Entry  Thursday, October 10, 2024, 10:24, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Ta#67 PIE  35x
 Post Irradiation Examination
October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes 
PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting 
Entry  Tuesday, December 03, 2024, 10:10, Frank Song, ITE, Standard Operation, TM2, Ta#68, module disconnection TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf
TM2 with spent target TA#68 was disconnected  in ITE and is being moved to SHC. All water lines are purged for module storage.
Entry  Tuesday, December 03, 2024, 10:51, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 move - ITE to SHC 
TM2 was moved from ITE to SHC with Ta#68 target. During the move, a railing was lightly bumped by the corner of the module - no obvious damage or issues
have been observed. Otherwise, the move was smooth.
Entry  Tuesday, December 03, 2024, 12:28, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM3 move - TCS to ITE 
TM3 was moved with UCx#47 from TCS to ITE. The move was smooth. 
Entry  Tuesday, December 03, 2024, 15:53, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 Removal 22x
  Note: Ta#68 had a difficult install. See E-log ID# 2698 for more info 
First look:

    Containment box cover looks the same as previous (See:ID: 2697)
    Target shows large amount of soot-like deposits (See photos
Entry  Wednesday, December 04, 2024, 09:00, David Wang, Facilities, Standard Operation, TM2, , all water lines on TM2 have been purged. 
all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using.  
Entry  Wednesday, December 04, 2024, 10:40, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 move - SHC to silo 
TM2 was remotely moved from the South Hot Cell to SW Silo. Reading at SHC = 89.8 mSv/h. The move was smooth. 
Entry  Monday, February 10, 2025, 11:48, David Wang, South Hot-Cell, Standard Operation, TM2, No target, TM2 has been moved from W_S silo to SHC. 
Remotely removed TM2 from S-W silo to SHC . Peter and I did the move. It is successful. 
Entry  Tuesday, February 11, 2025, 10:36, chad fisher, South Hot-Cell, Repair, TM2, , Conductor Block Insulator Replacement Image_(12).jpegImage_(13).jpegImage_(14).jpeg
Ceramic conductor blocks ITD0053 and ITD0054 were replaced on TM2. Initially, only ITD0053 was to be replaced but after removing it it was noticed that
ITD0054 (the larger conductor block behind it) was also broken, fractured through the helicoil that retained ITD0053 (see attached picture).
Both the old 53 and 54 fell into multiple pieces upon removal (see attached photo).
Entry  Friday, February 14, 2025, 10:48, David Wang, South Hot-Cell, Standard Operation, TM2, No target, TM2 has been moved from SHC to TCS.  
TM2 has been moved from SHC to TCS successfully. Travis and I did the move. 
Entry  Friday, February 14, 2025, 11:35, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 TP1/TP2 and TCS TP1S have been started at TCS. 
TM2 TP1/TP2 and TCS:TP1S have been started at TCS. The starting time and operation of turbo pumps are ok. TM2 had been stored in silo since last Oct.
TP1/TP2 work fine over long weekend and TCS vacuum is good. I switched off TCS vacuum system. 
Entry  Thursday, February 20, 2025, 11:10, David Wang, Conditioning Station, Standard Operation, TM2, No target, TM2 has been moved from TCS to west-south silo. 
TM2 has been moved from TCS to west-south silo. Travis and I did the job. The move is successful. 
Entry  Tuesday, May 06, 2025, 14:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UC#49, electrical check/leak check TM2_with_UC#49_electric_check_on_NHC_2025-05-06.pdf
 TM2 with new target UC#49 installed is E/L checked on the flange of NHC in TH. see attachment for detail.
Entry  Wednesday, May 07, 2025, 13:41, Aaron Tam, North Hot-Cell, Standard Operation, TM2, UC#49 , UC#49 SIS w/ Gasline Install Cable_hopped_on_East_Manip.jpgunsuccessful_method_1.jpgunsuccessful_method_2.jpgGasline_Gasket_installed.jpg
May 7th, 2025 - Aaron Schmidt, Aaron Tam 
UC#49 Handover - good

    April 30th - Initial fit check was performed
Entry  Friday, May 16, 2025, 10:36, Frank Song, ITW, Standard Operation, TM2, UC#49 , Module Connection TM2_with_UC#49_connection_in_ITW_2025-05-15.pdf
 TM2 with UC#49 Febiad is connected in ITW. Form attached.
Entry  Thursday, June 30, 2011, 16:04, Pierre Bricault, Conditioning Station, Repair, TM1, , TM1 status 
Friday June 24 2011
The target module has been moved to the Conditioning Station (CS)
Pumping overnight
Entry  Thursday, July 21, 2011, 17:39, Bevan Moss, Conditioning Station, Repair, TM1, , TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs IMG_1681.JPGIMG_1662.JPGIMG_1686.JPGIMG_1695.JPG
Over the period of July 20-21st TM1 had several repairs completed and tested. The easiest of the repairs was the installation
of a gasket and a blank off. The next repair was to replace the 2 oring on the side panels that were removed for inspection and repair. The instrument
panel oring was replaced again and the previous one measured. Both were found to have the correct diameter of 0.131 inches for the seal groove. When attempting
    Reply  Friday, July 22, 2011, 10:30, Bevan Moss, Conditioning Station, Repair, TM1, , TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs 


    
        
            Bevan Moss wrote:
        
        
            
            Over the period of July 20-21st TM1 had several repairs completed and
Entry  Wednesday, July 27, 2011, 14:34, Travis Cave, South Hot-Cell, Standard Operation, TM1, , Module move 
TM#1 has been moved from the Conditioning Station to the South Hot Cell for the installation of Ta#37.
Entry  Thursday, July 28, 2011, 12:02, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#37, Electrical check Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf
TM#1 has passed the the electrical check.