
990
|
Thursday, July 09, 2015, 14:02 |
David Wang | Conditioning Station | Development | TM1 | | TM1 is pumping down at CS | TM1 and CS vacuum system are connected.
All turbo-pumps are started. The new TP1S
works fine also. The pumping down looks good |
|
992
|
Friday, July 10, 2015, 14:41 |
Anders Mjos | Conditioning Station | Maintenance | TM1 | | Replaced roughing pump | The roughing pump was replaced with
a more leak tight pump due to the discovery
of Rn-220 migration while roughing on TM1 |
|
993
|
Monday, July 13, 2015, 11:31 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved back to the south west
silo from the conditioning station. |
|
1064
|
Wednesday, September 09, 2015, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south west
silo to the south hot cell. |
|
1065
|
Thursday, September 10, 2015, 08:55 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Leak Diag. | Vacuum leak check on the window line circuit
of TM1 took place yesterday and again to
confirm this morning. Both days the response |
|