  1301   Wednesday, August 03, 2016, 09:45 David WangConditioning StationStandard OperationTM4UC#17Helium pressure test on TM4 HS line at TCS

Helium pressure test on TM4 HS line at TCS  is done.Leak detector 0.0X E-9atm.cc/sec.  5minutes, 70psi helium.    No response on LD.

  1302   Wednesday, August 03, 2016, 09:49 David WangConditioning StationStandard OperationTM4 TM4 is ready for conditioing at TCS.

I started TCS water system and installed HV cover onto TM4.  The TM4 containment box is supplied with water also. TM4 is ready for conditioning at TCS.

  1303   Wednesday, August 03, 2016, 09:56 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)

Update schedule weekly. See attachments 1,2

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.mpp
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.pdf
Target_Hall_shedule_130_Apr_to_Sep.pdf
  1309   Tuesday, August 09, 2016, 07:15 David WangConditioning StationStandard OperationTM4UCx17TM4 has been disconnected at TCS

I stopped TCS water pumps this morning . The argon venting for TCS is in processing.

  1313   Wednesday, August 10, 2016, 11:30 David WangITEStandard OperationTM4UC#17TM4 has been connected at ITE

Dan and I connected TM4 in ITE yesterday. It is pumping down at ITE now. Everything is fine so far.

  1316   Thursday, August 11, 2016, 10:37 David WangConditioning StationRepairTM3  TM3 service tray cover plate ITA2108 has been removed.

Requested by Aurelia, and approved by Friedhelm, TM3 service tray cover plate ITA2108 has been remove out of the module. The plated is checked for active and contamination after removal. Then,It is double bagged, sealed ,  tagged, and placed downstairs in TH between south wall and green block . The ram contact reading on the plate is about 10 usv/hr.  We will do anther TM3 HV test at TCS without this cover plate.

  1319   Monday, August 15, 2016, 10:08 David WangITEStandard OperationTM4UC#175 Shielding blocks have been transferred from ITW to ITE.

Dan and I transferred 5 shielding blocks from ITW to ITE. The ITE is configured to take proton beam.

  1320   Monday, August 15, 2016, 10:15 David WangConditioning StationStandard OperationTM4 Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)

Weekly update target hall schedule. Everything on schedule are finished  on time.   See attachment.  

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.pdf
Target_Hall_shedule_130_Apr_to_Sep.pdf
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
  1322   Tuesday, August 16, 2016, 12:35 David WangConditioning StationRepairTM3  CS vacuum pumps have been stopped

The TCS is venting now. The TM3 blue insulator replacement job will be started soon.

  1331   Wednesday, August 24, 2016, 10:41 David WangITWStandard OperationTM2 TM2 was disconnected in ITW yesterday.

TM2 was disconnected in ITW yesterday and moved to SHC.

  1332   Wednesday, August 24, 2016, 10:44 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.

Chad and I leak checked Tm2 Hs line with new target installed. Base LR 0.0Xe-9 atm.cc/sec.   No leak has been found. This line will be helium pressured at TCS later.

  1333   Wednesday, August 24, 2016, 10:45 David WangConditioning StationStandard OperationTM2 TM2 vacuum system has been connected at TCS

Start of roughing now.

  1337   Thursday, August 25, 2016, 08:36 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 HS water lline

I did a helium pressure test on TM2 HS water line at TCS. Leak detector base leak rate only could get to 1.8x e-8 atm.cc/sec at this moment. Applied 5 minutes 70psi helium on it. No leak has been found at this level. I connected water to this circuit after the test for weekend TM2 conditioning at TCS.

I will do another helium pressure test after the conditioning. The LD base leak rate should be 0.0Xe-9 atm.cc/sec at that time.

2016-08-29: LD Base leak rate 0.0xe-9atm.cc/sec.TM2 HS line helium pressure check again after conditioning. 70psi helium 5minutes. no response on LD. HS line is perfectly sealed.

  1338   Thursday, August 25, 2016, 08:43 David WangConditioning StationStandard OperationTM2 All TM2 connections to TCS are done.

The HV cover is installed. The Faraday cage at B2 level is locked also.The TCS and TM2 are still pumping down. Everything is good so far.

  1339   Thursday, August 25, 2016, 13:59 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep, 2016)

Weekly update schedule.  See attachment 1,2.

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.pdf
Target_Hall_shedule_130_Apr_to_Sep.pdf
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
  1341   Monday, August 29, 2016, 13:34 David WangConditioning StationStandard OperationTM2 TM2 has been disconnected at TCS

I stopped TCS water pumps and vacuum pumps also.   TM2 and TCS will be vented tomorrow morning.

  1343   Tuesday, August 30, 2016, 13:17 David WangITWStandard OperationTM2 TM2 has been connected at ITW

  ITW turbo pumps  have been started.

  1344   Tuesday, September 06, 2016, 10:05 David WangITWStandard OperationTM2 5 Shielding blocks have been transferred from ITE to ITW.

5shielding blocks have been transferred from ITE to ITE. ITW is configured to take proton beam.

  1347   Thursday, September 08, 2016, 16:28 David WangConditioning StationRepairTM3 TM3 blue insulators have been replaced.

All TM3 blue insulators except Gas,EL, and 60 KV common  on top of the module have been replaced with new designed insulators. The new blue insulator for gas line need to be modified to fit for the bent on the gas  line.   EL, and 60KV common blue insulators were replaced during last time TM3 refurbishment so they are relative new, and  not replaced this time. All seals related to the blue insulators are changed to new seals. The o- r-ing surfaces  for o-ring 221 inside the  new insulators  are rougher than old parts. The module top need to be leak checked.

  1348   Thursday, September 08, 2016, 16:30 David WangConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.

start of roughing now.

 start of TCS and TM3 turbo-pumps. Everything is good so far.