Entry  Friday, October 23, 2015, 11:40, Travis Cave, Spent Target Vault, Standard Operation, , ZrC #7, Spent target moved Vault_Storage_October_23_2015.pdf
The spent ZrC#7 target has been moved from the south hot cell to the spent target vault. The target was placed in pail #129 and then placed in slot 3B
of the vault, it was 157mSv/hr upon removal from the south hot cell.
Entry  Friday, October 23, 2015, 11:30, chad fisher, South Hot-Cell, Standard Operation, , ZrC#7, ZrC#7 Spent Move and Febiad Coil 
ZrC#7 was transfered to a spent target disposal pail today and removed from the hot cell. The "hot" end of the TM4 coil end was also disposed
of in the same pail (#129)
Entry  Friday, October 23, 2015, 07:41, Dan McDonald, Spent Target Vault, Maintenance, , , F-308's 
Six F-308's where received from Nordion #6,#15,#13,#16 all contained contamination. Loose contamination was removed with some fixed contamination remaining
levels are low enough to allow the transport of spent targets. flasks where serviced as per Nordion Document IS/PP 0009 F308, IS/PP 0981 F308. Flasks are
now located in the north hot cell area.
Entry  Wednesday, October 21, 2015, 11:58, Anders Mjos, South Hot-Cell, Development, TM2, ZrC#7, Extraction Electrode inspection 
The failed extraction electrode was inspected in the hot cell this morning by Anders and Chad. The following electrical measurements were taken

    EE on target assembly as recieved from TM after online operation. 14 Ohm
    EE removed from target assembly and placed on
conductive flat surface. ~1 G-Ohm at 1kV
    EE installed back onto target assembly (fasteners not tightened).~ 0.8 G-Ohm at 1 kV

There
Entry  Wednesday, October 21, 2015, 09:49, chad fisher, South Hot-Cell, Repair, , , Manipulator handle repair 
Rebuild handle of manipulator serial 7986 (currently in the east position) and replaced broken snap ring 5555-18h on west side of the handle underneath
motion switch.
Entry  Tuesday, October 20, 2015, 13:52, chad fisher, South Hot-Cell, Maintenance, , , TM4 Febiad coil line disposal 20151020_133045.jpg20151020_134303.jpg
The febiad coil line removed from TM4 has been cut into pieces small enough to be disposed of in a 5 gal pal. The line was cut with a Ridgid Model 104
manual pipe cutter (using the manipulators of course).
This pieces constitute the bulk of the field in the hot cell and will be disposed of with the next spent target.
Entry  Tuesday, October 20, 2015, 12:49, Dan McDonald, ITW, Standard Operation, , SiC#32, Tm2 hook up In ITW 
Lower and disconnect TM2 from crane in ITW, proceed with hooking up TM2 as per checklist with Anders. Double check flow meters and coils, reset TP1 and
TP2
Entry  Tuesday, October 20, 2015, 10:18, Travis Cave, ITW, Standard Operation, TM2, SiC#32, Module moved 
TM#2 with SiC#32 has been moved from the south hot cell to the west target station.
Entry  Monday, October 19, 2015, 15:52, Anders Mjos, South Hot-Cell, Standard Operation, TM2, SiC#32, Electrical and leak check ITW-TM2-SiC#32-HP-FEBIAD_Electrical_Check_SHC_(pre).pdf
 An electrical check was completed by Travis C and Anders M. Note ~250 kOhm between Target and 60 kV common. Leak check was done by Dan M and Chad
F on HS and Window circuits. No leaks found
Entry  Monday, October 19, 2015, 11:53, chad fisher, South Hot-Cell, Standard Operation, TM2, SiC#32, SiC#32 installed on TM2 
SiC#32 has been installed on TM2. High current fasteners torqued to 130 in lbs.
Entry  Thursday, October 15, 2015, 14:17, chad fisher, South Hot-Cell, Repair, TM2, , Anode Connector Install and adjustment 20151015_085914.jpg
The TM2 containment box was removed this morning for installation of the 9 pin connector...connection.
The 9 pin connector copper tube connection was made and Anders advised on routing of the cable to the banana plug water block connection.
Short was diagnosed (short disappeared when water block was pushed slightly towards center of module) and thicker Ultem spacer installed and tested
Entry  Thursday, October 15, 2015, 08:07, David Wang, South Hot-Cell, Standard Operation, TM2, no target, TM2 no target electrical check at SHC. TM2_electrical_check_2015-10-16_no_target.pdf
I did a TM2 no target electrical check at SHC this morning. A to RU at 500v  is 250K which is low.   anode- x pin is dead short to 60kv
bias. RU is dead short to 60kv bias( as before).   see attachment
Entry  Wednesday, October 14, 2015, 14:49, David Wang, South Hot-Cell, Standard Operation, TM2, , Install new high current cables to TM2 TM2_Febiad_High_current_cables_047.JPGTM2_Febiad_High_current_cables_048.JPGTM2_Febiad_High_current_cables_049.JPG
I installed a set of new high current cables for TM2 Febiad run. The top of TM2  is configured to Febiad mode. See attachments
Entry  Wednesday, October 14, 2015, 14:03, chad fisher, South Hot-Cell, Standard Operation, TM2, ZrC#7, ZrC#7 removed 20151014_134022.jpg20151014_135127.jpg
ZrC#7 has been removed from TM2. Everything looks good.
Entry  Wednesday, October 14, 2015, 12:48, David Wang, South Hot-Cell, Standard Operation, TM2, ZrC#7, TM2 ZrC#7 after run electrical check at SHC. ZrC_#7_after_run_electrical_check.pdf
I did an electrical check on TM2 with ZrC #7 on it. The EE is short to 60KV bias. See attachment
Entry  Wednesday, October 14, 2015, 12:44, David Wang, ITW, Standard Operation, TM2, ZrC#7, TM2 has been moved from ITW to SHC 
Bill and I remotely removed TM2 from ITW to SHC. The move is smooth.
Entry  Wednesday, October 14, 2015, 12:42, David Wang, ITW, Standard Operation, TM2, ZrC#7, TM2 has been disconnected in ITW  
Dan and I disconnected TM2 in ITW this morning.
Entry  Tuesday, October 13, 2015, 10:53, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
Weekly update schedule. TM3 evaluation schedule in Nov is added.  
update the schedule after  the cancellation of TM2 from SHC to CS trip.see attachments 3,4
Entry  Thursday, October 08, 2015, 14:08, David Wang, South Hot-Cell, Standard Operation, TM3, Dummy target febiad., TM3 has been moved from SHC to NW silo 
Bill and I moved TM3 from SHC to NW silo with a dummy febiad target installed on it. The move is smooth.
Entry  Tuesday, October 06, 2015, 21:12, Aurelia Laxdal, South Hot-Cell, Repair, TM3, , TM3 service cap inspection in target hall Pic1.jpg
David Wang and I did the service cap inspection in target hall: see WP I2015-10-06-10.<br>
Signs of sparking were seen underneath 3 insulators: E ("Cavity"), A ("Oven+") and B ("Oven -") at the pair water
lines coming out of the  feed-through and going to the HV chase. Specifically one water line of E is very close to the feed-through insulator (2-3mm