1031
|
Friday, August 07, 2015, 10:01 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 19 2015 | Weekly update target hall schedule and
activities. See attachment 1,2
Update and extend Target Hall schedule |
|
|
1032
|
Monday, August 10, 2015, 14:07 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Containment Box Removed | The containment box was taken off TM2 in
preparation for installation of a new coil
line isolator. |
|
|
1033
|
Thursday, August 13, 2015, 09:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 status | Tuesday, August 11, insulator ITA6272
was installed onto the "pin x"
line (unused plasma electrode) and tested; |
|
|
1035
|
Thursday, August 13, 2015, 13:46 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | As previously mentioned, dump target installed
with new mounting and high current fasteners.
Leak Check complete and ready to |
|
|
1038
|
Friday, August 14, 2015, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | Started CS water package for TM2 | I finished the rest TM2 connections to
CS, and started CS cooling package. Everything
works fine so far. |
|
|
1040
|
Wednesday, August 19, 2015, 14:52 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 at CS | During the TM2 HV test at CS, It failed.
In order to confirm there is no any water
leak inside the module after the heaters |
|
|
1041
|
Thursday, August 20, 2015, 09:38 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 was disconnected at CS | TM2 was disconnected at CS. Travis and
I did electrical check before the venting.
After,The module was vented and moved to |
|
|
1044
|
Thursday, August 20, 2015, 13:48 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall Scheduled Activities April 07 - Sep 08 2015 | Weekly update target hall schedule.See
attachment 1,2
Spring and summer run is close to |
|
|
1048
|
Wednesday, August 26, 2015, 09:54 |
Anders Mjos | Conditioning Station | Maintenance | | | Topped up water in TCS:TK2 | Filled to 24.9 in |
|
|
1058
|
Tuesday, September 01, 2015, 10:38 |
David Wang | ITW | Maintenance | TM2 | | ITW top tank flange clean up and r-ring replacement. | During last run, ITW dump circuit
had a water leak on an adaptor below the
pressure gauge. The top tank flange, slot, |
|
|
1059
|
Tuesday, September 01, 2015, 14:54 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connectec in ITW. | TM2 has been connected in ITW. During the
connection, Anders and I found the
TM2 high current cables used in ITE |
|
|
1061
|
Tuesday, September 01, 2015, 16:55 |
Anders Mjos | Conditioning Station | Maintenance | | | TBHT power supply remvoed | The power supply is needed as a spare
for the failed TGHT p/s in ITW |
|
|
1062
|
Wednesday, September 02, 2015, 09:26 |
David Wang | ITE | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | I attach new Target Hall schedules here
for 2015 fall and winter runs (beam schedule
129). The TH excel sheet schedule for beam |
|
|
1065
|
Thursday, September 10, 2015, 08:55 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Leak Diag. | Vacuum leak check on the window line circuit
of TM1 took place yesterday and again to
confirm this morning. Both days the response |
|
|
1066
|
Thursday, September 10, 2015, 08:59 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Mait. and field check Sept. 4 | Hot cell was entered for preventative mait.
on left manip. field measurements around
the cell were taken in prep. for window removal |
|
|
1069
|
Tuesday, September 15, 2015, 11:06 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Gasket Replacement | Replaced the custom silver gaskets on the
entrance window panel of TM1 this morning...this
has eliminated an sign of leak at this joint, |
|
|
1071
|
Thursday, September 17, 2015, 11:50 |
David Wang | Spent Target Vault | Repair | TM1 | | TM1 window circuit leak check | Leak check TM1 window circuit soldering
stems inside service cap when module is located
at NE silo. LD base LR 0.0xE-9atm.cc/sec. |
|
|
1082
|
Friday, September 25, 2015, 07:56 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | weekly update see attachment |
|
|
1089
|
Thursday, October 01, 2015, 09:18 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets transfered to mini storage. | In preparation for shipping of the spent
targets five have been moved to the mini
storage. The following target were moved |
|
|
1090
|
Monday, October 05, 2015, 10:19 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance | will be performed Tuesday October
6th
Tuesday, October 06, 2015: Maintenance |
|