1878
|
Friday, March 01, 2019, 08:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | | Conditioning TM2 without source tray | BIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV |
|
1879
|
Friday, March 01, 2019, 09:57 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source tray removal | TM4 optics tray was installed onto the
old TM2 source tray yesterday and tray filled
with non-active metal scrap. Tray inserted |
|
1881
|
Tuesday, March 05, 2019, 07:20 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 HV test at TCS | Spark between HV cover vertical mesh plate
and HS 60KV bias connecting clamp 90degree
angle at 55 KV on TM2 top. HV cover is removed |
|
1884
|
Thursday, March 07, 2019, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 move from TCS to SHC. | TM2 has been moved from TCS to SHC. The
move is smooth. |
|
1885
|
Thursday, March 07, 2019, 12:02 |
chad fisher | South Hot-Cell | Repair | TM2 | | Box Off water block jig on | The containment box has been removed from
TM2 and the water block jig installed in
preparation for water block polishing. |
|
1886
|
Thursday, March 07, 2019, 12:20 |
chad fisher | South Hot-Cell | Repair | TM2 | | Pre-polishing pictures | Pictures of the water blocks before polishing
can be found on docushare, collection 24400 |
|
1887
|
Thursday, March 07, 2019, 13:59 |
chad fisher | South Hot-Cell | Repair | TM2 | | Polishing | Polishing of the water block sealing surfaces
has commenced. First attempt was on block
B with low nap brown polishing pad (the least |
|
1888
|
Friday, March 08, 2019, 14:10 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water block polishing | After trials with 2000 grid wet paper I
have moved up to "red" scotch brite.
This seems to have worked the best so far |
|
1889
|
Monday, March 11, 2019, 14:34 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water Block Polishing status | Stage 1 polishing (water scale and at least
99% of visual indium removed) has been achieved
on all 2 seal water blocks that will be used |
|
1890
|
Tuesday, March 12, 2019, 09:13 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water Block Polishing status | Stage 1 polish has been achieved on all
single seal water blocks using the single
pad tool run at 75 psi, 2 3 minute cycles |
|
1891
|
Thursday, March 14, 2019, 10:25 |
chad fisher | South Hot-Cell | Repair | TM2 | | Water Block Polishing status | Phase 2 (intermediate) and Phase 3 (Final)
polishing is complete on all water blocks
on TM2 (minus ground electrode circuit which |
|
1892
|
Friday, March 15, 2019, 08:51 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the south
hot cell to the conditioning station. |
|
1893
|
Monday, March 18, 2019, 07:23 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 window line helium test | New seals with a blank off cap are installed
on TM2 window line water block.
The seals are checked at TCS with 70 psi |
|
1895
|
Wednesday, March 20, 2019, 11:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
1896
|
Thursday, March 21, 2019, 09:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | Tray insertion | This morning new water block fasteners
and gas line capture nut fasteners were inserted
into the hot cell. Window waterline blank |
|
1897
|
Monday, March 25, 2019, 10:11 |
Aaron Schmidt | South Hot-Cell | Repair | TM2 | | LP-FEBIAD Test Target (empty) | Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039
|
|
1898
|
Tuesday, March 26, 2019, 09:32 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Module move | TM#2 with a new source tray and the
dummy target has been moved from the south
hot cell to the conditioning station. |
|
1899
|
Tuesday, March 26, 2019, 11:10 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Electrical Check | Electrical Check of TM#2 with the
dummy target attached. |
|
1900
|
Tuesday, March 26, 2019, 11:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Checks of TM#2 during the source tray change. | The four electrical check done on
TM#2 during the source tray change. |
|
1901
|
Thursday, March 28, 2019, 10:27 |
David Wang | Conditioning Station | Repair | TM2 | dummy febiad test target | TM2 new source tray helium pressure test at TCS. | Helium pressure test on TM2 all water circuits
is done. 70 psi helium , 10 minutes test
time. Leak detector :base leak rate 0.0XE-9 |
|