|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
|
1902
|
Thursday, March 28, 2019, 12:48 |
Anders Mjos | Conditioning Station | Repair | TM2 | dummy febiad test target | TM2 new source tray helium pressure test at TCS. |
David Wang wrote: |
Helium pressure test on TM2 all water circuits is done. 70 psi helium , 10 minutes test time. Leak detector :base leak rate 0.0XE-9 atm.cc/sec, base pressure 0.0Xe-4torr. No any response on LD during the test. All TM2 water circuit are leak free.
|
Thursday, March 28, 2019, 12:40: Found valve to expansion tank TCS:TK2 to be closed. Opened valve. This allow air to escape out of the system and the water system is running as expected again
Friday, March 29, 2019, 11:15: Changed EE to conditioning mode
Friday, March 29, 2019, 11:35: BIAS / EZL 20 / 10 kV
Friday, March 29, 2019, 13:47: BIAS / EZL: 25 / 12.5 kV
Friday, March 29, 2019, 16:09: BIAS / EZL: 30 / 15 kV
Friday, March 29, 2019, 17:23: No sparks for >60 min
Friday, March 29, 2019, 17:26: BIAS / EZL off
Monday, April 01, 2019, 08:13: BIAS / EZL: 30 / 15 kV
Monday, April 01, 2019, 08:33 BIAS / EZL: 35 / 17.5 kV
Monday, April 01, 2019, 09:00: Sparking at about 37.5 kV BIAS. Lowered below 20 kV to stop. Now sparking at around 20 kV
Monday, April 01, 2019, 10:00: BIAS/EZL 22 / 20 kV. Occasional sparking on BIAS as voltage is increased.
Monday, April 01, 2019, 10:05: Change of strategy. Will heat target to bake out the vacuum before continuing with HV conditioning.
Monday, April 01, 2019, 10:43:
BIAS / EZL / EE: 15 / 7.5 / 1.5 kV
COIL / ANODE: 10 A / 200 V
Ramping TGHT / TBHT at 1 A/min. Good/bad vacuum (IG2): 1E-6 / 2E-6 Torr
Monday, April 01, 2019, 19:16: TGHT / TBHT: 500 / 270 A. Vacuum increasing. IG1/2 1.2E-7 / 1.4E-6 Torr
Monday, April 08, 2019, 09:28: BIAS / EZL: 20 / 10 kV (some periods of multiple sparks)
Monday, April 08, 2019, 10:28: BIAS / EZL: 30 / 15 kV (some periods of multiple sparks)
Monday, April 08, 2019, 11:24: 3 sparks for the last 60 min
Monday, April 08, 2019, 14:43: BIAS / EZ: 40 / 20 kV (after two periods of sparking around 39 kV requiring voltage to be reduced below 30 kV to recover)
Monday, April 08, 2019, 15:57: Two sparks in 70 min
Tuesday, April 09, 2019, 12:40: BIAS / EZL 40 / 20 kV with >90 min without sparking
Tuesday, April 09, 2019, 16:00: BIAS / EZL 48 / 24 kV
Tuesday, April 09, 2019, 16:07: Sparking tripped TPs and IG1S, then power supplies.
Tuesday, April 16, 2019, 16:41: BIAS / EZL 50 / 25 kV for 1 hour without sparking.
Wednesday, April 17, 2019, 15:23 : Continued without problems to 50 kV earlier, but sparks tripped off vacuum just above 50kV. Continue later. |
|
1922
|
Thursday, May 16, 2019, 12:31 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Ta #58 installed | Ta #58 has been installed onto TM2. All new silver plated high current fasteners. All torqued to 130 in lbs. |
|
1923
|
Thursday, May 16, 2019, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Electrical Check | Results of the electrical check of TM#2 without target and with the new Ta#58 target. |
Attachment 1: Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdf
|
|
Attachment 2: Electrical_Chk_TM2_no_target_May_15_2019_SHC.pdf
|
|
|
1924
|
Friday, May 17, 2019, 10:47 |
Travis Cave | ITE | Standard Operation | TM2 | Ta#58 | Module move | TM#2 with Ta#58 has been moved from the south hot cell to the east target station. |
|
1932
|
Tuesday, June 04, 2019, 08:46 |
David Wang | ITE | Standard Operation | TM2 | | ITE water signal interlock check. | ITE water signal interlock check is done. Everything is good. Coil 2 circuit no longer used in ITE . PQRU are looped as one circuit fro coil 1 circuit on Module since now. |
|
1943
|
Friday, June 14, 2019, 08:15 |
David Wang | ITE | Standard Operation | TM2 | | 5 shielding blocks are moved to ITE. | ITE is configured to take proton beam. |
|
1959
|
Thursday, August 08, 2019, 09:33 |
Carla Babcock | ITE | Development | TM2 | Ta#58 | TM2 HV conditioning with protons, round 1 | Starting HV tests on TM2 with 50uA of protons.
Tuesday, August 06, 2019, 03:37 : Ramping up 500V every 2mins or so, couple of sparks, then consistent sparks at 34kV. No vacuum response on IG1 for any sparks, even though the current spikes from around 40uA to 1300uA. Brought it down to 28kV to stop sparking. See a response on the EZL frequently.
Tuesday, August 06, 2019, 05:24 : Going above 30kV proves very difficult, lots of up and down, frequent sparks, still no vacuum response. Still seeing an EZL response.
Tuesday, August 06, 2019, 05:58 : Up to 31.5kV on bias, 1046V on EE and 15kV on EZL.
Tuesday, August 06, 2019, 06:50 : Controls are being sticky - not responding well.
Tuesday, August 06, 2019, 07:25 : Sat at 32 kV > 20mins with 2 sparks
Tuesday, August 06, 2019, 08:03 : lots of sparking at 36kV, went back down to 35kV. Current draw is 50uA.
Tuesday, August 06, 2019, 08:10 : lots of sparking after 9 mins at 35kV, had to turn it down to 34kV
Tuesday, August 06, 2019, 08:11 : Still sparking at 34, down to 33
Tuesday, August 06, 2019, 08:31 : At 33kV, sparked twice in 20mins and was going for another when the protons went off.
With protons off, the bias current dropped quickly from 66uA to 40uA and raising the bias to 40kV was not difficult. Later bias up to 50kV. Still no conclusion on if the sparking was inside or outside of the vacuum. No vacuum response seems to indicate outside, however the influence of protons would indicate inside. To be investigated visually when TM2 comes to the HC. |
|
1960
|
Tuesday, August 13, 2019, 09:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | Ta 58 | TM2 Move | TM2 was moved from ITE to South Hot Cell. Tantalum 58 target. |
|
1961
|
Wednesday, August 14, 2019, 08:55 |
David Wang | ITE | Standard Operation | TM2 | | TM2 has been disconnected in ITE. | TM2 has been disconnected in ITE. The bias jumper between U and T was burned out during the last beam time. |
|
1962
|
Wednesday, August 14, 2019, 11:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 and no target. | Results of electrical checks post beam at the south hot cell. | Here are the results of the electrical done at the south hot cell post beam of with the Ta#58 target attached and with just the module no target attached. |
Attachment 1: TM2_elec_chk_Ta58_post_beam_shc.pdf
|
|
Attachment 2: TM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf
|
|
|
1963
|
Thursday, August 15, 2019, 09:36 |
Adam Newsome | ITE | Standard Operation | TM2 | ZrC #8 | TM2 Move | TM2 was moved from South Hot Cell to ITE. ZrC #8 target. |
|
1964
|
Thursday, August 15, 2019, 09:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Electrical Check | Electrical of TM#2 with ZrC#8 at the south hot cell. See attached for details. |
Attachment 1: TM2_elec_chk_with_ZrC8_at_SHC_Aug_17_2019.pdf
|
|
|
1968
|
Friday, August 16, 2019, 14:23 |
Carla Babcock | ITE | Repair | TM2 | ZrC#8 | TM2 electrical checks in ITE | Ramped voltage on TM2 up to 30kV with no problems. Bias current is at 29uA, same as original TM2 bias current (see archiver for ITE June 15th, before protons) and similar to 31uA right after protons went off on Aug. 6.
TGHT=0A
TBHT=0A
BIAS V=30kV
BIAS current = 29uA
EZL V= 15kV
EZL current= 51uA
EE V= 1kV
EE current= 0.952mA
IG1= 8.6e-7
protons=0
This seems ok despite poor electrical checks showing 300 MOhm resistance between HV and ground. These values indicate a resistance of 1 GOhm. Let's see what happens when protons are on.
For future (optimistic) reference when testing protons:
BIAS=35kV, 35uA
EZL-17.5kV, 60uA
BIAS=38kV, 37uA
EZL=18.5kV, 63uA |
|
1986
|
Tuesday, September 17, 2019, 07:37 |
Carla Babcock | ITE | Development | TM2 | ZrC#8 | end of run HV investigations | Ramping up HV to ~30kV, encountered problems and had to drop back to 28kV. No response on IG1 or anything else during sparks. Lots of charging-type behaviour on the bias current. Protons at 55uA
Tuesday, September 17, 2019, 02:02 : 15 mins with only 1 spark at 30kV so increased the bias
Tuesday, September 17, 2019, 02:31 : 32kV. Current unstable
Tuesday, September 17, 2019, 02:41 : Current continues extremely unstable but not much sparking....
Tuesday, September 17, 2019, 02:53 : Proton beam trip initially settled the bias current down, but then current began climbing pretty steeply with protons still off
Tuesday, September 17, 2019, 03:28 : Protons dropped to 40uA from 55uA, Bias current is much more stable and no sparks for 25mins
Tuesday, September 17, 2019, 03:36 : Raising voltage easy to about 33.5kV then instability and sparking similar to around 31kV at 55uA p+
Tuesday, September 17, 2019, 04:45 : Lowered protons to 25uA and no sparks though the current is not stable
More things but forgot to write them down. Spreadsheet attached. |
Attachment 1: HVtests_TM2_Sept172019.xlsx
|
|
1991
|
Monday, September 30, 2019, 11:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Module move | TM#2 with ZrC#8 has been moved from the east station to the south hot cell. |
|
1992
|
Monday, September 30, 2019, 14:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Electrical Check | Results of the electrical check on TM#2 with ZrC#8 post beam. |
Attachment 1: TM2_elec_chk_ZrC8_post_beam_SHC_09-30-2019.pdf
|
|
|
1993
|
Tuesday, October 01, 2019, 09:23 |
Don Jackson | ITE | Maintenance | TM2 | ZrC #8 | 60KV Common Connections | 1 Jumpers between 60KV common and FEBIAD lines were connected in an unusual way. This should of had no impact on the ZrC run but would have to be corrected for any future FEBIAD runs.
2 Feedthrough U was mislabeled (label has been removed)
|
Attachment 1: TM2_Wiring.jpg
|
|
|
1994
|
Tuesday, October 01, 2019, 10:22 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | ZrC#8 Removed Ta#59 installed | ZrC#8 has been removed from TM2. Upon removal of the high current tube heater bolts it was noticed that the tube was broken. Also the 9 pin connector has an arc mark (see pictures attached).
Ta#59 has been installed with new fasteners. High current fasteners torqued to 130 in lbs. |
Attachment 1: 20190930_140918[1].jpg
|
|
|
1995
|
Tuesday, October 01, 2019, 14:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check | The results of the electrical check on TM#2 with the Ta#59 target and without before the target was mounted on the module. |
Attachment 1: TM2_no_target_SHC_elec_chk_Oct-1-2019.pdf
|
|
Attachment 2: TM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf
|
|
|
1996
|
Tuesday, October 01, 2019, 16:30 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#58 | Conditioning of Ta#58 | Tuesday, October 01, 2019, 15:15: Started roughing.
Tuesday, October 01, 2019, 16:30: Started TPs
Tuesday, October 01, 2019, 16:34: All TPs at speed
Conditioning completed over the weekend by RIB operations. The shutter was left closed on the module, so no beam could be seen on the FC. Conditioning otherwise OK. |
|