2702
|
Thursday, October 10, 2024, 10:24 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Ta#67 PIE | Post Irradiation Examination
October 9, 2024 - Aaron Tam w/
Chad Fisher, Aurelia Laxdal, and Lucas Backes |
35x |
|
2725
|
Tuesday, December 03, 2024, 10:10 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | module disconnection | TM2 with spent target TA#68 was disconnected
in ITE and is being moved to SHC. All water
lines are purged for module storage. |
|
|
2726
|
Tuesday, December 03, 2024, 10:51 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - ITE to SHC | TM2 was moved from ITE to SHC with Ta#68
target. During the move, a railing was lightly
bumped by the corner of the module - no obvious |
|
|
2727
|
Tuesday, December 03, 2024, 12:28 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM3 move - TCS to ITE | TM3 was moved with UCx#47 from TCS to ITE.
The move was smooth. |
|
|
2728
|
Tuesday, December 03, 2024, 15:53 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 Removal | Note: Ta#68 had a difficult
install. See E-log ID# 2698 for more info
First look: |
22x |
|
2730
|
Wednesday, December 04, 2024, 09:00 |
David Wang | Facilities | Standard Operation | TM2 | | all water lines on TM2 have been purged. | all water lines on TM2 have been purged.
Refilled them(except HS ) with 60psi nitrogen
for module silo storage before next year |
|
|
2731
|
Wednesday, December 04, 2024, 10:40 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - SHC to silo | TM2 was remotely moved from the South Hot
Cell to SW Silo. Reading at SHC = 89.8 mSv/h.
The move was smooth. |
|
|
2766
|
Monday, February 10, 2025, 11:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | No target | TM2 has been moved from W_S silo to SHC. | Remotely removed TM2 from S-W silo to SHC
. Peter and I did the move. It is successful.
|
|
|
2767
|
Tuesday, February 11, 2025, 10:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | Conductor Block Insulator Replacement | Ceramic conductor blocks ITD0053 and ITD0054
were replaced on TM2. Initially, only ITD0053
was to be replaced but after removing it |
  |
|
2769
|
Friday, February 14, 2025, 10:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | No target | TM2 has been moved from SHC to TCS. | TM2 has been moved from SHC to TCS successfully.
Travis and I did the move. |
|
|
2770
|
Friday, February 14, 2025, 11:35 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 TP1/TP2 and TCS TP1S have been started at TCS. | TM2 TP1/TP2 and TCS:TP1S have been started
at TCS. The starting time and operation of
turbo pumps are ok. TM2 had been stored in |
|
|
2774
|
Thursday, February 20, 2025, 11:10 |
David Wang | Conditioning Station | Standard Operation | TM2 | No target | TM2 has been moved from TCS to west-south silo. | TM2 has been moved from TCS to west-south
silo. Travis and I did the job. The move
is successful. |
|
|
2801
|
Tuesday, May 06, 2025, 14:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UC#49 | electrical check/leak check | TM2 with new target UC#49 installed
is E/L checked on the flange of NHC in TH.
see attachment for detail. |
|
|
2802
|
Wednesday, May 07, 2025, 13:41 |
Aaron Tam | North Hot-Cell | Standard Operation | TM2 | UC#49 | UC#49 SIS w/ Gasline Install | May 7th, 2025 - Aaron Schmidt, Aaron Tam
UC#49 Handover - good |
   |
|
2807
|
Friday, May 16, 2025, 10:36 |
Frank Song | ITW | Standard Operation | TM2 | UC#49 | Module Connection | TM2 with UC#49 Febiad is connected
in ITW. Form attached. |
|
|
4
|
Thursday, June 30, 2011, 16:04 |
Pierre Bricault | Conditioning Station | Repair | TM1 | | TM1 status | Friday June 24 2011
The target module has been moved
to the Conditioning Station (CS) |
|
|
11
|
Thursday, July 21, 2011, 17:39 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs | Over the
period of July 20-21st TM1 had several repairs
completed and tested. The easiest of the |
   |
|
12
|
Friday, July 22, 2011, 10:30 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs |
|
|
|
14
|
Wednesday, July 27, 2011, 14:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | | Module move | TM#1 has been moved from the Conditioning
Station to the South Hot Cell for the installation
of Ta#37. |
|
|
15
|
Thursday, July 28, 2011, 12:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#37 | Electrical check | TM#1 has passed the the electrical check. |
|