Entry  Tuesday, September 21, 2021, 13:47, Travis Cave, North Hot-Cell, Standard Operation, TM2, UC#34, Module move 
 TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo.
Entry  Monday, September 27, 2021, 14:29, Travis Cave, ITW, Standard Operation, TM2, Graphite #3, Module move 
 TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been
turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days.
Entry  Monday, October 04, 2021, 10:52, Travis Cave, North Hot-Cell, Standard Operation, TM4, SiC#41, Module move 
 TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE.
Entry  Thursday, April 24, 2025, 11:33, Travis Cave, Conditioning Station, Standard Operation, , UC#48, Module move 
 TM4 with UC48 went on a long trip from the north hot cell to the conditioning station.
Entry  Wednesday, January 08, 2020, 10:34, David Wang, Assembly/Bench Test, Development, , , Module lifting assembly ITA0490 
The second module lifting assembly ITA0490 is moved into TH and installed onto TM3 . It will stay with TM3. I adjusted the  CofG on the assembly.
It is same to the first lifting assembly we are using now. After adjustment, The installation of assembly on TM3 are smooth.  
Entry  Monday, May 22, 2023, 15:06, Carla Babcock, ITE, Standard Operation, TM4, TiC#5, Module conditioning 
Yesterday and today module conditioning was done on Tm4 in ITE. This is the first ramp up after the shutdown and ITE is planned to run at high voltages
for the first weeks. The module is behaving well - went up to 40kV yesterday, stayed there for an hour, and up to 46kV today. Current draw is 113uA at
46kV. No serious sparking.
Entry  Tuesday, June 06, 2023, 17:36, Carla Babcock, ITW, Standard Operation, TM2, TiC#6, Module conditioning 
Conditioned TM2 up to 48kV in ITW. Some sparks and current is not very stable. Drawing about 178uA at 48kV.
Entry  Thursday, June 07, 2012, 11:58, Bevan Moss, Conditioning Station, Standard Operation, TM1, Ta38, Module Move from SHC to TCS 
TM1 was moved from SHC to the TCS. The mode took roughly 1 hour. During the move the north east corner of the containment box caught slightly on the
flange of the vacuum vessel and then slipped off. The contact was minimal but should none the less be noted. After sliding off of the flange the module
did not crash into the other sides of the vacuum vessel, this is why I believe the contact was minimal. It should be noted that the corner of concern is
Entry  Friday, March 08, 2013, 15:50, Bevan Moss, ITE, Standard Operation, TM4, CS Test Target #1, Module Move from ITE to SHC 
 Today David and I moved the module from ITE to the SHC. Move went very smoothly, David operated the cameras and has had basic training in how to
manually lock out the controls.
Entry  Tuesday, October 09, 2012, 11:17, Bevan Moss, ITE, Standard Operation, TM4, NiO#1, Module Move 
 TM4 with NiO#1 was moved from ITE to the SHC today. The move went well with no issues.
Entry  Tuesday, October 09, 2012, 14:53, Bevan Moss, Conditioning Station, Development, TM4, UCx#5, Module Move 
TM4 was remote moved from the SCH to the TCS today. This was the first time the module was moved with the framework for the cage in place. The ion gauge
on the service cap is closer to the cage than anticipated and as a result the pins for the gauge were sheared off. Discussion as to how to repair the gauge
(both short term and long term needs to be had). We will try and rough down the TM tonight, it is not believed the vacuum will be affected.
Entry  Wednesday, March 13, 2013, 14:31, Bevan Moss, Conditioning Station, Standard Operation, TM4, CS Test Target #1, Module Move 
 TM4 with CS Test Target #1 was moved from the SHC to the Conditioning Station. All went well. The welding cables came a little close to the cage,
David will bend them in more in the future.
Entry  Tuesday, November 17, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , Module Move 
TM2 has been moved from ITW to the South Hot Cell. 

Reading at ITW: 114 mSv/hr
Entry  Tuesday, November 24, 2020, 09:37, Adam Newsome, ITW, Standard Operation, TM2, , Module Move 
TM2 has been moved from the Conditioning Station to ITW. 
Entry  Wednesday, November 25, 2020, 09:05, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , Module Move 
TM3 has been moved from the Silo to the South Hot Cell.
Entry  Tuesday, November 09, 2021, 14:35, Adam Newsome, South Hot-Cell, Standard Operation, TM2, UCX#36, Module Move 
TM#2 was moved from ITW to SHC, then moved back to ITW.
Entry  Friday, September 17, 2021, 12:34, Frank Song, ITE, Standard Operation, TM4, Sic#41, Module Connection IMG_3602.jpgIMG_3601.jpgIMG_3600.jpgIMG_3599.jpg
 TM4 with a new target was moved back from NHC to ITE and reconnected at pit. The 5 shielding blocks were installed as well. Copies of connection
checklist are attached here.
Entry  Monday, October 04, 2021, 09:27, Frank Song, ITW, Standard Operation, TM2, C#3, Module Connection IMG_3711.jpgIMG_3712.jpgIMG_3713.jpgIMG_3714.jpg
 TM2 been connected with new target C#3 in ITW. 
Entry  Friday, October 08, 2021, 12:39, Frank Song, ITE, Standard Operation, TM4, UCx#35, Module Connection IMG_3742.jpgIMG_3741.jpgIMG_3743.jpgIMG_3744.jpg
 the module with target UC#35 was connected in ITE and being pumped down.
Entry  Wednesday, November 10, 2021, 08:32, Frank Song, ITW, Standard Operation, TM2, UC#36, Module Connection IMG_4323.JPG
 TM2 with target UC#36 was connected at ITW.