  ID Date Author Categorydown Type Module Target/Number Subject
  2574   Tuesday, April 30, 2024, 09:20 David WangITWDevelopmentTM4 A new SST gas line is using for ITW febiad gas staion in pit.

A new SST gas line with swagelock tube fittings and VCR fit is using for ITW febiad gas staion in pit. Gas line is leak checked on bench. No leak . it is installed on TM4 in ITW now,

  2575   Wednesday, May 01, 2024, 09:50 David WangITWStandard OperationTM4 TM4 has been connected to ITW.

TM4 has been connected to ITW. see attachment.

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf
Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf
  2577   Thursday, May 02, 2024, 09:00 David WangITWStandard OperationTM4 Annual ITW water signal interlock check has been done.

Annual ITW water signal interlock check has been done. Renee helped me on it. Everything works fine.

  2581   Thursday, May 02, 2024, 18:48 Carla BabcockITWStandard Operation  ITW cage setup

ITW gas lines pumped down to 2e-3Torr on leak detector with leak rate in the low e-7 atm-cc/s. Gas bottles opened at 3psi and labels in epics changed to reflect correct setup. switch box set to cathode mode, checked that anode wire was at HV common.

note ballast is removed from ITW now to be used in ITE so that line is blanked off.

  2587   Wednesday, May 08, 2024, 14:01 Frank SongITWMaintenance  Annual clean up for ITW Faraday cage

The ITW Faraday Cage has been cleaned, this is part of Winter Shut Down job happens in ISAC-1 Electric maintenance room annually.

  2593   Tuesday, May 21, 2024, 09:50 David WangITWStandard OperationTM4Lp Febiad emptyTm4 has been disconnected in ITW.

Tm4 has been disconnected in ITW per document 141576. Checklist is done.  HS line is purged.

Attachment 1: TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf
TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf TM4_with_Lp-Febiad_empty_target_disconnection_in_ITW_2024-05-21.pdf
  2594   Tuesday, May 21, 2024, 11:46 David WangITWStandard OperationTM4LP febiad empty. Tm4 has been moved from ITW to SHC.

Tm4 has been moved from ITW to SHC. the move is smooth.

  2601   Tuesday, May 28, 2024, 10:13 David WangITWStandard OperationTM4UCx#45Tm4 has been moved from TCS to ITW.

Tm4 has been moved from TCS to ITW.  the move is smooth.

  2602   Tuesday, May 28, 2024, 13:49 Frank SongITWStandard OperationTM4UCx#45Module Connection

 TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with.

Attachment 1: TM4_with_UCx#45_connection_in_ITW_20240528.pdf
TM4_with_UCx#45_connection_in_ITW_20240528.pdf TM4_with_UCx#45_connection_in_ITW_20240528.pdf TM4_with_UCx#45_connection_in_ITW_20240528.pdf TM4_with_UCx#45_connection_in_ITW_20240528.pdf
  2607   Monday, June 10, 2024, 11:02 Frank SongITWStandard OperationTM4UCx#45shielding blocks transfer

 5 shielding blocks have been transferred from ITE to ITW. 

Doc # 181007

 

  2613   Friday, June 14, 2024, 16:04 Carla BabcockITWRepairTM4UC#45Replaced and reinstalled electronics in ITW cage

ITW has been behaving badly at higher voltages recently, even without protons on. I conditioned it up to 50kV with heaters off in the TCS and it was fine. But when I tried to do the same with heaters on in the station, it was quite sparky and it kept tripping the TGHT/TBHT. I went to 49kV where it was unstable, then lowered to 48kV where it looked fine for 30mins. But even operating at 40kV, it tripped the heaters several times. The TBHT voltage came back lower than before on the last trip, so I am getting worried about it.

I decided to make sure all the electronic spark protection was ok in the faraday cage. There is a resistor/gmov combination across the terminals of each TGHT/TBHT in which Tomislav replaced the gmovs for me because his tester did not work at those low voltages, so we couldnt see if they were broken. The electronics diagram called for 18V gmovs, the replacements are 22V because that's all we have.

We also tested and re-installed the capacitor-gdt-resistor combinations that John installed last year from TGHT/TBHT bubars to HV common. I originally removed them because we couldn't bias a FEBIAD with them on - this still has to be investigated. The measured values are 0.148uF, 90kOhms and a breakdown voltage on the gdt of 410-450V.

Hopefully this prevents sparking the power supplies off.

 

Sunday, June 16, 2024, 07:03 : power supplies have not tripped off since electronics repair. See data/TM4sparkingbehaviour_June152024.dat for sparking frequency over ~10hrs of protons (5-14uA). >14 sparks during this time (14 captured by PLC when voltage dropped, many more current peaks).

  2631   Thursday, July 04, 2024, 11:45 Frank SongITWStandard OperationTM4UCx#45module disconnection

TM4 with spent target UCx#45 was disconnected in ITW and moved to SHC.

 TM4 move from ITW to SHC is smooth.

Attachment 1: TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf
TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf
  2640   Tuesday, July 16, 2024, 11:15 David WangITWStandard OperationTM4TiC #7 febiad. TM4 has been moved from TCS to ITW.

TM4 has been moved from TCS to ITW.  the move is smooth.

  2641   Tuesday, July 16, 2024, 11:15 David WangITWStandard OperationTM4TiC #7 febiad. TM4 has been moved from TCS to ITW.

TM4 has been moved from TCS to ITW.  the move is smooth.

  2642   Tuesday, July 16, 2024, 13:14 Frank SongITWStandard OperationTM4TiC#7Module Connection

 TM4 with TiC#7 was connected in ITW, all TPs are running at full speed.

Attachment 1: TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf
TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf
Attachment 2: MicrosoftTeams-image_(65).png
MicrosoftTeams-image_(65).png
  2649   Friday, August 09, 2024, 08:11 Frank SongITWStandard OperationTM4TiC#7module disconnection

 TM4 with spent target TiC#7 (dead) was disconnected in ITW and ready to move to TCS.

Attachment 1: TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf
TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf
  2651   Friday, August 09, 2024, 18:18 David WangITWStandard OperationTM4TiC#7Tm4 has been moved from ITW to SMP.

Tm4 has been moved from ITW to SMP. the move is successful.

  2652   Friday, August 09, 2024, 18:20 David WangITWStandard OperationTM3TiC#8TM3 has been moved from SHC to ITW.

With TiC # 8 installed, TM3 has been moved from SHc to ITW. The move is smooth.

  2653   Friday, August 09, 2024, 19:01 David WangITWStandard OperationTM3TiC#8.TM3 has been connected in ITW.

TM3 has been connected in ITW. See attachment for checklist.

Attachment 1: TM3_TiC#8_connection_in_ITW_checklist.pdf
TM3_TiC#8_connection_in_ITW_checklist.pdf TM3_TiC#8_connection_in_ITW_checklist.pdf TM3_TiC#8_connection_in_ITW_checklist.pdf TM3_TiC#8_connection_in_ITW_checklist.pdf
  2671   Tuesday, August 27, 2024, 13:30 Frank SongITWMaintenanceTM3TiC#8module disconnection

 TM3 is disconnected and all water lines are purged/refilled with 50psi Nitrogen. Pls see pics attached with.

Attachment 1: TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf
TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf