Entry  Wednesday, July 02, 2014, 14:29, David Wang, ITE, Standard Operation, , , Reconnected TM3 in ITE. 
I reconnected TM3 in ITE. All turbo pumps have been started. The water supply to TM3 only in ITE. The HV keys are back to electrical room.
Entry  Tuesday, July 08, 2014, 09:57, David Wang, ITE, Standard Operation, TM3, , 5 Shielding blocks have been transferred from ITW to ITE. 
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam.
Entry  Wednesday, July 16, 2014, 11:28, David Wang, ITW, Standard Operation, TM1, , TM1 had been dsiconnected in ITW. 
The TM1 and ITW  were vented with argon gas last night. TM1 had been disconnected in ITW this morning.
Entry  Thursday, July 17, 2014, 10:13, David Wang, Conditioning Station, Standard Operation, TM1, , Leak check on TM1 HS water line with new target installed 
Chad and I leak checked TM1 HS waterline with new target installed at SHC. The LD base LR:0.0xE-9atm.cc/sec, base pressure: 0.0xE-4 torr. Chad sprayed
helium on both VCR fittings and flushed helium around the target. No response has been found on leak detector. The target HS line is leak tight so far.
I will do helium pressure test on this line at CS on next Monday.
Entry  Thursday, July 17, 2014, 11:49, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started 
I connected TM1 at CS. All turbo pumps have been started. The pumping down is  good so far.
Entry  Monday, July 21, 2014, 13:11, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS. 
The TM1 HS line is  pressure tested this morning with 70 psi helium  at CS. No response has been found on leak detector.
Entry  Tuesday, July 22, 2014, 07:32, David Wang, Conditioning Station, Standard Operation, TM1, , Stop TM1 and CS turbo pumps and ruff pump. 
Stop TM1 and CS turbo pumps and ruff pump. TM1 is disconnect at CS. It will be vented tomorrow morning and moved to ITW.
Entry  Wednesday, July 23, 2014, 13:36, David Wang, ITW, Standard Operation, TM1, , TM1 in ITW. 
  TM1 has been connected in ITW . The new roughing pump replaced on last  Friday works good. I started all turbo pumps in ITW. The ITW TP1  controller
was broken during the starting time. Dimo and I changed a new  controller for ITW TP1 in electrical room. The pumping down is good so  far. ITW water supplies
to TM1 only.       
Entry  Monday, July 28, 2014, 14:37, David Wang, Conditioning Station, Development, TM2, , helium pressure test on TM2 tube heater +(D)and -(C)water lines. 7x

    TM2 installed in Conditioning Station
    Varian Leak detector connected directly to Target Module 2         Service cap.

   Vacuum draw in Target Station with both module turbo pumps
    Leak detector baseline normal (10^-4 Torr, 10^-9 Std cc/s He)
  
 Since no Source tray is installed, and tube heater supply         conductor is blanked off in target enclosure, it was necessary         to test both
Entry  Monday, July 28, 2014, 14:45, David Wang, Conditioning Station, Development, TM2, , turned off TM2 and CS turbo pumps. 
I turned off TM2 and CS turbo-pumps. TM2 will be moved from CS to silo tomorrow morning.
Entry  Monday, July 28, 2014, 17:26, Ron Kuramoto, ITW, Repair, , , ITW:IV5 Air leak repair DSCN0087.JPG20140728_142855_-_small.jpg20140728_143202_-_small.jpg
Air leak was found at the Solenoid control valve located in the Pre-Separator & DB0 room.  The gasket between
the solenoid body and its manifold block was broken, see attached photos. The gasket and solenoid body were replaced. Air was turned back on
to IV5 (B/L gate valve) with no apparent air leaks. The gate valve was actuated open & closed from the control room seeing both limits successfully.
Entry  Wednesday, July 30, 2014, 11:51, Travis Cave, Conditioning Station, Maintenance, , , entrance module move 
ITE Entrance module has been moved from the east station to the conditioning station.
Entry  Tuesday, August 05, 2014, 10:40, Travis Cave, ITE, Standard Operation, , , module move 
ITE Entrance module has been moved back to the east station.
Entry  Tuesday, August 05, 2014, 11:53, David Wang, ITE, Repair, , , Reconnected ITE entrance module 
ITE entrance module is reconnected in ITE.
Entry  Monday, August 11, 2014, 14:27, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 are vented with argon and disconnected at CS. 
TM4 are vented with argon and disconnected at CS this morning.
Entry  Wednesday, August 20, 2014, 10:25, David Wang, ITE, Standard Operation, TM4, , 5 Shielding blocks have been transferred from ITW to ITE. 
5 Shielding blocks have been transferred from ITW to ITE. ITE  is configured to take proton beam.
 
Entry  Wednesday, September 03, 2014, 10:50, David Wang, ITW, Standard Operation, TM1, , TM1 has been disconnected in ITW. 
  TM1 has been disconnected in ITW.
Entry  Thursday, September 04, 2014, 09:47, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 HS water line with new target installed 
Chad and I  leak checked the TM1 HS line with new target installed. Base leak rate 0.0xe-9 atm.cc/sec. No any response has been found on LD. The
line will be pressurized at CS with helium tomorrow.
Entry  Thursday, September 04, 2014, 11:19, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 is connected in CS. 
TM1 is connected in CS. All turbo pumps are started.
Entry  Friday, September 05, 2014, 07:15, David Wang, Conditioning Station, Standard Operation, TM1, , helium pressure test on TM1 HS water line at CS. 
Helium pressure test on TM1 HS water line at CS is done. 80psi helium with LD 0.0xE-9 atm.cc/sec. 3 minutes test and no response on LD. The line is leak
tight.