719
|
Wednesday, July 30, 2014, 11:51 |
Travis Cave | Conditioning Station | Maintenance | | | entrance module move | ITE Entrance module has been moved from
the east station to the conditioning station. |
|
|
721
|
Tuesday, August 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | | | module move | ITE Entrance module has been moved back
to the east station. |
|
|
722
|
Tuesday, August 05, 2014, 11:53 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | ITE entrance module is reconnected in ITE. |
|
|
731
|
Monday, August 11, 2014, 14:27 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 are vented with argon and disconnected at CS. | TM4 are vented with argon and disconnected
at CS this morning. |
|
|
734
|
Wednesday, August 20, 2014, 10:25 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. ITE is configured
to take proton beam. |
|
|
735
|
Wednesday, September 03, 2014, 10:50 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been disconnected in ITW. | TM1 has been disconnected in ITW. |
|
|
739
|
Thursday, September 04, 2014, 09:47 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked the TM1 HS
line with new target installed. Base leak
rate 0.0xe-9 atm.cc/sec. No any response |
|
|
740
|
Thursday, September 04, 2014, 11:19 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 is connected in CS. | TM1 is connected in CS. All turbo pumps
are started. |
|
|
741
|
Friday, September 05, 2014, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | Helium pressure test on TM1 HS water line
at CS is done. 80psi helium with LD 0.0xE-9
atm.cc/sec. 3 minutes test and no response |
|
|
744
|
Wednesday, September 10, 2014, 07:12 |
David Wang | ITW | Repair | TM1 | | Removed ITW HS and COIL flow rate monitors. | Removed ITW HS and COIL flow rate monitors
installed at the beginning of this year.
They were installed on these two circuits |
|
|
746
|
Wednesday, September 10, 2014, 11:47 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been connected in ITW. | TM1 has been connected in ITW. ITW
and TM1 turbo pumps have been started. Water
is supplied to TM1 only. Everything is good |
|
|
747
|
Friday, September 12, 2014, 14:21 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target field measurements | Five of the ten target we want to measure
the fields on were done today. We will finish
up on Monday, and the spent target storage |
|
|
748
|
Monday, September 15, 2014, 11:23 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target field measurements | Field measurements on the spent target
has finished see the attached PDF for details. |
|
|
759
|
Friday, October 10, 2014, 10:47 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been connected in CS | TM3 has been connected in CS. All water
supplies are bypassed theTM3 on the top of
the service cap. TM3 TP2 was difficult to |
|
|
762
|
Tuesday, October 14, 2014, 12:19 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW. | TM1 was disconnected in ITW this morning.
Heat shield circuit is purged. |
|
|
766
|
Thursday, October 16, 2014, 15:40 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller unit | NOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the |
|
|
767
|
Friday, October 17, 2014, 13:36 |
Anders Mjos | Conditioning Station | Maintenance | | | TCS:Chil staging not operational | NOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the |
|
|
768
|
Monday, October 20, 2014, 08:59 |
David Wang | Conditioning Station | Development | TM3 | | Started TCS water system. | I started TCS water system this morning
to check if the chillers work properly. |
|
|
769
|
Monday, October 20, 2014, 09:13 |
David Wang | Conditioning Station | Development | TM3 | | TM3 TP2 failed | TM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass |
|
|
770
|
Monday, October 20, 2014, 14:18 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair | The broken cable on the east manipulator
has been replaced.
The handle will need some adjustments |
|