ID Date Author Category Type Module Target/Numberdown Subject
  1007   Tuesday, July 21, 2015, 12:38 David WangITWRepair  ITW external water leak on dump circuit has been fixed.

The leaking 1/8 NPT(M)-1/4NPT(F) adapter on the ITW dump circuit is replaced.

  1009   Wednesday, July 22, 2015, 12:13 chad fisherSouth Hot-CellRepairTM2 TM2 Short Findings

Pin X was unplugged, short remained, however any slight pressure on the block towards the source tray makes the short go away.

Confirmed clearance between the EE and thr R / U coil lines as well as MSP of coil line.

Camera inspection would seem to indicate that ALL issues stem from a common location...there is a spot where both the pin X waterline and the one of the R / U waterline  contact the heat shield waterline...one on one side of the heat shield line and the other on the other side.

 

 

Attachment 1: TM2_Short_July_22.jpg
TM2_Short_July_22.jpg
  1010   Thursday, July 23, 2015, 10:23 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - August 019 2015

Update Target Hall schedule after the changing on TM2 process. See attachment 1,2

Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp
  1011   Friday, July 24, 2015, 10:04 David WangITEStandard Operation  5 Shielding blocks have been moved from ITE to block storage area.

Dan and I moved 5 shielding blocks from ITE to block storage area. The move is smooth.

  1016   Monday, July 27, 2015, 15:34 David WangITEStandard OperationTM4 Leak check on TM4 HS water line with new UCX target. at SHC

Chad and I leak checked the HS line at SHC after UCX target installation. On first round helium spray, one of VCR fitting has a leak to E-6 atm.cc/sec range. Chad tightened the fitting, and solved the problem. We leak checked both VCR fittings twice. No leak. The line will be helium pressured at CS tomorrow.

  1017   Monday, July 27, 2015, 15:46 David WangSouth Hot-CellStandard Operation  The yellow steel plug is put on SHC in TH

The yellow steel plug is put on SHC in TH. The spent target is inside the SHC.The field around the SHC area in TH is so high that we have put it on. It will be moved out on this Thursday just before the spent target move. 

  1020   Tuesday, July 28, 2015, 10:17 David WangITERepair  ITE TP4 has been replaced

Tony and I replaced the ITE TP4 turbo pump today. The pumping time on controller has been reset to 0. The replaced broken  pump is bagged and stored at west end of TH.

  1026   Wednesday, July 29, 2015, 10:14 David WangITEStandard OperationTM4 TM4 has been connected in ITE

Dan and I connected TM4 in ITE. We checked all water signals on ITE cooling circuits. Everything is good.

  1028   Friday, July 31, 2015, 09:47 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - August 019 2015

Weekly update of Target Hall schedule after so many jobs have been finished in this week.  See attachment 1, 2

Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp
  1029   Thursday, August 06, 2015, 10:26 Travis CaveSpent Target VaultStandard Operation  Spent Target Measurments and Assays

All targets but one ( SiC#31 went in last week) have been measured or assayed. See attached PDF for the details.

Attachment 1: Vault_Storage_August_6_2015.pdf
Vault_Storage_August_6_2015.pdf Vault_Storage_August_6_2015.pdf Vault_Storage_August_6_2015.pdf Vault_Storage_August_6_2015.pdf
  1031   Friday, August 07, 2015, 10:01 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - August 19 2015

Weekly update target hall schedule and activities. See attachment 1,2

Update and extend Target Hall schedule to Sep 08.  See attachment 3,4

Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdf
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp
Attachment 3: Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.mpp
Attachment 4: Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf
Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf
  1032   Monday, August 10, 2015, 14:07 Isaac EarleSouth Hot-CellRepairTM2 TM2 Containment Box Removed

The containment box was taken off TM2 in preparation for installation of a new coil line isolator.

ITA6272 and ITA6273 have been received from the Scintillator Shop.  ITA6274 should be ready by the end of today.

  1033   Thursday, August 13, 2015, 09:17 chad fisherSouth Hot-CellRepairTM2 TM2 status

Tuesday, August 11,  insulator ITA6272 was installed onto the "pin x" line (unused plasma electrode) and tested; it seems to have successfully eliminated the shorts on that line.

Wednesday, August 12  "shunts" installed on tube heater and oven circuit and electrically  tested.

Thursday , August 13, dummy target installed.

 

Attachment 1: 20150811_132709.jpg
20150811_132709.jpg
Attachment 2: 20150813_083255.jpg
20150813_083255.jpg
Attachment 3: 20150813_090814.jpg
20150813_090814.jpg
  1035   Thursday, August 13, 2015, 13:46 chad fisherSouth Hot-CellRepairTM2 TM2 Status

As previously mentioned, dump target installed with new mounting and high current fasteners.

Leak Check complete and ready to move to CS at 1:30

  1038   Friday, August 14, 2015, 10:00 David WangConditioning StationRepairTM2 Started CS water package for TM2

I finished the rest TM2 connections to CS, and started CS cooling package. Everything works fine so far.

  1040   Wednesday, August 19, 2015, 14:52 David WangConditioning StationRepairTM2 TM2 at CS

During the TM2 HV test at CS, It failed. In order to confirm there is no any water leak inside the module after the heaters and beam extraction test, I disconnected all the water lines on the TM2, and purged the water lines with pressure air. Leak detector was reconnected back to the TM2 service cap, and all water lines are pressurized with 80psi helium again each for 2 minutes.No any leak had been found during the test. All the water lines are still perfectly sealed. Also, I checked all the vacuum to air seals on the top of the module.They are good either.  Anders used the RGA  tracking the helium during the test. No leak.

  1041   Thursday, August 20, 2015, 09:38 David WangConditioning StationRepairTM2 TM2 was disconnected at CS

TM2 was disconnected at CS. Travis and I did  electrical check before the venting. After,The module was vented and moved to SHC. The moving is smooth.

  1044   Thursday, August 20, 2015, 13:48 David WangConditioning StationStandard OperationTM2 Target Hall Scheduled Activities April 07 - Sep 08 2015

 Weekly update target hall schedule.See attachment 1,2

Spring and summer run is close to the end. This will be the last update on this old schedule. See attachment3,4.    A new schedule for TH activities after mini shut down will be posted next time.

Attachment 1: Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf
Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf
Attachment 2: Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.mpp
Attachment 3: Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.mpp
Attachment 4: Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf
Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf
  1048   Wednesday, August 26, 2015, 09:54 Anders MjosConditioning StationMaintenance  Topped up water in TCS:TK2

 Filled to 24.9 in

  1058   Tuesday, September 01, 2015, 10:38 David WangITWMaintenanceTM2 ITW top tank flange clean up and r-ring replacement.

During last run, ITW dump circuit had a water leak on an adaptor below the pressure gauge. The top tank flange, slot, and O-ring were water contaminated by the leak. I removed the old o- ring, cleaned up the flange and o-ring slot, and put a new o-ring into the flange. Some  pictures will be attached in this mail later.

Attachment 1: ITW_o-ring_replacement_2015-09-01_008.JPG
ITW_o-ring_replacement_2015-09-01_008.JPG
Attachment 2: ITW_o-ring_replacement_2015-09-01_007.JPG
ITW_o-ring_replacement_2015-09-01_007.JPG
Attachment 3: ITW_o-ring_replacement_2015-09-01_006.JPG
ITW_o-ring_replacement_2015-09-01_006.JPG