1007
|
Tuesday, July 21, 2015, 12:38 |
David Wang | ITW | Repair | | | ITW external water leak on dump circuit has been fixed. | The leaking 1/8 NPT(M)-1/4NPT(F) adapter
on the ITW dump circuit is replaced. |
|
1009
|
Wednesday, July 22, 2015, 12:13 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Short Findings | Pin X was unplugged, short remained, however
any slight pressure on the block towards
the source tray makes the short go away. |
|
1010
|
Thursday, July 23, 2015, 10:23 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 019 2015 | Update Target Hall schedule after the changing
on TM2 process. See attachment 1,2 |
 |
1011
|
Friday, July 24, 2015, 10:04 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been moved from ITE to block storage area. | Dan and I moved 5 shielding blocks from
ITE to block storage area. The move is smooth. |
|
1016
|
Monday, July 27, 2015, 15:34 |
David Wang | ITE | Standard Operation | TM4 | | Leak check on TM4 HS water line with new UCX target. at SHC | Chad and I leak checked the HS line at
SHC after UCX target installation. On first
round helium spray, one of VCR fitting has |
|
1017
|
Monday, July 27, 2015, 15:46 |
David Wang | South Hot-Cell | Standard Operation | | | The yellow steel plug is put on SHC in TH | The yellow steel plug is put on SHC in
TH. The spent target is inside the SHC.The
field around the SHC area in TH is so high |
|
1020
|
Tuesday, July 28, 2015, 10:17 |
David Wang | ITE | Repair | | | ITE TP4 has been replaced | Tony and I replaced the ITE TP4 turbo pump
today. The pumping time on controller has
been reset to 0. The replaced broken |
|
1026
|
Wednesday, July 29, 2015, 10:14 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE | Dan and I connected TM4 in ITE. We checked
all water signals on ITE cooling circuits.
Everything is good. |
|
1028
|
Friday, July 31, 2015, 09:47 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 019 2015 | Weekly update of Target Hall schedule after
so many jobs have been finished in this week.
See attachment 1, 2 |
 |
1029
|
Thursday, August 06, 2015, 10:26 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Measurments and Assays | All targets but one ( SiC#31 went in last
week) have been measured or assayed. See
attached PDF for the details. |
|
1031
|
Friday, August 07, 2015, 10:01 |
David Wang | ITE | Standard Operation | | | Target Hall Scheduled Activities April 07 - August 19 2015 | Weekly update target hall schedule and
activities. See attachment 1,2
Update and extend Target Hall schedule |
   |
1032
|
Monday, August 10, 2015, 14:07 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Containment Box Removed | The containment box was taken off TM2 in
preparation for installation of a new coil
line isolator. |
|
1033
|
Thursday, August 13, 2015, 09:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 status | Tuesday, August 11, insulator ITA6272
was installed onto the "pin x"
line (unused plasma electrode) and tested; |
  |
1035
|
Thursday, August 13, 2015, 13:46 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | As previously mentioned, dump target installed
with new mounting and high current fasteners.
Leak Check complete and ready to |
|
1038
|
Friday, August 14, 2015, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | Started CS water package for TM2 | I finished the rest TM2 connections to
CS, and started CS cooling package. Everything
works fine so far. |
|
1040
|
Wednesday, August 19, 2015, 14:52 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 at CS | During the TM2 HV test at CS, It failed.
In order to confirm there is no any water
leak inside the module after the heaters |
|
1041
|
Thursday, August 20, 2015, 09:38 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 was disconnected at CS | TM2 was disconnected at CS. Travis and
I did electrical check before the venting.
After,The module was vented and moved to |
|
1044
|
Thursday, August 20, 2015, 13:48 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall Scheduled Activities April 07 - Sep 08 2015 | Weekly update target hall schedule.See
attachment 1,2
Spring and summer run is close to |
   |
1048
|
Wednesday, August 26, 2015, 09:54 |
Anders Mjos | Conditioning Station | Maintenance | | | Topped up water in TCS:TK2 | Filled to 24.9 in |
|
1058
|
Tuesday, September 01, 2015, 10:38 |
David Wang | ITW | Maintenance | TM2 | | ITW top tank flange clean up and r-ring replacement. | During last run, ITW dump circuit
had a water leak on an adaptor below the
pressure gauge. The top tank flange, slot, |
  |