1344
|
Tuesday, September 06, 2016, 10:05 |
David Wang | ITW | Standard Operation | TM2 | | 5 Shielding blocks have been transferred from ITE to ITW. | 5shielding blocks have been transferred
from ITE to ITE. ITW is configured to take
proton beam. |
|
1347
|
Thursday, September 08, 2016, 16:28 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 blue insulators have been replaced. | All TM3 blue insulators except Gas,EL,
and 60 KV common on top of the module
have been replaced with new designed insulators. |
|
1348
|
Thursday, September 08, 2016, 16:30 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 vacuum system have been connected at TCS. | start of roughing now.
start of TCS and TM3 turbo-pumps.
Everything is good so far. |
|
1349
|
Monday, September 12, 2016, 09:25 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 leak checked at TCS | After blue insulators replacement, TM3
service cap are leak checked. LD base leak
rate 0.0xe-9 atm.cc/sec. I sprayed lots helium |
|
1351
|
Wednesday, September 14, 2016, 11:54 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 is disconnected at TCS. | TM3 is disconnected at TCS and ready
to be moved to silo. |
|
1354
|
Monday, September 19, 2016, 08:28 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Post new target hall Excel sheet
schedule for beam schedule 131. See attachment
1,2 |
   |
1356
|
Tuesday, September 20, 2016, 11:41 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been disconnected in ITE. | TM4 has been disconnected in ITE. No water
line purge on HS and 3 water circuits are
looped after disconnection. The HALCW system |
|
1357
|
Tuesday, September 20, 2016, 11:48 |
David Wang | Assembly/Bench Test | Development | | | A silo and blue steel frame are removed out of TH | A silo and blue steel frame are removed
out of TH this morning. They are transferred
through ante room, and moved to experimental |
|
1358
|
Thursday, September 22, 2016, 13:04 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SHC, TM4 leak check on HS line. | Chad and I leak checked the TM4 HS line
after new target installation. base leak
rate:0.0Xe-9 atm.cc/sec. No response |
|
1359
|
Friday, September 23, 2016, 07:49 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been moved and connected at TCS | All TCS and TM4 turbo-pumps were started
yesterday. Overnight pumping down is good
so far. |
|
1363
|
Tuesday, September 27, 2016, 07:30 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been disconnected at TCS | TCS water system and vacuum system are
turned off this morning. The TCS and
TM4 are vented. |
|
1365
|
Wednesday, September 28, 2016, 13:43 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected at ITE | All ITE turbo pumps have been started since
yesterday afternoon. The ITE and TM4 pumping
down is good so far. |
|
1366
|
Wednesday, September 28, 2016, 13:47 |
David Wang | Conditioning Station | Standard Operation | | | TCS pumping down during mini-shut down. | A steel plate is covered on TCS.
TCS roughing pump is started now. The
TCS will be pumping down during mini-shut |
|
1367
|
Friday, September 30, 2016, 14:34 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Weekly update TH schedule for beam schedule
131. See attachments 1,2 |
 |
1368
|
Tuesday, October 04, 2016, 09:18 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
1370
|
Wednesday, October 12, 2016, 10:00 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnected at ITW | TM2 was disconnected at ITW. 3 water circuits
in ITW gave been looped to keep 75 GPM water
flow to ITW. HS line was purged at HS. RPG |
|
1371
|
Wednesday, October 12, 2016, 10:01 |
David Wang | Conditioning Station | Standard Operation | | | TCS pumps are stopped | Argon venting is started |
|
1381
|
Monday, October 24, 2016, 14:54 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I did the leak check on TM2 heat
shield line. LD base leak rate:0.0xE-9atm.cc/sec.
Base pressure:0.0X E-9 torr. The line is |
|
1383
|
Tuesday, October 25, 2016, 15:10 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW | All turbo pumps are started. Two gas valves
for Febiad run are opened. Pumping down is
good so far. |
|
1384
|
Wednesday, October 26, 2016, 12:33 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Update TH schedule after job delay on TM2
Febiad target. Everything should be back
to schedule on last two targets. See attachments. |
  |