740
|
Thursday, September 04, 2014, 11:19 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 is connected in CS. | TM1 is connected in CS. All turbo pumps
are started. |
|
741
|
Friday, September 05, 2014, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | Helium pressure test on TM1 HS water line
at CS is done. 80psi helium with LD 0.0xE-9
atm.cc/sec. 3 minutes test and no response |
|
743
|
Monday, September 08, 2014, 13:44 |
David Wang | Conditioning Station | Standard Operation | TM1 | ZrC#6 | TM1 is disconnected at CS. | Stopped TM1 and CS turbo pumps. Disconnected
TM1 at CS. The CS and TM1 are under vacuum
and naturally leak up. I will vent it on |
|
744
|
Wednesday, September 10, 2014, 07:12 |
David Wang | ITW | Repair | TM1 | | Removed ITW HS and COIL flow rate monitors. | Removed ITW HS and COIL flow rate monitors
installed at the beginning of this year.
They were installed on these two circuits |
|
745
|
Wednesday, September 10, 2014, 08:52 |
Travis Cave | ITW | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from the
conditioning station to west target station. |
|
746
|
Wednesday, September 10, 2014, 11:47 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been connected in ITW. | TM1 has been connected in ITW. ITW
and TM1 turbo pumps have been started. Water
is supplied to TM1 only. Everything is good |
|
749
|
Tuesday, September 16, 2014, 10:41 |
David Wang | ITW | Standard Operation | TM1 | ZrC #4 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 Shielding blocks have been transferred
from ITE to ITW. The ITW is configured to
take proton beam |
|
760
|
Tuesday, October 14, 2014, 11:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from ITW
to the south hot cell. |
|
761
|
Tuesday, October 14, 2014, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check | TM#1 with ZrC#6 post beam electrical check
see attached pdf for results. |
|
762
|
Tuesday, October 14, 2014, 12:19 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW. | TM1 was disconnected in ITW this morning.
Heat shield circuit is purged. |
|
763
|
Tuesday, October 14, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check | Electrical check of TM#1 with no target
attached at the south hot cell see attached
PDF for details. |
|
765
|
Wednesday, October 15, 2014, 12:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved from
the south hot cell to the south west silo. |
|
775
|
Monday, November 03, 2014, 10:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south west
silo to the south hot cell. |
|
776
|
Monday, November 03, 2014, 11:16 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 Installed | ThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs. |
|
777
|
Monday, November 03, 2014, 13:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Electrical check | TM#1 with ThO#1 electrical check see attatched
PDF for details. |
|
778
|
Tuesday, November 04, 2014, 11:05 |
David Wang | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Leak check on TM1 HS water line withThO#1 installed. | Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec, |
|
779
|
Tuesday, November 04, 2014, 13:17 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | TM1 w/ ThO#1 ready | Tm1 with ThO#1 is buttoned up and ready
for transport. |
|
780
|
Wednesday, November 05, 2014, 10:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | module move | TM#1 with ThO#1 has been moved from the
south hot cell to the west target station. |
|
782
|
Thursday, November 06, 2014, 08:07 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | TM1 has been connected in ITW. | TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to |
|
783
|
Thursday, November 06, 2014, 08:55 |
David Wang | ITW | Repair | TM1 | ThO#1 | primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. | I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20 |
|