ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  775   Monday, November 03, 2014, 10:27 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 has been moved from the south west
silo to the south hot cell.
  
  776   Monday, November 03, 2014, 11:16 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 InstalledThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs.
  
  777   Monday, November 03, 2014, 13:47 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Electrical checkTM#1 with ThO#1 electrical check see attatched
PDF for details.
 TM1_elec_check_ThO1_SHC.PDF 
  778   Tuesday, November 04, 2014, 11:05 David WangSouth Hot-CellStandard OperationTM1ThO#1Leak check on TM1 HS water line withThO#1 installed.Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec,
  
  779   Tuesday, November 04, 2014, 13:17 chad fisherSouth Hot-CellStandard OperationTM1ThO#1TM1 w/ ThO#1 readyTm1 with ThO#1 is buttoned up and ready
for transport.
  
  780   Wednesday, November 05, 2014, 10:20 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1module moveTM#1 with ThO#1 has been moved from the
south hot cell to the west target station.
  
  782   Thursday, November 06, 2014, 08:07 David WangITWStandard OperationTM1ThO#1TM1 has been connected in ITW.TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to
  
  783   Thursday, November 06, 2014, 08:55 David WangITWRepairTM1ThO#1 primary vacuum back up pressureITH CG1 ,CG2,CG4A were high.I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20
  
  785   Thursday, November 13, 2014, 13:52 David WangITWStandard OperationTM1ThO#15 Shielding blocks have been transferred from ITE to ITW.Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam.
  
  786   Thursday, November 13, 2014, 14:01 David WangITWRepairTM1 I replaced flow wheel and coil on ITW MSP water flow sensor.I replaced flow wheel and coil on ITW MSP
water flow sensor which is located in ITW
pit. Before replacement, I checked the signal
  
  856   Monday, March 09, 2015, 14:01 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 removedThO#1 has been removed from TM1 and placed
into the plastic dissection box.
Containment box cover has been reinstalled
  
  857   Tuesday, March 10, 2015, 09:01 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Module moveTM#1 has been moved from the west station
to the south hot cell had the ThO#1 target
removed and then the modules was moved from
 TM1_THO_elec_chk_postbeamSHC.PDF 
  860   Thursday, March 12, 2015, 13:33 Anders MjosSouth Hot-CellStandard OperationTM1ThO#1Target inspectionChad, Anders and Alex inspected the target
this morning. The target had no significant
visible damage to the container. Some material
  
  887   Friday, April 17, 2015, 09:09 Travis CaveSouth Hot-CellStandard OperationTM1No targetModule moveTM#1 with no target has been moved from
the south west silo to the south hot cell
for the installation of the UCx target.
  
  888   Friday, April 17, 2015, 11:56 Travis CaveSouth Hot-CellStandard OperationTM1UC#12Electrical checkElectrical check of TM#1 with UCx#12 attached.
See attached PDF for details.
 TM1_UC#12_tgt_elec_chk_SHC.PDF 
  889   Friday, April 17, 2015, 14:04 Travis CaveSouth Hot-CellStandard OperationTM1UC#12Module moveTM#1 with UCx#12 has been moved from the
south hot cell to the conditioning station.
  
  891   Monday, April 20, 2015, 10:12 Anders MjosConditioning StationStandard OperationTM1UC#12Conditioning UC#12Monday, April 20, 2015, 09:35: Started
cooling water circulation
HV cover did not fit due to interference
  
  892   Monday, April 20, 2015, 10:22 David WangConditioning StationStandard OperationTM1UCx12TM1 with UCx12 has been connected to CS and ready for conditioing.The TH will be locked during the TM1 conditioning
time due to  an interference issue between
CS HV cover and a gas analysis valve on top
  
  894   Tuesday, April 21, 2015, 17:14 Isaac EarleSouth Hot-CellStandard OperationTM1UC#12UC#12 Installed in TM1On Friday April 17th, UC#12 target was
installed in TM1.  One of the copper
water lines was bent slightly as the target
 IMG_4836.JPGIMG_4833.JPG 
  895   Wednesday, April 22, 2015, 11:05 David WangConditioning StationStandard OperationTM1 electrical check on TM1 at CS under vacuumI did an electrical check on TM1 at CS.
The resistance check:A-B 3.918m ohm, A-C
5.905m ohm,A-D 4.070m ohm,B-C5.462m ohm,B-D3.633m
  