120
|
Thursday, June 07, 2012, 11:58 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta38 | Module Move from SHC to TCS | TM1 was moved from SHC to the TCS. The
mode took roughly 1 hour. During the move
the north east corner of the containment |
|
|
255
|
Friday, March 08, 2013, 15:50 |
Bevan Moss | ITE | Standard Operation | TM4 | CS Test Target #1 | Module Move from ITE to SHC | Today David and I moved the module
from ITE to the SHC. Move went very smoothly,
David operated the cameras and has had basic |
|
|
193
|
Tuesday, October 09, 2012, 11:17 |
Bevan Moss | ITE | Standard Operation | TM4 | NiO#1 | Module Move | TM4 with NiO#1 was moved from ITE
to the SHC today. The move went well with
no issues. |
|
|
195
|
Tuesday, October 09, 2012, 14:53 |
Bevan Moss | Conditioning Station | Development | TM4 | UCx#5 | Module Move | TM4 was remote moved from the SCH to the
TCS today. This was the first time the module
was moved with the framework for the cage |
|
|
260
|
Wednesday, March 13, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Module Move | TM4 with CS Test Target #1 was moved
from the SHC to the Conditioning Station.
All went well. The welding cables came a |
|
|
2164
|
Tuesday, November 17, 2020, 10:17 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | Module Move | TM2 has been moved from ITW to the South
Hot Cell.
|
|
|
2168
|
Tuesday, November 24, 2020, 09:37 |
Adam Newsome | ITW | Standard Operation | TM2 | | Module Move | TM2 has been moved from
the Conditioning Station to ITW. |
|
|
2170
|
Wednesday, November 25, 2020, 09:05 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | Module Move | TM3 has been moved from
the Silo to the South Hot Cell. |
|
|
2263
|
Tuesday, November 09, 2021, 14:35 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | UCX#36 | Module Move | TM#2 was moved from ITW to SHC,
then moved back to ITW. |
|
|
2246
|
Friday, September 17, 2021, 12:34 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | Module Connection | TM4 with a new target was moved back
from NHC to ITE and reconnected at pit. The
5 shielding blocks were installed as well. |
|
|
2252
|
Monday, October 04, 2021, 09:27 |
Frank Song | ITW | Standard Operation | TM2 | C#3 | Module Connection | TM2 been connected with new target
C#3 in ITW. |
|
|
2258
|
Friday, October 08, 2021, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | Module Connection | the module with target UC#35 was
connected in ITE and being pumped down. |
|
|
2265
|
Wednesday, November 10, 2021, 08:32 |
Frank Song | ITW | Standard Operation | TM2 | UC#36 | Module Connection | TM2 with target UC#36 was connected
at ITW. |
|
|
2316
|
Thursday, April 28, 2022, 07:24 |
Frank Song | ITW | Standard Operation | TM2 | Febiad Test Target | Module Connection | TM2 was connected in ITW with a Febiad
Test Target. |
|
|
2328
|
Tuesday, June 07, 2022, 14:15 |
Frank Song | ITE/ITW | Standard Operation | TM2 | SiC#42 | Module Connection | TM2 with Febiad target SiC#42 was
connected in ITW. |
|
|
2334
|
Tuesday, June 21, 2022, 18:30 |
Frank Song | ITW | Standard Operation | TM2 | SiC#43 Febiad | Module Connection | TM2 with Febiad Target SiC #43 was
connected in ITW. NOTE: the number of TARGET
in attached picture should be #43. |
|
|
2341
|
Tuesday, June 28, 2022, 14:13 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | Module Connection | TM4 with Ta#64 was connected in ITE.
see attachment please. |
|
|
2350
|
Wednesday, July 27, 2022, 08:11 |
Frank Song | ITW | Standard Operation | TM2 | UCx#38 | Module Connection | TM2 with Target UCx#38 was connected
in ITW. |
|
|
2365
|
Tuesday, September 13, 2022, 14:10 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | Module Connection | TM2 with UCx#39 is connected in ITW. |
|
|
2376
|
Tuesday, October 11, 2022, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | C#4 | Module Connection | TM4 with Target C#4 was connected
in ITE. |
|