Entry  Tuesday, August 30, 2016, 13:17, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected at ITW 
  ITW turbo pumps  have been started.
Entry  Tuesday, September 06, 2016, 10:05, David Wang, ITW, Standard Operation, TM2, , 5 Shielding blocks have been transferred from ITE to ITW. 
5shielding blocks have been transferred from ITE to ITE. ITW is configured to take proton beam.
Entry  Thursday, September 08, 2016, 16:28, David Wang, Conditioning Station, Repair, TM3, , TM3 blue insulators have been replaced. 
All TM3 blue insulators except Gas,EL, and 60 KV common  on top of the module have been replaced with new designed insulators. The new blue insulator
for gas line need to be modified to fit for the bent on the gas  line.   EL, and 60KV common blue insulators were replaced during last time
TM3 refurbishment so they are relative new, and  not replaced this time. All seals related to the blue insulators are changed to new seals. The o-
Entry  Thursday, September 08, 2016, 16:30, David Wang, Conditioning Station, Repair, TM3, , TM3 vacuum system have been connected at TCS. 
start of roughing now.
 start of TCS and TM3 turbo-pumps. Everything is good so far.
Entry  Monday, September 12, 2016, 09:25, David Wang, Conditioning Station, Repair, TM3, , TM3 leak checked at TCS 
After blue insulators replacement, TM3 service cap are leak checked. LD base leak rate 0.0xe-9 atm.cc/sec. I sprayed lots helium on all blue insulator
seals. No leak has been found. Double checked them again, and got same result. All other seals on top of TM3 also have been checked. They are leak free.
OVEN, TUBE, MSP, COIL, and EE water lines are pressurized with 70 psi helium for 3minutes each. They are good also.
Entry  Wednesday, September 14, 2016, 11:54, David Wang, Conditioning Station, Repair, TM3, , TM3 is disconnected at TCS. 
 TM3 is disconnected at TCS and ready to be moved to silo.
Entry  Monday, September 19, 2016, 08:28, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 131(Sep-Dec, 2016) Target_Hall_shedule_131__Sep_to_Dec_2016.pdfTarget_Hall_shedule_131__Sep_to_Dec_2016.xlsxTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131_Sep_to_Dec.pdf
Post new  target hall Excel sheet schedule for beam schedule 131. See attachment 1,2
Post new target hall  MS project schedule for beam schedule131. See attachment 3,4
Entry  Tuesday, September 20, 2016, 11:41, David Wang, ITE, Standard Operation, TM4, , TM4 has been disconnected in ITE. 
TM4 has been disconnected in ITE. No water line purge on HS and 3 water circuits are looped after disconnection. The HALCW system resistivity is stable
before and after this disconnection.
Entry  Tuesday, September 20, 2016, 11:48, David Wang, Assembly/Bench Test, Development, , , A silo and blue steel frame are removed out of TH  
A silo and blue steel frame are removed out of TH this morning. They are transferred  through ante room, and moved to experimental hall TM assembly
area for a long term storage. Swipes are done on the silo and frame before and during move. No contamination has been found .
Entry  Thursday, September 22, 2016, 13:04, David Wang, South Hot-Cell, Standard Operation, TM4, , SHC, TM4 leak check on HS line. 
Chad and I leak checked the TM4 HS line after new target installation. base leak rate:0.0Xe-9 atm.cc/sec.  No response on LD during the leak check.
The line is leak free so far. It will be helium pressurized at TCS  late.
Entry  Friday, September 23, 2016, 07:49, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been moved and connected at TCS 
All TCS and TM4 turbo-pumps were started yesterday. Overnight pumping down is good so far.
Entry  Tuesday, September 27, 2016, 07:30, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been disconnected at TCS 
TCS water system and vacuum system are turned  off this morning. The TCS and TM4 are vented.
Entry  Wednesday, September 28, 2016, 13:43, David Wang, ITE, Standard Operation, TM4, , TM4 has been connected at ITE 
All ITE turbo pumps have been started since yesterday afternoon. The ITE and TM4 pumping down is good so far.
Entry  Wednesday, September 28, 2016, 13:47, David Wang, Conditioning Station, Standard Operation, , , TCS pumping down during mini-shut down. 
A steel plate  is covered on TCS. TCS roughing pump  is started now. The TCS will be pumping down during mini-shut down.
Entry  Friday, September 30, 2016, 14:34, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 131(Sep-Dec, 2016)  Target_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131_Sep_to_Dec.pdf
Weekly update TH schedule for beam schedule 131. See attachments 1,2
Entry  Tuesday, October 04, 2016, 09:18, David Wang, ITE, Standard Operation, TM4, , 5 Shielding blocks have been transferred from ITW to ITE. 
The ITE is configured to take proton beam.
Entry  Wednesday, October 12, 2016, 10:00, David Wang, ITW, Standard Operation, TM2, , TM2 was disconnected at ITW 
TM2 was disconnected at ITW. 3 water circuits in ITW gave been looped to keep 75 GPM water flow to ITW. HS line was purged at HS. RPG got the water sample.
Entry  Wednesday, October 12, 2016, 10:01, David Wang, Conditioning Station, Standard Operation, , , TCS pumps are stopped 
Argon venting is started
Entry  Monday, October 24, 2016, 14:54, David Wang, South Hot-Cell, Standard Operation, TM2, , SHC, TM2 leak check on HS line. 
Chad and I did the leak check on TM2 heat shield line. LD base leak rate:0.0xE-9atm.cc/sec. Base pressure:0.0X E-9 torr. The line is leak free.
Entry  Tuesday, October 25, 2016, 15:10, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected at ITW 
All turbo pumps are started. Two gas valves for Febiad run are opened. Pumping down is good so far.