1249
|
Thursday, June 02, 2016, 11:59 |
David Wang | South Hot-Cell | Repair | TM3 | | 5K mega test on TM3 | I did a 5KV mega test on TM3. Only5Mohm
@5kV between coli line PQ and chassis(ground).
It confirmed the close gap between P,Q and |
|
1253
|
Tuesday, June 07, 2016, 11:36 |
David Wang | ITE | Standard Operation | TM4 | Ta#47 | TM4 has been disconnected in ITE. | Dan and I disconnected TM4 in ITE. HS water
lines has been purged. |
|
1254
|
Tuesday, June 07, 2016, 11:37 |
David Wang | ITE | Standard Operation | TM4 | Ta#47 | TM4 has been moved from ITE to SHC | Bill and Yasmine did the move. Everything
is good. |
|
1255
|
Tuesday, June 07, 2016, 11:42 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#47 | electrical check on TM4 with old Ta target at SHC. | I did an electrical check on TM4 with the
old target still installed. The number is
a little bit low on 500V mega check between |
 |
1256
|
Tuesday, June 07, 2016, 17:11 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 UCx16 electrical check and leak check at SHC | Chad and I finished the TM4 UCx6 electrical
check and leak check at SHC. Leak check result
on HS line is good. There is a dead short |
 |
1257
|
Tuesday, June 07, 2016, 17:14 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 with UCx16 target has been moved from SHC to TCS. | Bill and Yasmine did the move remotely
this afternoon. The move is successful. |
|
1258
|
Tuesday, June 07, 2016, 18:17 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 and TCS turbo pumps are started. | TM4 and TCS vacuum system are connected.
Turbo pumps are started. Everything
is fine so far. |
|
1260
|
Thursday, June 09, 2016, 08:37 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 with UCx16 helium pressure test at TCS | I did a helium pressure test on TM4 at
TCS with UCX16 target installed on the module.
No leak has been found on all using water |
|
1261
|
Thursday, June 09, 2016, 09:44 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 has been connected at TCS | It is ready for HV conditioning/ heating. |
|
1262
|
Thursday, June 09, 2016, 10:04 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Sep) | Weekly update . |
 |
1263
|
Tuesday, June 14, 2016, 08:04 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#16 | TM4 has been disconnected at TCS | The TM4 and TCS are vented with argon. |
|
1265
|
Tuesday, June 14, 2016, 11:20 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE | TM4 and ITE are under roughing now. |
|
1268
|
Monday, June 27, 2016, 13:45 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been transferred from ITW to ITE. | ITE is configured to take proton beam. |
|
1271
|
Wednesday, July 06, 2016, 07:03 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was connected in ITW. | TM2 was disconnected in ITW and moved to
SHC. |
|
1272
|
Wednesday, July 06, 2016, 07:06 |
David Wang | Conditioning Station | Standard Operation | | | venting TCS with argon. | I switched off the vacuum pumps and vented
TCS with argon. The TCS will be ready to
accept TM2 this afternoon. |
|
1276
|
Wednesday, July 06, 2016, 14:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS and TM2 turbo-pumps have been started. | The TCS and TM2 are pumping down. |
|
1278
|
Friday, July 08, 2016, 08:20 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS | I connected TM2 to TCS and started water
system. |
|
1282
|
Tuesday, July 12, 2016, 12:40 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected in ITW | All turbo-pumps are started. Everything
is good so far. |
|
1283
|
Tuesday, July 12, 2016, 12:42 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Sep) | Update schedule weekly.Attachment 1,2 |
 |
1285
|
Thursday, July 14, 2016, 10:54 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) | Update TH schedule 130 according to mini-shut
down change.See attachment 1,2,3,4 |
   |