ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
1268
|
Monday, June 27, 2016, 13:45 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been transferred from ITW to ITE. | ITE is configured to take proton beam. |
|
1271
|
Wednesday, July 06, 2016, 07:03 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was connected in ITW. | TM2 was disconnected in ITW and moved to
SHC. |
|
1272
|
Wednesday, July 06, 2016, 07:06 |
David Wang | Conditioning Station | Standard Operation | | | venting TCS with argon. | I switched off the vacuum pumps and vented
TCS with argon. The TCS will be ready to
accept TM2 this afternoon. |
|
1276
|
Wednesday, July 06, 2016, 14:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 turbo-pumps have been started. | The TCS and TM2 are pumping down. |
|
1278
|
Friday, July 08, 2016, 08:20 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS | I connected TM2 to TCS and started water
system. |
|
1282
|
Tuesday, July 12, 2016, 12:40 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected in ITW | All turbo-pumps are started. Everything
is good so far. |
|
1283
|
Tuesday, July 12, 2016, 12:42 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Sep) | Update schedule weekly.Attachment 1,2 |
|
1285
|
Thursday, July 14, 2016, 10:54 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) | Update TH schedule 130 according to mini-shut
down change.See attachment 1,2,3,4 |
|
1288
|
Monday, July 18, 2016, 14:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 leak checked at TCS | Last Friday July-15, TM3 was leak checked
at TCS. All air to vacuum seals on service
cap are good. Helium pressure test |
|
1290
|
Friday, July 22, 2016, 10:57 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 has been moved and connected at TCS | I started vacuum system.
I started TCS water system. The chiller
does not work properly still. But, It will |
|
1298
|
Tuesday, August 02, 2016, 15:22 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#17 | TM4 with new target has been connected at TCS | It is being pumped now at TCS. |
|
1301
|
Wednesday, August 03, 2016, 09:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#17 | Helium pressure test on TM4 HS line at TCS | Helium pressure test on TM4 HS line at
TCS is done.Leak detector 0.0X E-9atm.cc/sec.
5minutes, 70psi helium. |
|
1302
|
Wednesday, August 03, 2016, 09:49 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 is ready for conditioing at TCS. | I started TCS water system and installed
HV cover onto TM4. The TM4 containment
box is supplied with water also. TM4 is ready |
|
1303
|
Wednesday, August 03, 2016, 09:56 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) | Update schedule weekly. See attachments
1,2 |
|
1309
|
Tuesday, August 09, 2016, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx17 | TM4 has been disconnected at TCS | I stopped TCS water pumps this morning
. The argon venting for TCS is in processing. |
|
1313
|
Wednesday, August 10, 2016, 11:30 |
David Wang | ITE | Standard Operation | TM4 | UC#17 | TM4 has been connected at ITE | Dan and I connected TM4 in ITE yesterday.
It is pumping down at ITE now. Everything
is fine so far. |
|
1316
|
Thursday, August 11, 2016, 10:37 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 service tray cover plate ITA2108 has been removed. | Requested by Aurelia, and approved by Friedhelm,
TM3 service tray cover plate ITA2108 has
been remove out of the module. The plated |
|
1319
|
Monday, August 15, 2016, 10:08 |
David Wang | ITE | Standard Operation | TM4 | UC#17 | 5 Shielding blocks have been transferred from ITW to ITE. | Dan and I transferred 5 shielding blocks
from ITW to ITE. The ITE is configured to
take proton beam. |
|
1320
|
Monday, August 15, 2016, 10:15 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) | Weekly update target hall schedule. Everything
on schedule are finished on time.
See attachment. |
|
1322
|
Tuesday, August 16, 2016, 12:35 |
David Wang | Conditioning Station | Repair | TM3 | | CS vacuum pumps have been stopped | The TCS is venting now. The TM3 blue insulator
replacement job will be started soon. |
|