Entry  Wednesday, March 30, 2016, 11:00, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Electrical Check TM1_elec_chk_notgt.PDF
The results of the TM#1 electrical check from the 29th of March 2016
Entry  Wednesday, March 30, 2016, 08:40, David Wang, Conditioning Station, Standard Operation, , , 2016 Winter Shut Down Target Hall Schedule 2016_winter_shut_down__target_hall_schedule.pdf2016_winter_shut_down__target_hall_schedule.mpp
update the schedule according to changes.See attachment1, 2.
Entry  Tuesday, March 29, 2016, 08:38, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 water lines helium pressure check at TCS TM1_PNG1_panel_o-ring_replacement_001.JPGTM1_PNG1_panel_o-ring_replacement_002.JPGTM1_PNG1_panel_o-ring_replacement_004.JPGTM1_PNG1_panel_o-ring_replacement_005.JPGTM1_PNG1_panel_o-ring_replacement_006.JPG
TM1 water lines helium pressure check at TCS is done. 70 psi helium was applied to water circuits. Leak detector base leak rate 0.0 x E-9 atm.cc/sec,
base pressure 0.0 x E-4 torr. The result shows as below:
 
Entry  Thursday, March 24, 2016, 13:55, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, module moved 
TM#2 has been moved from the south hot cell to the south west silo and TM#1 was moved from the north east silo to the conditioning station. All done
by 10AM.
Entry  Thursday, March 24, 2016, 13:15, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and TCS vacuum system has been connected  
TM1 and TCS vacuum system have been connected. All turbo-pumps are started. The pumping down is fine.
Entry  Wednesday, March 23, 2016, 11:32, David Wang, South Hot-Cell, Repair, TM2, , TM2 Helium spray leak check on GE and MSP lines at SHC 
  Chad and I did the helium spray leak check on TM2 GE and MSP  water lines at SHC this morning. We confirmed the GE leak on water  blocks. We can
not found the MSP leak by using the helium spray since  its leak rate in TCS is much smaller than GE leak.  The leak check  process are as below:
Entry  Wednesday, March 23, 2016, 11:00, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module moved 
TM#2 was moved into the south hot cell by 08:30.
Entry  Tuesday, March 22, 2016, 10:27, Travis Cave, Spent Target Vault, Standard Operation, , SiC#32, Spent Target move Vault_Storage_March_22_2016.pdf
SiC#32 has been moved from the south hot cell to the spent target storage. See attached PDF for details.
Entry  Monday, March 21, 2016, 15:27, David Wang, Conditioning Station, Repair, TM2, , TM2 has been disconnected at TCS 
TM2 vacuum system has been disconnected at TCS. Venting is in process now.
Entry  Monday, March 21, 2016, 11:30, David Wang, Conditioning Station, Repair, TM2, , TM2 and TCS vacuum pumps are stopped 
I stopped TM2 and TCS vacuum pumps. It will be vented and disconnected this afternoon for tomorrow  moving.   
Entry  Monday, March 21, 2016, 10:25, David Wang, Conditioning Station, Repair, TM2, , TM2 Helium pressure Test Result in TCS and ITW 
TM2 has been helium pressure tested in ITW and TCS. They are both tested with 70psi helium, each circuit for 3minutes. 
The leak detector base leak rate: 0.0X E-9 atm.cc/sec, base pressure 0.0 xE-4 torr  for both ITW and TCS. The test results are:
 
Entry  Friday, March 18, 2016, 13:13, Travis Cave, Conditioning Station, Standard Operation, TM2, SiC#32, Electrical Check TM2_SiC32_postbeam.PDFTM2_elec_chk_notgt_CS.PDF
Electrical checks of the TM#2 with the old SiC#32 and without the target. See attached PDFs.
Entry  Friday, March 18, 2016, 11:43, chad fisher, South Hot-Cell, Standard Operation, , , SiC#32 dissection 20160318_105519_1.jpg20160318_105311.jpg20160318_105248.jpg20160318_105428.jpg
SiC#32 has been open for inspection.
Entry  Friday, March 18, 2016, 09:42, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 vacuum sysytem has been connected at TCS 
TM2 vacuum system has been connected at TCS. Started roughing pump. Everything is good so far.
Entry  Friday, March 18, 2016, 09:34, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep_2016.xlsxTarget_Hall_shedule_130_Apr_to_Sep_2016.pdf
I would like to post the spreadsheet of target hall schedule for beam schedule 130(Apr to Sep) first. The MS project of TH schedule for  beam schedule
130 is under construction, and will be posted later.
Entry  Friday, March 18, 2016, 08:34, Travis Cave, Conditioning Station, Standard Operation, TM2, no target, module moved 
TM#2 with no target has been moved to the conditioning station from the south hot cell.
Entry  Thursday, March 17, 2016, 14:57, David Wang, South Hot-Cell, Repair, TM2, , TM2 first round leak check in SHC 
Chad and I finished the first round check on Tm2 water lines.  The lines and spots checked are: Target oven + and - (front side braze  joints) , Tube
heater+and -(front side braze joints and water blocks),  coil2 and coil 1(front side braze joints and area close to water  blocks),. No leak has been found
on all above of them.  The last, we  checked   the GE which has the biggest leak so far. The leak detector  base leak rate only can get
Entry  Wednesday, March 16, 2016, 14:23, chad fisher, South Hot-Cell, Standard Operation, TM2, SiC#32, SiC#32 removal Target Module Inspection 20160316_141127.jpg20160316_141146.jpg
SiC#32 has been removed from TM2. Quick inspection shows some troubling discoloration on the water cooled connection blocks of C and D as well as the
left target heater A.
As for the target, both legs are broken and is has the normal "charge up" marks on the 9 pin connector.
Entry  Wednesday, March 16, 2016, 09:20, Travis Cave, ITE, Standard Operation, TM2, SiC#32, module moved 
TM#2 with SiC#32 has been moved from the west station to the south hot cell.
Entry  Monday, March 14, 2016, 15:22, David Wang, Conditioning Station, Standard Operation, TM2, , 2016 Winter Shut Down Target Hall Schedule 2016_winter_shut_down__target_hall_schedule.pdf2016_winter_shut_down__target_hall_schedule.mpp
update schedule according to change. See attachment 1,2
 