771
|
Tuesday, October 21, 2014, 08:55 |
chad fisher | South Hot-Cell | Repair | | | Manipulator repair | The east manipulator handle has been adjusted
and is ready for use. |
|
773
|
Wednesday, October 22, 2014, 09:41 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been disconnected at CS. | TM3 has been disconnected at CS. It is
vented and ready to move. |
|
774
|
Wednesday, October 22, 2014, 13:05 |
Anders Mjos | Conditioning Station | Maintenance | | | Controls upgrade on TCS | See work
permit for details |
|
781
|
Wednesday, November 05, 2014, 14:21 |
Anders Mjos | Conditioning Station | Development | | | Jumper installed on TGHT, TBHT and COIL | A copper bar jumper (ITD0488) was
installed on the TGHT, TBHT and COIL conductors
on the taregt hall side for TCS testing. |
|
784
|
Thursday, November 06, 2014, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | CS vacuum system has been connected to TM3. | CS vacuum system has been connected
to TM3 for control system test(Dave.Morris). |
|
786
|
Thursday, November 13, 2014, 14:01 |
David Wang | ITW | Repair | TM1 | | I replaced flow wheel and coil on ITW MSP water flow sensor. | I replaced flow wheel and coil on ITW MSP
water flow sensor which is located in ITW
pit. Before replacement, I checked the signal |
|
787
|
Thursday, November 13, 2014, 14:05 |
David Wang | ITE | Repair | TM4 | | Dan and I replaced flow wheel on ITE HVC2 water flow sensor. | Dan and I replaced flow wheel on ITE HVC2
water flow sensor. The old wheel did rotate
smoothly inside its SST case. The new wheel |
|
789
|
Monday, November 17, 2014, 13:45 |
chad fisher | South Hot-Cell | Repair | | | Jig for roof install of target | Jig for installation of target through
hot cell roof has been assembled and placed
in the target hall. |
|
795
|
Wednesday, November 19, 2014, 11:12 |
David Wang | Conditioning Station | Standard Operation | TM4 | | CS roughing pump is started. | CS roughing pump is started for TM4 and
UCX 11 target. |
|
800
|
Tuesday, November 25, 2014, 11:33 |
David Wang | South Hot-Cell | Development | | | Remove UCX 11 target transfer stand from SHC back to TH. | The stand was used for transferring UCX11
targte from TH to SHC. The stand wit target
was craned down from TH into SHC last week |
|
804
|
Monday, December 01, 2014, 12:05 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 Maintenance | F-308's have been serviced and are ready
to be filled with spent targets. F-308's
witch were serviced are #6,#13,#15,#16,and |
|
805
|
Monday, December 01, 2014, 14:06 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 REFURB. WATER LOOP TEST | Some issues with the turntable and having
to wait for a decision on whether to remove
TM2 from the hot cell so that TM4 with dead |
|
806
|
Monday, December 01, 2014, 14:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | F-308s moved | The F-308s have been moved into the target
hall, for filling on wednesday. |
|
807
|
Tuesday, December 02, 2014, 10:15 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Reburb. Loop Install | Final polish, clean with methanol and clean
compressed air.
Loop installed and torqued to 90 |
|
808
|
Tuesday, December 02, 2014, 13:33 |
David Wang | South Hot-Cell | Development | TM2 | | Leak check on TM2 tube heater +(D) at SHC | Chad and I leak checked TM2 tube heater+(D)
circuit at SHC with water bypass loop and
new seals installed on the water block. The |
|
811
|
Thursday, December 04, 2014, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target placed in F-308. | Spent targets in the mini storage were
placed into the F-308s yesterday, all F-308
have been removed from the the target hall |
|
812
|
Thursday, December 04, 2014, 16:37 |
David Wang | Conditioning Station | Development | TM2 | | connected TM2 and CS vacuum system . | I connected TM2 and CS vacuum system. All
vacuum pumps on TM2 and CS are started .The
pumping down is good so .far |
|
813
|
Friday, December 05, 2014, 07:47 |
David Wang | Conditioning Station | Development | TM2 | | TM2 at CS | The pumping down on TM2 at CS was good
overnight. However, the back up line pressure
is still too high for LD to get to 0.0-E-9atm.cc/sec |
|
814
|
Friday, December 05, 2014, 11:58 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D) water lines. | At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied |
6x |
815
|
Friday, December 05, 2014, 13:46 |
Anders Mjos | Conditioning Station | Development | TM2 | | Not able to start water system | TCS:WPV1 does not open when staging
is enabled. Multiple attempts have been made,
but the valve remains closed. |
|