Entry  Thursday, June 02, 2016, 11:59, David Wang, South Hot-Cell, Repair, TM3, , 5K mega test on TM3 5K_mega_check_on_TM3.pdf

I did a 5KV mega test on TM3.  Only5Mohm @5kV between coli line PQ and chassis(ground). It confirmed the close gap between P,Q and GE. Other lines are ok. See attachment.

Entry  Tuesday, June 07, 2016, 11:36, David Wang, ITE, Standard Operation, TM4, Ta#47, TM4 has been disconnected in ITE. 

Dan and I disconnected TM4 in ITE. HS water lines has been purged.

Entry  Tuesday, June 07, 2016, 11:37, David Wang, ITE, Standard Operation, TM4, Ta#47, TM4 has been moved from ITE to SHC 

Bill and Yasmine did the move. Everything is good.

Entry  Tuesday, June 07, 2016, 11:42, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#47, electrical check on TM4 with old Ta target at SHC. electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdfelectrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf

I did an electrical check on TM4 with the old target still installed. The number is a little bit low on 500V mega check between chassis and 60KVbias which is 146Mohm. Others are good.    See attachment

I wrote all OL to 0  in attachment 1 ohmmeter check. Please See attachment 2 for correction.

Entry  Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf

Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z" repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment

 Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2

Entry  Tuesday, June 07, 2016, 17:14, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 target has been moved from SHC to TCS. 

Bill and Yasmine did the move remotely this afternoon. The move is successful.

Entry  Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started. 

TM4 and TCS vacuum system are connected.   Turbo pumps are started.  Everything is fine so far.

Entry  Thursday, June 09, 2016, 08:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 helium pressure test at TCS TM4_withUCx16_helium_pressure_test_at_TCS.pdf

I did a helium pressure test on TM4 at TCS with UCX16 target installed on the module. No leak has been found on all using water lines in TM4. See attachment for detail.

Entry  Thursday, June 09, 2016, 09:44, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been connected at TCS 

It is ready for HV conditioning/ heating. 

Entry  Thursday, June 09, 2016, 10:04, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf

Weekly update .

Entry  Tuesday, June 14, 2016, 08:04, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been disconnected at TCS 

The TM4 and TCS are vented with argon. 

Entry  Tuesday, June 14, 2016, 11:20, David Wang, ITE, Standard Operation, TM4, , TM4 has been connected in ITE 

TM4 and ITE are under roughing now.

Entry  Monday, June 27, 2016, 13:45, David Wang, ITE, Standard Operation, , , 5 Shielding blocks have been transferred from ITW to ITE. 

ITE is configured to take proton beam.

Entry  Wednesday, July 06, 2016, 07:03, David Wang, ITW, Standard Operation, TM2, , TM2 was connected in ITW. 

TM2 was disconnected in ITW and moved to SHC.

Entry  Wednesday, July 06, 2016, 07:06, David Wang, Conditioning Station, Standard Operation, , , venting TCS with argon. 

I switched off the vacuum pumps and vented TCS with argon. The TCS will be ready to accept TM2 this afternoon.

Entry  Wednesday, July 06, 2016, 14:25, David Wang, Conditioning Station, Standard Operation, TM2, , TCS and TM2 turbo-pumps have been started. 

The TCS and TM2 are pumping down.

Entry  Friday, July 08, 2016, 08:20, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been connected at TCS 

I connected TM2 to TCS and started water system.

Entry  Tuesday, July 12, 2016, 12:40, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected in ITW 

All turbo-pumps are started. Everything is good so far.

Entry  Tuesday, July 12, 2016, 12:42, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp

Update schedule weekly.Attachment 1,2

Entry  Thursday, July 14, 2016, 10:54, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep_2016.pdfTarget_Hall_shedule_129_Sep_to_Dec.xlsx

Update TH schedule 130 according to mini-shut down change.See attachment 1,2,3,4