Entry  Tuesday, May 24, 2016, 10:52, Travis Cave, Spent Target Vault, Standard Operation, , UC#15, Spent Target move Vault_Storage_May_24_2016.pdf
Entry  Tuesday, May 24, 2016, 10:42, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep_2016.xlsxTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf
Entry  Tuesday, May 24, 2016, 10:39, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, TM2 and TCS turbo-pumps have been switched off this morning. 
Entry  Friday, May 20, 2016, 10:38, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, Helium pressure test on TM2 with new Lp Ta target 
Entry  Friday, May 20, 2016, 08:13, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, I switched off TCS and TM2 water system 
Entry  Thursday, May 19, 2016, 10:35, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module moved 
Entry  Wednesday, May 18, 2016, 11:42, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#15, module moved 
Entry  Tuesday, May 17, 2016, 14:15, Travis Cave, ITW, Standard Operation, TM1, UC#15, module moved 
Entry  Tuesday, May 17, 2016, 11:47, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#15, module moved 
Entry  Monday, May 16, 2016, 13:26, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#48, Conditioning Ta#48 Ta#48.docx
Entry  Monday, May 16, 2016, 11:16, David Wang, ITW, Standard Operation, TM1, , ITW, TM1 turbo-pumps are swithched off 
Entry  Monday, May 16, 2016, 10:48, Anders Mjos, Conditioning Station, Maintenance, , , Topped up water in TCS:TK2 
Entry  Friday, May 13, 2016, 10:12, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 water lines, heaters, EE, and EL are connected at TCS. 
Entry  Friday, May 13, 2016, 10:08, David Wang, Conditioning Station, Standard Operation, TM2, , Helium pressure test on TM2 HS and window line at CS with new Lp Ta target 
Entry  Wednesday, May 11, 2016, 13:16, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 and TCS vacuum system has been connected. 
Entry  Wednesday, May 11, 2016, 13:15, David Wang, Conditioning Station, Maintenance, TM2, , TCS tank top flange seal is changed this morning 
Entry  Wednesday, May 11, 2016, 09:44, Travis Cave, Conditioning Station, Standard Operation, TM2, Ta#48, module moved 
Entry  Tuesday, May 10, 2016, 14:27, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#48, Electrical Check TM2_elec_chk_Ta48_SHC.PDF
Entry  Tuesday, May 10, 2016, 13:54, David Wang, South Hot-Cell, Standard Operation, TM2, , SHC, TM2 leak check on window line and HS line. 
Entry  Tuesday, May 10, 2016, 13:37, chad fisher, South Hot-Cell, Standard Operation, TM2, Ta#48, Ta#48 Installation 