  1886   Thursday, March 07, 2019, 12:20 chad fisherSouth Hot-CellRepairTM2 Pre-polishing picturesPictures of the water blocks before polishing
can be found on docushare, collection 24400
  
  1887   Thursday, March 07, 2019, 13:59 chad fisherSouth Hot-CellRepairTM2 PolishingPolishing of the water block sealing surfaces
has commenced. First attempt was on block
B with low nap brown polishing pad (the least
  
  1888   Friday, March 08, 2019, 14:10 chad fisherSouth Hot-CellRepairTM2 Water block polishingAfter trials with 2000 grid wet paper I
have moved up to "red" scotch brite.
This seems to have worked the best so far
 B_after_SB_(2).jpg 
  1889   Monday, March 11, 2019, 14:34 chad fisherSouth Hot-CellRepairTM2 Water Block Polishing statusStage 1 polishing (water scale and at least
99% of visual indium removed) has been achieved
on all 2 seal water blocks that will be used
  
  1890   Tuesday, March 12, 2019, 09:13 chad fisherSouth Hot-CellRepairTM2 Water Block Polishing statusStage 1 polish has been achieved on all
single seal water blocks using the single
pad tool run at 75 psi, 2 3 minute cycles
 Blocks_Stage_1_Polish.jpg 
  1891   Thursday, March 14, 2019, 10:25 chad fisherSouth Hot-CellRepairTM2 Water Block Polishing statusPhase 2 (intermediate) and Phase 3 (Final)
polishing is complete on all water blocks
on TM2 (minus ground electrode circuit which
 Blocks_final_polished.jpg 
  1892   Friday, March 15, 2019, 08:51 Travis CaveConditioning StationStandard OperationTM2no targetModule move TM#2 has been moved from the south
hot cell to the conditioning station.
  
  1893   Monday, March 18, 2019, 07:23 David WangConditioning StationRepairTM2 TM2 window line helium testNew seals with a blank off cap are installed
on TM2 window line water block.  
The seals are checked at TCS with 70 psi
  
  1895   Wednesday, March 20, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the conditioning
station to the south hot cell.
  
  1896   Thursday, March 21, 2019, 09:56 chad fisherSouth Hot-CellRepairTM2 Tray insertionThis morning new water block fasteners
and gas line capture nut fasteners were inserted
into the hot cell. Window waterline blank
 20190321_091833.jpg20190321_094625.jpg 
  1897   Monday, March 25, 2019, 10:11 Aaron SchmidtSouth Hot-CellRepairTM2 LP-FEBIAD Test Target (empty) Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039
 TM2_-_FEBIAD_target_-_Electrical_Test.pdf 
  1898   Tuesday, March 26, 2019, 09:32 Travis CaveConditioning StationStandard OperationTM2Dummy TargetModule move TM#2 with a new source tray and the
dummy target has been moved from the south
hot cell to the conditioning station.
  
  1899   Tuesday, March 26, 2019, 11:10 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical Check Electrical Check of TM#2 with the
dummy target attached.
 Electrical_Check_TM2_Dummy__Target_CS_Mar-26-2019.pdf 
  1900   Tuesday, March 26, 2019, 11:17 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Checks of TM#2 during the source tray change. The four electrical check done on
TM#2 during the source tray change.
 Elecrictal_Check_TM#2_Old_source_Tray_Jan_11_2019.pdfElectrical_Check_TM#2_No_Source_Tray_Feb_25_2019.pdfElectrical_Check_TM#_New_source_Tray_Mar_22_2019.pdfElectrical_Check_TM#2_new_source_tray_Mar_25_2019.pdf 
  1901   Thursday, March 28, 2019, 10:27 David WangConditioning StationRepairTM2dummy febiad test targetTM2 new source tray helium pressure test at TCS.Helium pressure test on TM2 all water circuits
is done. 70 psi helium , 10 minutes test
time. Leak detector :base leak rate 0.0XE-9
  
  1902   Thursday, March 28, 2019, 12:48 Anders MjosConditioning StationRepairTM2dummy febiad test targetTM2 new source tray helium pressure test at TCS.


   
        
            
  
  1922   Thursday, May 16, 2019, 12:31 chad fisherSouth Hot-CellStandard OperationTM2Ta#58Ta #58 installedTa #58 has been installed onto TM2. All
new silver plated high current fasteners.
All torqued to 130 in lbs.
  
  1923   Thursday, May 16, 2019, 14:35 Travis CaveSouth Hot-CellStandard OperationTM2Ta#58Electrical Check Results of the electrical check of
TM#2 without target and with the new Ta#58
target.
 Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdfElectrical_Chk_TM2_no_target_May_15_2019_SHC.pdf 
  1924   Friday, May 17, 2019, 10:47 Travis CaveITEStandard OperationTM2Ta#58Module move TM#2 with Ta#58 has been moved from
the south hot cell to the east target station.
  
  1932   Tuesday, June 04, 2019, 08:46 David WangITEStandard OperationTM2 ITE water signal interlock check.ITE water signal interlock check is done.
Everything is good. Coil 2   circuit
no longer used in ITE . PQRU are looped as
  