ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  740   Thursday, September 04, 2014, 11:19 David WangConditioning StationStandard OperationTM1 TM1 is connected in CS.TM1 is connected in CS. All turbo pumps
are started.
  
  741   Friday, September 05, 2014, 07:15 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.Helium pressure test on TM1 HS water line
at CS is done. 80psi helium with LD 0.0xE-9
atm.cc/sec. 3 minutes test and no response
  
  743   Monday, September 08, 2014, 13:44 David WangConditioning StationStandard OperationTM1ZrC#6TM1 is disconnected at CS.Stopped TM1 and CS turbo pumps. Disconnected
TM1 at CS. The CS and TM1 are under vacuum
and naturally leak up. I will vent it on
  
  744   Wednesday, September 10, 2014, 07:12 David WangITWRepairTM1 Removed ITW HS and COIL flow rate monitors.Removed ITW HS and COIL flow rate monitors
installed at the beginning of this year.
They were installed on these two circuits
  
  745   Wednesday, September 10, 2014, 08:52 Travis CaveITWStandard OperationTM1ZrC#6module moveTM#1 with ZrC#6 has been moved from the
conditioning station to west target station.
  
  746   Wednesday, September 10, 2014, 11:47 David WangITWStandard OperationTM1 TM1 has been connected in ITW.TM1 has been connected in ITW.  ITW
and TM1 turbo pumps have been started. Water
is supplied to TM1 only. Everything is good
  
  749   Tuesday, September 16, 2014, 10:41 David WangITWStandard OperationTM1ZrC #45 Shielding blocks have been transferred from ITE to ITW.5 Shielding blocks have been transferred
from ITE to ITW. The ITW is configured to
take proton beam
  
  760   Tuesday, October 14, 2014, 11:51 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6module moveTM#1 with ZrC#6 has been moved from ITW
to the south hot cell.
  
  761   Tuesday, October 14, 2014, 11:52 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6Electrical checkTM#1 with ZrC#6 post beam electrical check
see attached pdf for results.
 TM1_ZrC6_postbeam.PDF 
  762   Tuesday, October 14, 2014, 12:19 David WangITWStandard OperationTM1 TM1 was disconnected in ITW.TM1 was disconnected in ITW this morning.
Heat shield circuit is purged.
  
  763   Tuesday, October 14, 2014, 13:31 Travis CaveSouth Hot-CellStandard OperationTM1no targetElectrical checkElectrical check of TM#1 with no target
attached at the south hot cell see attached
PDF for details.
 TM1_elec_check_no_target.PDF 
  765   Wednesday, October 15, 2014, 12:55 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 with no target has been moved from
the south hot cell to the south west silo.
  
  775   Monday, November 03, 2014, 10:27 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 has been moved from the south west
silo to the south hot cell.
  
  776   Monday, November 03, 2014, 11:16 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 InstalledThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs.
  
  777   Monday, November 03, 2014, 13:47 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Electrical checkTM#1 with ThO#1 electrical check see attatched
PDF for details.
 TM1_elec_check_ThO1_SHC.PDF 
  778   Tuesday, November 04, 2014, 11:05 David WangSouth Hot-CellStandard OperationTM1ThO#1Leak check on TM1 HS water line withThO#1 installed.Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec,
  
  779   Tuesday, November 04, 2014, 13:17 chad fisherSouth Hot-CellStandard OperationTM1ThO#1TM1 w/ ThO#1 readyTm1 with ThO#1 is buttoned up and ready
for transport.
  
  780   Wednesday, November 05, 2014, 10:20 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1module moveTM#1 with ThO#1 has been moved from the
south hot cell to the west target station.
  
  782   Thursday, November 06, 2014, 08:07 David WangITWStandard OperationTM1ThO#1TM1 has been connected in ITW.TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to
  
  783   Thursday, November 06, 2014, 08:55 David WangITWRepairTM1ThO#1 primary vacuum back up pressureITH CG1 ,CG2,CG4A were high.I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20
  