ID Date Author Category Type Module Target/Number Subjectdown
  2387   Tuesday, November 15, 2022, 13:33 Frank SongITWStandard OperationTM2UCx#40Module Connection

 TM2 with UCx#40 is connected in ITW.

Attachment 1: TM2_with_UCx#40_connection_in_ITW.png
TM2_with_UCx#40_connection_in_ITW.png
  2396   Thursday, December 01, 2022, 08:20 Frank SongITEStandard OperationTM4UCx#41Module Connection

 TM4 with UCx#41 was connected in ITE on Tuesday (2022-11-29) 

Attachment 1: TM4_with_UCx#41_connection_in_ITE.png
TM4_with_UCx#41_connection_in_ITE.png
  2440   Wednesday, May 10, 2023, 08:40 Frank SongITEStandard OperationTM4TiC#5Module Connection

 TM4 was connected in ITE.  pics attached FYI.

Attachment 1: TM4_with_TiC5_connection_in_ITE_20230509.png
TM4_with_TiC5_connection_in_ITE_20230509.png
Attachment 2: TM4_with_TiC5_all_set_in_ITE_20230510_758AM.JPG
TM4_with_TiC5_all_set_in_ITE_20230510_758AM.JPG
  2447   Monday, May 29, 2023, 12:52 Frank SongITWStandard OperationTM2TiC#6Module Connection

 TM2 with TiC#6 was connected in ITW (FEBIAD), turbo pumps were started successfully.

Attachment 1: TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf
TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf
  2465   Wednesday, July 19, 2023, 08:04 Frank SongITEStandard OperationTM4UCx#42Module Connection

 TM4 with new target UCx#42 was connected in ITE. 

Attachment 1: TM4_with_UCx42_connection_in_ITE_20230718.pdf
TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf
  2477   Tuesday, August 15, 2023, 13:58 Frank SongITWStandard OperationTM2Nb#10Module Connection

 TM2 with new target Nb#10 was moved to ITW from TCS and re-connected in pit. TPs are running at their full speed. 

Attachment 1: TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf
TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf
  2482   Tuesday, August 29, 2023, 09:28 Frank SongITWRepairTM2Nb#11Module Connection

 Module was connected yesterday and all turbo pumps are running at their top speed. 

Attachment 1: TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf
TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf
  2488   Wednesday, September 06, 2023, 08:07 Frank SongITEStandard OperationTM4Ta#65Module Connection

 TM4 was connected in ITE with new target Ta#65 installed. see attachment in detail.

Attachment 1: TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
  2493   Thursday, October 05, 2023, 13:50 Frank SongITWStandard OperationTM2Ta#66Module Connection

 TM2 with new target Ta#66 was connected in ITW. 

Attachment 1: TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
  2602   Tuesday, May 28, 2024, 13:49 Frank SongITWStandard OperationTM4UCx#45Module Connection

 TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with.

Attachment 1: TM4_with_UCx#45_connection_in_ITW_20240528.pdf
TM4_with_UCx#45_connection_in_ITW_20240528.pdf TM4_with_UCx#45_connection_in_ITW_20240528.pdf TM4_with_UCx#45_connection_in_ITW_20240528.pdf TM4_with_UCx#45_connection_in_ITW_20240528.pdf
  2625   Tuesday, June 25, 2024, 12:49 Frank SongITEStandard OperationTM3SiC#46Module Connection

 TM3 with new target SiC#46 was connected in ITE.

Attachment 1: TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf
TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf
  2642   Tuesday, July 16, 2024, 13:14 Frank SongITWStandard OperationTM4TiC#7Module Connection

 TM4 with TiC#7 was connected in ITW, all TPs are running at full speed.

Attachment 1: TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf
TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf
Attachment 2: MicrosoftTeams-image_(65).png
MicrosoftTeams-image_(65).png
  2657   Tuesday, August 13, 2024, 14:18 Frank SongITEStandard OperationTM2Ta#67Module Connection

 TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now.

Attachment 1: TM2_with_Ta#67_connection_in_ITE_20240813.pdf
TM2_with_Ta#67_connection_in_ITE_20240813.pdf TM2_with_Ta#67_connection_in_ITE_20240813.pdf TM2_with_Ta#67_connection_in_ITE_20240813.pdf TM2_with_Ta#67_connection_in_ITE_20240813.pdf
  2684   Tuesday, September 17, 2024, 13:42 Frank SongITWStandard OperationTM4TiC#9 Module Connection

 TM4 with target TiC#9 is connected in ITW. See attachment.

Attachment 1: TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
  2701   Wednesday, October 09, 2024, 14:04 Frank SongITEStandard OperationTM2Ta#68Module Connection

 TM2 with new target Ta#68 installed is connected in ITE. Pls see form attached.

Attachment 1: TM2_with_new_target_Ta#68_connection_in_ITE.pdf
TM2_with_new_target_Ta#68_connection_in_ITE.pdf TM2_with_new_target_Ta#68_connection_in_ITE.pdf TM2_with_new_target_Ta#68_connection_in_ITE.pdf TM2_with_new_target_Ta#68_connection_in_ITE.pdf
  2717   Tuesday, November 12, 2024, 12:30 Frank SongITWStandard OperationTM4UCx#46Module Connection

 TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls.

Attachment 1: TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
  2729   Wednesday, December 04, 2024, 08:05 Frank SongITEStandard OperationTM3UCx#47Module Connection

TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. 

Attachment 1: TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf
TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf
  2460   Tuesday, June 20, 2023, 12:37 Adam NewsomeAssembly/Bench TestDevelopment  Modifications to wire ropes for pails within existing F-308s

Based on a request from CNL (attached), modifications were made to the wire ropes protruding through the tops of F-308s to add a crimped loop which acts as a lifting feature. Tests were performed (report attached) on 10 sample units to validate the strength of these loops, since each loop could not be tested in-situ once the pails were already packed in F-308s. CNL has reviewed and approved the test report.

Wire ropes within the following F-308s, which were staged for shipping as of June 20, 2023, were modified to include the lifting loop:

  1. 06
  2. 13
  3. 15
  4. 16
  5. 19
  6. 20
  7. 21
  8. 22

Each lifting loop was:

  • Crimped according to the same procedure, using the same parts and tools, as the 10 sample units
  • Measured using a tape measure to confirm the 3" size specified by CNL
  • Checked using a go/no-go gauge provided from the crimp tool manufacturer
  • "Pull tested" by hand as a quick check to confirm the crimps were successful (not a quantitative and official test, but a secondary qualitative "feel good" check)

As of the time of writing this e-log, TRIUMF believes these F-308s to be ready to ship.

Attachment 1: PXL_20230620_182524722.jpg
PXL_20230620_182524722.jpg
Attachment 2: PXL_20230620_182446158.jpg
PXL_20230620_182446158.jpg
Attachment 3: PXL_20230620_182549601.jpg
PXL_20230620_182549601.jpg
Attachment 4: PXL_20230620_184840103.jpg
PXL_20230620_184840103.jpg
Attachment 5: Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf
Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf
Attachment 6: TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf
TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf
  2681   Monday, September 16, 2024, 08:23 chad fisherNorth Hot-CellRepair  Model N Remote end #9352 reapir

On Friday, September 6, 2024 Model 'N' remote arm #9352 was removed from the NHC right side installed position to investigate  an ongoing issue with the tong motion circuit (no motion on the remote side when handle on operator side operated).

Inspection revealed that the tong cable on this arm have hopped its cable drum and rapped around the shaft of the cable drum. As well, the tong cable had hopped a lower pulley and was jammed between the pulley and casting of the pulley housing. These issues were corrected and arm#9352 was reinstalled onto the right hand position. This repair resolved an ongoing tong motion system stemming from November 2023 described below.

initial tong motion problem from November 2023 when the tong system jammed, operator side arm #9763, remote arm #9342.

Remote arm #9342 was removed and replaced with arm #9352 as it was suspected there was a hopped cable on #9342. Upon removal it was confirmed the tong cable on remote arm #9342 had indeed hopped the pulley. After installation of the "spare" remote arm #9352 that hAd not been installed since previous servicing and should have been completely operational, it was found the tong system still did not work properly.

Upon thorough inspection of operator arm # 9763 it was found that the tong cable was prematurely reaching the end of its travel on its drum causing the inability to activate the circuit. The tong cable was reset on its drum as per manufacture's specs with one full cable rap on the drum and one full pretension wrap of the tong drum spring.

Although this resolved part of the problem and allowed a full squeeze of the operator handle it did not result in transfer of motion through the system to the remote end.

Further investigation continued, separating the operator side arm from the seal tube and testing the seal tube and operator side arm independently. Both systems worked fine independently, pointing to a potential problem between the seal tube and spring loaded coupler on the remote arm.

Remote arm #9352 was removed and couplers visually inspected and end of seal tube on the hot side was inspected and found that the pin in the end of the shaft on the tong circuit was not installed symmetrically which could cause uneven pressure on the spring loaded coupler of the remote arm. This pin was adjusted and all pins on the hot side of the seal tube were dimpled and loctite applied as a precautionary measure.

This still did not remedy the tong motion problem. These led to the September 6, 2024 removal and repair of remote arm #9352. This arm had previously been serviced by a CRL technician in December of 2017 and had not been installed or used since and should have been in operational status. It is still not clear why it was not.

 

 

  1555   Friday, June 09, 2017, 11:21 chad fisherNorth Hot-CellMaintenance  Model 'N' Slave Removal Through Roof

Isaac and Chad disengaged the slave end of the manipulator and performed a slave removal through the slave removal roof hatch. This is part of investigation into a 'Z' motion tape that is "rubbing" on its drum on the master side of the manipulator during manual 'Z' retraction of 'Z' extension.

This also was the first test of the concept of removing the manipulator slave through the manipulator hatch that was built into the roof.

The lifting bail on the slave end of the manipulator was not centered to the hatch as per design but this did not compromise the procedure at all and the procedure otherwise followed the design intent.

Pictures can be located on Docushare  http://documants.triumf.ca/docushare/dsweb/View/Collection-20157

 

 