698
|
Wednesday, July 02, 2014, 14:29 |
David Wang | ITE | Standard Operation | | | Reconnected TM3 in ITE. | I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical |
|
|
700
|
Tuesday, July 08, 2014, 09:57 |
David Wang | ITE | Standard Operation | TM3 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
|
702
|
Wednesday, July 16, 2014, 11:28 |
David Wang | ITW | Standard Operation | TM1 | | TM1 had been dsiconnected in ITW. | The TM1 and ITW were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning. |
|
|
708
|
Thursday, July 17, 2014, 10:13 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure: |
|
|
709
|
Thursday, July 17, 2014, 11:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | I connected TM1 at CS. All turbo pumps
have been started. The pumping down is
good so far. |
|
|
710
|
Monday, July 21, 2014, 13:11 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | The TM1 HS line is pressure tested
this morning with 70 psi helium at
CS. No response has been found on leak detector. |
|
|
711
|
Tuesday, July 22, 2014, 07:32 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Stop TM1 and CS turbo pumps and ruff pump. | Stop TM1 and CS turbo pumps and ruff pump.
TM1 is disconnect at CS. It will be vented
tomorrow morning and moved to ITW. |
|
|
712
|
Wednesday, July 23, 2014, 13:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 in ITW. | TM1 has been connected in ITW .
The new roughing pump replaced on last Friday
works good. I started all turbo pumps in |
|
|
716
|
Monday, July 28, 2014, 14:37 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D)and -(C)water lines. |
TM2 installed in Conditioning
Station
Varian Leak detector
connected directly to Target Module 2 |
7x |
|
717
|
Monday, July 28, 2014, 14:45 |
David Wang | Conditioning Station | Development | TM2 | | turned off TM2 and CS turbo pumps. | I turned off TM2 and CS turbo-pumps. TM2
will be moved from CS to silo tomorrow morning. |
|
|
718
|
Monday, July 28, 2014, 17:26 |
Ron Kuramoto | ITW | Repair | | | ITW:IV5 Air leak repair | Air leak
was found at the Solenoid control valve located
in the Pre-Separator & DB0 room. The |
  |
|
719
|
Wednesday, July 30, 2014, 11:51 |
Travis Cave | Conditioning Station | Maintenance | | | entrance module move | ITE Entrance module has been moved from
the east station to the conditioning station. |
|
|
721
|
Tuesday, August 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | | | module move | ITE Entrance module has been moved back
to the east station. |
|
|
722
|
Tuesday, August 05, 2014, 11:53 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | ITE entrance module is reconnected in ITE. |
|
|
731
|
Monday, August 11, 2014, 14:27 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 are vented with argon and disconnected at CS. | TM4 are vented with argon and disconnected
at CS this morning. |
|
|
734
|
Wednesday, August 20, 2014, 10:25 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. ITE is configured
to take proton beam. |
|
|
735
|
Wednesday, September 03, 2014, 10:50 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been disconnected in ITW. | TM1 has been disconnected in ITW. |
|
|
739
|
Thursday, September 04, 2014, 09:47 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked the TM1 HS
line with new target installed. Base leak
rate 0.0xe-9 atm.cc/sec. No any response |
|
|
740
|
Thursday, September 04, 2014, 11:19 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 is connected in CS. | TM1 is connected in CS. All turbo pumps
are started. |
|
|
741
|
Friday, September 05, 2014, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | Helium pressure test on TM1 HS water line
at CS is done. 80psi helium with LD 0.0xE-9
atm.cc/sec. 3 minutes test and no response |
|