ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  24   Wednesday, August 24, 2011, 16:35 Bevan MossSouth Hot-CellRepairTM1UCx#2Move, inspection and repair On August 22nd TM1 was vented with
Argon in the conditioning station. It had
been pumping with just the roughing pump
 2011-08-23-17-41-40.UCx_Leak_August_22_2011.jpg 
  25   Wednesday, August 24, 2011, 17:11 Bevan MossConditioning StationStandard OperationTM1UCx#2Leak Check, HV conditioning and Module MoveToday a leak check on TM1's external seals
and the heat shield line was completed by
David Wang. After 16 hours of the turbo pumps
  
  26   Thursday, September 01, 2011, 09:11 Don JacksonITWStandard OperationTM1UCx#2Argon Venting West StationWest target station is setup to use argon
for tank venting.  There is 1200 PSI
remaining on argon bottle in electrical room. 
  
  32   Monday, October 03, 2011, 11:00 Travis CaveITWStandard OperationTM1UCx#2Move from west station to south hot cellTM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well.
  
  33   Monday, October 03, 2011, 11:54 chad fisherSouth Hot-CellStandard OperationTM1UCx#2 - TaC#1Target change UCx#2-TaC#1UCx#2 has been removed from Tm1 and put
in a bucket with a slow argon feed and a
lid placed lossely on top.
  
  34   Monday, October 03, 2011, 14:52 Travis CaveSouth Hot-CellStandard OperationTM1TaC#1Electrical checkTM#1 with TaC#1 installed passed the electrical
test. With a value of 882MOhms that was meggered
from the heat shield to the chassis, all
  
  35   Tuesday, October 04, 2011, 14:13 Travis CaveITWStandard OperationTM1TaC#1Move ot TM#1Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station.
  
  50   Monday, November 14, 2011, 14:07 Travis CaveITWStandard OperationTM1TaC#1Module moveTM#1 with TaC#1 from the west target station
to the south hot cell. Move went well.
  
  51   Tuesday, November 15, 2011, 13:08 Travis CaveConditioning StationStandard OperationTM1 Move ot TM#1TM#1 has been moved from the south hot
cell to the conditioning station. Move went
well.
  
  52   Wednesday, November 16, 2011, 07:44 chad fisherSouth Hot-CellStandard OperationTM1TaC#1TaC#1 Removal and inspectionNovember 15, 2011 removed TaC#1 from TM1
and inspected TM1 for any obivous signs of
trouble (Problems with EE at end of run).
  
  53   Wednesday, November 16, 2011, 07:46 chad fisherSouth Hot-CellStandard OperationTM1TaC#1Inspection of TaC#1Inspection of TaC#1 showed that the oven
was indeed broken on the A+ (left oven leg)
side of the central block.
  
  55   Thursday, November 17, 2011, 11:52 Travis CaveConditioning StationStandard OperationTM1no targetModule moveTM#1 moved from the conditioning station
to the south hot cell. Move went well.
  
  56   Friday, November 18, 2011, 09:44 Travis CaveSouth Hot-CellStandard OperationTM1UCx#3Electrical checkElectrical checks of TM#1 with UCx#3 have
been completed. They all appear to be with
in operational range. All megger checks were
 ITW_UC#3_Elec_check.PDF 
  57   Friday, November 18, 2011, 09:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 InstallationUCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9
  
  58   Friday, November 18, 2011, 11:09 Travis CaveConditioning StationStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 has been moved from the
south hot cell to the conditioning station.
Move went well.
  
  59   Friday, November 18, 2011, 16:29 Bevan MossConditioning StationStandard OperationTM1N/AHigh Voltage (HV) testing TM1 was high voltage tested without
a target on November 16, 2011 with Don Jackson,
Pierre Bricault, and Bevan Moss. The module
 TM1_High_Voltage_Test_Nov_16_2011.JPG 
  60   Monday, November 21, 2011, 13:49 David WangConditioning StationStandard OperationTM1 TM1 full leak check in conditioning stationTM1 full leak check in conditioning station
has been fulfilled this morning.Both air
to vacuum leak check and waterlines helium
  
  61   Tuesday, November 22, 2011, 15:07 Bevan MossConditioning StationStandard OperationTM1UCx #3HV testing High Voltage (HV) testing was completed
on TM1 today. Vacuum was very good 1.9 x
10^-7 T in the service cap, 3.2 x 10^-7 in
 UCx_#3_HV_testing.JPG 
  62   Thursday, November 24, 2011, 10:39 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from conditioning
station to west target station. Move went
well.
  
  63   Thursday, November 24, 2011, 10:40 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from the conditioning
station to the west target station.
  