ID Date Author Categorydown Type Module Target/Number Subject
  2288   Tuesday, January 11, 2022, 11:50 David WangITWMaintenance   ITW Exit module 1 side sqaure panel O-ing seal replacement.

Frank and I replaced ITW Exit module 1 side square service panel o-ring seal. Also, The target module pit top flange o-ring seal in ITW pit is replaced.  

  2303   Thursday, February 10, 2022, 12:24 David WangITWStandard Operation  ITW HV test without mdoule.

  Carla did the test. and reported the result as following: HV testing of ITW is complete. It was pretty well behaved up to 59.5kV, and sat at 59kV for 30mins with no sparks (that EPICS caught). There was some strange behaviour of the current between 51kV and 53kV - it was jumping by 20uA or more - but there didn't seem to be any voltage response, and it went away after 53kV (though it returned on the way back down). The test was done in Feb 02.

  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection

 TM2 was connected in ITW with a Febiad Test Target. 

Attachment 1: module_connection_checklist20220426.jpg
module_connection_checklist20220426.jpg
  2317   Thursday, April 28, 2022, 08:16 David WangITWStandard OperationTM2  Annual ITW water signal interlocks check .

Annual ITW water signal interlocks check was done with TM2 in ITW.   Water signal interlocks on all water circuits related to TM and 2A beam lines in ITW work fine. 

  2326   Wednesday, May 25, 2022, 13:43 Frank SongITWStandard OperationTM2Febiad-Testmodule disconnection

 TM2 with a test target was disconnected in ITW.

Attachment 1: tm2_disconnection.jpg
tm2_disconnection.jpg
  2334   Tuesday, June 21, 2022, 18:30 Frank SongITWStandard OperationTM2SiC#43 FebiadModule Connection

 TM2 with Febiad Target SiC #43 was connected in ITW. NOTE: the number of TARGET in attached picture should be #43. 

Attachment 1: TM2_with_sic_42_connected_in_ITW.jpg
TM2_with_sic_42_connected_in_ITW.jpg
  2346   Tuesday, July 19, 2022, 11:47 Frank SongITWStandard OperationTM2SiC#43 FebiadTM2 with SiC#43 disconnected in ITW

 the module was disconnected in pit and moved to NHC.

Attachment 1: TM2_with_SiC43_disconnection_in_ITW.jpg
TM2_with_SiC43_disconnection_in_ITW.jpg
  2350   Wednesday, July 27, 2022, 08:11 Frank SongITWStandard OperationTM2UCx#38Module Connection

 TM2 with Target UCx#38 was connected in ITW.

Attachment 1: TM2_with_UCx38_connection_at_ITW.jpg
TM2_with_UCx38_connection_at_ITW.jpg
  2361   Tuesday, September 06, 2022, 13:58 Frank SongITWStandard OperationTM2UCx#38module disconnection

 TM2 with Target UCx38 was disconnected in ITW and moved to NHC

Attachment 1: TM2_with_UCx38_disconnection_in_ITW.png
TM2_with_UCx38_disconnection_in_ITW.png
  2365   Tuesday, September 13, 2022, 14:10 Frank SongITWStandard OperationTM2UCx#39Module Connection

 TM2 with UCx#39 is connected in ITW.

Attachment 1: TM2_with_UCx#39_connection_in_ITW.png
TM2_with_UCx#39_connection_in_ITW.png
  2381   Tuesday, November 01, 2022, 12:37 Frank SongITWStandard OperationTM2UCx#39disconnection

 TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC.

Attachment 1: TM2_with_UCx39_disconnection_in_ITW.png
TM2_with_UCx39_disconnection_in_ITW.png
  2387   Tuesday, November 15, 2022, 13:33 Frank SongITWStandard OperationTM2UCx#40Module Connection

 TM2 with UCx#40 is connected in ITW.

Attachment 1: TM2_with_UCx#40_connection_in_ITW.png
TM2_with_UCx#40_connection_in_ITW.png
  2401   Friday, January 06, 2023, 10:38 David WangITWStandard OperationTM2 ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test.

ITW and TM2 primary and secondary vacuum vessel leak check is done. Leak detector is connected to ITW TP1. Base leak rate on leak detector is 0.0 x E-9 atm.cc/sec.   See attachment for the result.  No big issue. Two old leaks we found last year at location D and E disappeared in this check. We did Vacseal resin spray on them last year.  It looks like the Vacseal spray works .  From the result , I can see the o-ring between exit 1 module and T - flange is closing to the end of the life.  There are two small leaks on this o-ring now at A and B location. We plan to change this o-ring next winter shut down. We do vacseal spray on them this year. The big O-ring between tank vessel and T -flange looks still ok. Two small leaks are found on location F and G on this O-ring. Not much we can do on them. The leak on location C and B were sprayed with resin yesterday after leak check. They are leak free after spray on check. I will double check them. Leak on location A will be resin sprayed after TM2 is removed and ITW is under vacuum.   All TM2 internal water-cooling lines are helium pressurized (70 psi) for 5 minutes each. HS shows 2.5 X E-9atm.cc/sec leak rate. The rest lines are 0.0 X E-9 atm.cc/sec.

Attachment 1: ITW_vacuum_leak_check_2023.pdf
ITW_vacuum_leak_check_2023.pdf
  2402   Monday, January 09, 2023, 14:19 Frank SongITWStandard OperationTM2UCx#40TM2 with UCx40 disconnection in ITW

 TM2 with target UCx40 was disconnected in ITW and moved to NHC.

Attachment 1: TM2_with_UCx40_disconnection_in_ITW.png
TM2_with_UCx40_disconnection_in_ITW.png
  2406   Tuesday, January 24, 2023, 07:21 David WangITWMaintenance  ITW pit general clean up.

 ITW  was cleaned with vacuum canister in Jan 10th. HV  cage inside and blue nylon insulators were wiped.  Garbage inside the pits were cleaned out.

  2416   Monday, February 13, 2023, 09:57 David WangITWMaintenance  ITW/ITE primary vacuum back up lines and BVs leak check in target pit.

In past two weeks, ITW/ ITE primary vacuum back up lines and BVs in ITW/ITE pit have been leak checked.  ITW BV1 and BV2 on back up line side were leak. They are replaced with old leak free BVs.  ITE TP2 NW25 SST  flexible line right after pump were leak . It is replaced with new NW25 SST flexible line. Two leak were found on ITW side KF 50 O-rings connected to NW 50 SST flexible coupling. They were replaced with new KF50 o-rings. After job, both  stations primary back up lines in pit were leak checked .  They are good.

  2447   Monday, May 29, 2023, 12:52 Frank SongITWStandard OperationTM2TiC#6Module Connection

 TM2 with TiC#6 was connected in ITW (FEBIAD), turbo pumps were started successfully.

Attachment 1: TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf
TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf
  2449   Tuesday, May 30, 2023, 12:30 Frank SongITWStandard OperationTM2TiC#6gas lines pump out in ITW Faraday Cage

 Gas lines pumped down at electric room for TM2 at ITW is done, leak rate 0.0e -8 <1.0e -3 T P pressure

Attachment 1: gas_lines_pumped_out_to_ITW.JPG
gas_lines_pumped_out_to_ITW.JPG
  2450   Tuesday, May 30, 2023, 14:15 David WangITWStandard Operation  ITW water signal interlock check is done.

ITW water signal interlock check is done. All ITW water signals including HS, EE, Coil , Ta, Tu, MSP, C-window, HVC1, HVC2, 2A-dump, 2A -shielding plug, 2A-tank, 2A-window, and 2A-collimator are checked. All  water signal interlock work fine.

  2453   Tuesday, June 06, 2023, 17:36 Carla BabcockITWStandard OperationTM2TiC#6Module conditioning

Conditioned TM2 up to 48kV in ITW. Some sparks and current is not very stable. Drawing about 178uA at 48kV.