|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
1546
|
Tuesday, May 23, 2017, 10:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#20 | Module move | TM#4 with UC#20 has been moved from
the conditioning station to the east target
station. |
|
|
1547
|
Tuesday, May 23, 2017, 13:30 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE | Yasmine and I connected TM4 in ITE . All
turbo pumps are started. |
|
|
1548
|
Tuesday, May 23, 2017, 14:10 |
David Wang | ITE | Standard Operation | | | ITE water interlock check is done. | We do this check once a year now. Rene
found a target oven reset issue during the
check . He will consult with Friedhelm. The |
|
|
1581
|
Tuesday, July 11, 2017, 10:20 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#52 | Module move | TM#4 with Ta#52 has been moved from
the conditioning station to the east target
station. |
|
|
1602
|
Monday, August 28, 2017, 11:28 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#52 | Module move | TM#4 with Ta#52 has been moved from
the east station to the south hot cell. |
|
|
1610
|
Tuesday, September 05, 2017, 10:25 |
Travis Cave | ITE | Standard Operation | TM4 | UC#21 | Module move | TM#4 with UC#21 has been moved from
the conditioning station to the east target
station. |
|
|
1651
|
Tuesday, October 24, 2017, 11:58 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#37 | Module move | TM#4 with SiC#37 has been moved from
the conditioning station to the east target
station. A measurement was taken on TM#4 |
|
|
1652
|
Thursday, October 26, 2017, 09:56 |
Anders Mjos | ITE | Repair | TM4 | SiC#37 | Leak on multi pin connector feedthrough | On maintenance day Tuesday, the roughing
of the target station could not go below
1.5 Torr. A brief troubleshooting on Tuesday |
|
|
1672
|
Tuesday, January 02, 2018, 11:28 |
David Wang | ITE | Standard Operation | TM4 | | ITE annual water interlock check. | Eric and I finished ITE annual water interlock
check. Everything works properly. |
|
|
1685
|
Tuesday, February 13, 2018, 13:54 |
Anders Mjos | ITE | Standard Operation | TM4 | SiC#37 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th |
|
|
1689
|
Wednesday, February 28, 2018, 14:47 |
David Wang | ITE | Standard Operation | | | leak check ITE primary and secondary vacuum vessel. | 2018-02-27: Anders and I finished leak
check on ITE primary and second vacuum vessel
seals. LD connected to ITE BV2 valves between. |
|
|
1706
|
Tuesday, May 01, 2018, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#37 | Module move | TM#4 with SiC#37 has been moved from
the East Target Station to the South Hot
cell. |
|
|
1721
|
Thursday, May 24, 2018, 10:02 |
Anders Mjos | ITE | Development | TM4 | Empty | Module move ventilation test | The new module move ventilation procedure
was successfully tested (ITM:MP2). ITM:CM4
did not drop below 6 in during the test. |
|
|
1731
|
Thursday, June 07, 2018, 11:37 |
Travis Cave | ITE | Standard Operation | TM4 | UC#22 | Module move | TM#4 ,with UC#22, was moved from
the south hot cell to the east target station.
Upon lowering the module down it made contact |
|
|
1732
|
Friday, June 08, 2018, 10:22 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Module move |
|
|
|
1737
|
Thursday, June 14, 2018, 11:37 |
David Wang | ITE | Standard Operation | TM4 | UC#22 | TM4 UC 22# checklist. | See attachments |
|
|
1753
|
Monday, July 16, 2018, 17:41 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Target module disconnected | The water and electrical connections were
disconnected today as protons remained off
after power interruption during the weekend. |
|
|
1757
|
Monday, July 23, 2018, 10:31 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#56 | Module move | TM#4 with Ta#56 has been moved from
the conditioning station to the east target
station. |
|
|
1770
|
Tuesday, August 28, 2018, 14:19 |
David Wang | ITE | Standard Operation | TM4 | Ta#56 | TM4 Ta#56 disconenction. | TM4 has been disconnected in ITE this morning.
See attachment. |
|
|
1778
|
Friday, September 07, 2018, 10:47 |
David Wang | ITE | Repair | TM4 | UCx24 | TM4 TP2 replacement | TM4 TP2 could not be started after
module was connected back to ITE on Sep 04th.
It was replaced with a new pump on Sep 05th. |
|