Thursday, September 04, 2014, 11:19, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 is connected in CS.
|
TM1 is connected in CS. All turbo pumps are started. |
Friday, September 05, 2014, 07:15, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS.
|
Helium pressure test on TM1 HS water line at CS is done. 80psi helium with LD 0.0xE-9 atm.cc/sec. 3 minutes test and no response on LD. The line is leak tight. |
Monday, September 08, 2014, 13:44, David Wang, Conditioning Station, Standard Operation, TM1, ZrC#6, TM1 is disconnected at CS.
|
Stopped TM1 and CS turbo pumps. Disconnected TM1 at CS. The CS and TM1 are under vacuum and naturally leak up. I will vent it on Wednesday morning. |
Wednesday, September 10, 2014, 07:12, David Wang, ITW, Repair, TM1, , Removed ITW HS and COIL flow rate monitors.
|
Removed ITW HS and COIL flow rate monitors installed at the beginning of this year. They were installed on these two circuits for testing.They are broken during last run in ITW due to radioactive field. |
Wednesday, September 10, 2014, 08:52, Travis Cave, ITW, Standard Operation, TM1, ZrC#6, module move
|
TM#1 with ZrC#6 has been moved from the conditioning station to west target station. |
Wednesday, September 10, 2014, 11:47, David Wang, ITW, Standard Operation, TM1, , TM1 has been connected in ITW.
|
TM1 has been connected in ITW. ITW and TM1 turbo pumps have been started. Water is supplied to TM1 only. Everything is good so far. |
Tuesday, September 16, 2014, 10:41, David Wang, ITW, Standard Operation, TM1, ZrC #4, 5 Shielding blocks have been transferred from ITE to ITW.
|
5 Shielding blocks have been transferred from ITE to ITW. The ITW is configured to take proton beam |
Tuesday, October 14, 2014, 11:51, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, module move
|
TM#1 with ZrC#6 has been moved from ITW to the south hot cell. |
Tuesday, October 14, 2014, 11:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, Electrical check
|
TM#1 with ZrC#6 post beam electrical check see attached pdf for results. |
Tuesday, October 14, 2014, 12:19, David Wang, ITW, Standard Operation, TM1, , TM1 was disconnected in ITW.
|
TM1 was disconnected in ITW this morning. Heat shield circuit is purged. |
Tuesday, October 14, 2014, 13:31, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Electrical check
|
Electrical check of TM#1 with no target attached at the south hot cell see attached PDF for details. |
Wednesday, October 15, 2014, 12:55, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 with no target has been moved from the south hot cell to the south west silo. |
Monday, November 03, 2014, 10:27, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 has been moved from the south west silo to the south hot cell. |
Monday, November 03, 2014, 11:16, chad fisher, South Hot-Cell, Standard Operation, TM1, ThO#1, ThO#1 Installed
|
ThO#1 has been installed onto TM1 and is ready for leak and electrical checking. High current fasteners torqued to 130 in lbs. |
Monday, November 03, 2014, 13:47, Travis Cave, South Hot-Cell, Standard Operation, TM1, ThO#1, Electrical check
|
TM#1 with ThO#1 electrical check see attatched PDF for details. |
Tuesday, November 04, 2014, 11:05, David Wang, South Hot-Cell, Standard Operation, TM1, ThO#1, Leak check on TM1 HS water line withThO#1 installed.
|
Chad and I leak checked HS line on TM1 with ThO#1 target installed. The LD pumped down to base leak rate 0.0xE-9 atm.cc/sec, base leak rate 0.0xE-4 torr. The pumping down process is normal. Chad sprayed helium on both VCR joints (each for 2 seconds) , and he did a flush spray around the target for 5 seconds. No any response had been found on LD during and after the spray( 40seconds waiting time). The target is leak tight. |
Tuesday, November 04, 2014, 13:17, chad fisher, South Hot-Cell, Standard Operation, TM1, ThO#1, TM1 w/ ThO#1 ready
|
Tm1 with ThO#1 is buttoned up and ready for transport. |
Wednesday, November 05, 2014, 10:20, Travis Cave, South Hot-Cell, Standard Operation, TM1, ThO#1, module move
|
TM#1 with ThO#1 has been moved from the south hot cell to the west target station. |
Thursday, November 06, 2014, 08:07, David Wang, ITW, Standard Operation, TM1, ThO#1, TM1 has been connected in ITW.
|
TM1 has been connected in ITW. All turbo pumps are started. The pumping down on ITW is good so far. The water is supplied to TM1 for HV conditioning. |
Thursday, November 06, 2014, 08:55, David Wang, ITW, Repair, TM1, ThO#1, primary vacuum back up pressureITH CG1 ,CG2,CG4A were high.
|
I found primary vacuum back up pressure ITH CG1, CG2, and CG4A were unusually high this morning. They should be about 10 -20 mtorr after one night pumping, but all of thier reading were 340-350-mtorr. Thease cause the current draw on primary turbo pumps were all over 2.0A(should be about 1.0A). I let Paul closed all BVs on primary side . The pressure dropped quickly to normal range after all BVs were closed. This shows the back up line are good. The problem are from one of the connections on primary BVs. I let Paul opened the BVs one by one,but the problem did not show again. Now ,the current draw on the turbo pumps are back to normal also.
I will keep monitoring the system and take a look on all KF25 clamps on BVs once I have a chance to access to ITW. |
|