Tuesday, September 22, 2020, 10:56, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#30, Module move
|
TM#4 with UC#30 has been moved from ITE to the south hot cell. |
Tuesday, September 29, 2020, 12:29, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move
|
Module move of TM#4 with UC#31 was finished to today at around 10:30AM. |
Wednesday, September 30, 2020, 09:54, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Module move
|
TM#3 is now in the south hot cell. |
Tuesday, October 13, 2020, 10:16, Travis Cave, ITE, Repair, TM4, UC#31, Module move
|
TM#4 is now in the south hot cell from the east target station. |
Thursday, October 15, 2020, 12:48, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move
|
TM#4 is now back in the east target station. |
Friday, October 16, 2020, 10:36, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move
|
TM#2 with Ta#60 is now in the south hot cell. |
Tuesday, October 20, 2020, 10:14, Travis Cave, ITW, Standard Operation, TM2, C#2, Module move
|
TM#2 with C#2 has been moved from the south hot cell to the West Target Station. |
Tuesday, November 03, 2020, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#31, Module move
|
TM#4 with UC#31 has been moved from the east target station to the south hot cell. |
Thursday, November 05, 2020, 10:48, Travis Cave, ITE, Standard Operation, TM4, Ta#61, Module move
|
TM#4 with Ta#61 has been moved from the south hot cell to the east target station. |
Friday, January 08, 2021, 09:40, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#61, Module move
|
TM#4 with Ta#61 has been moved from the east target station to the south hot cell. |
Tuesday, January 19, 2021, 11:32, Travis Cave, Safe Module Parking, Standard Operation, TM2, Nb#9, Module move
|
TM#2 with Nb#9 was moved from ITW to SHC and then with no target it was moved from the SHC to the SMP. |
Wednesday, June 09, 2021, 09:16, Travis Cave, North Hot-Cell, Standard Operation, TM2, no target, Module move
|
TM#2 has been moved from the SHC to the NHC. |
Tuesday, September 14, 2021, 09:18, Travis Cave, South Hot-Cell, Repair, TM4, SiC#40, Module move
|
TM#4 with SiC#40 has been moved from the east target station to the south hot cell. |
Wednesday, September 15, 2021, 08:39, Travis Cave, ITE, Standard Operation, TM4, SiC#41, Module move
|
TM#4 with SiC#41 has been moved from the NHC to ITE. |
Tuesday, September 21, 2021, 13:47, Travis Cave, North Hot-Cell, Standard Operation, TM2, UC#34, Module move
|
TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo. |
Monday, September 27, 2021, 14:29, Travis Cave, ITW, Standard Operation, TM2, Graphite #3, Module move
|
TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days. |
Monday, October 04, 2021, 10:52, Travis Cave, North Hot-Cell, Standard Operation, TM4, SiC#41, Module move
|
TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE. |
Thursday, April 24, 2025, 11:33, Travis Cave, Conditioning Station, Standard Operation, , UC#48, Module move
|
TM4 with UC48 went on a long trip from the north hot cell to the conditioning station. |
Thursday, May 01, 2025, 09:33, Travis Cave, ITE, Standard Operation, TM4, UC#48, Module move
|
TM#4 with UC#48 went from the conditioning station to the east target station. |
Tuesday, June 17, 2025, 11:32, Adam Newsome, North Hot-Cell, Standard Operation, TM4, UC#48, Module move
|
TM#4 with UC#48 was moved from the East target station to the North Hot Cell for target exchange.
Reading at ITE = 36 mSv/h
Reading at NHC = 133 mSv/h |
|