  214   Wednesday, November 14, 2012, 10:57 David WangITWStandard OperationTM1 TM1connected in ITWI connected TM1 in ITW yesterday. Everything
is good so far. Travis was with me when i
did the job.
  
  215   Wednesday, November 14, 2012, 11:04 David WangITERepairTM4 Change ITE dump water circiut flow wheelI changed ITE dump water circuit flow wheel
due to its poor performance. The new flow
wheel works fine. The signal on electrical
  
  216   Wednesday, November 14, 2012, 11:51 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Five spent targets have been moved from
the storage vault to the mini storage vault.
The five targets are as follows: SiC #25,
 Vault_Storage_November_14_2012.pdfMini_Vault_Storage_November_14_2012.pdf 
  217   Wednesday, November 21, 2012, 09:36 Travis CaveSpent Target VaultStandard Operation  Spent target moveOn Nov 20th the 5 targets in mini storage
have been moved to the F-308s, those F-308s
have since been moved to the hot cell ante
  
  225   Wednesday, January 02, 2013, 12:11 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITW to block storage areaI moved 5 shielding blocks from ITW 
to block storage area for preparing the TM1
disconnection. Air sampled and swiped blocks
  
  226   Thursday, January 03, 2013, 10:05 David WangITWStandard OperationTM1 Disconnected TM1 in ITW.TM1 has been disconnected in ITW. All 
water lines had been purged. Travis was with
me during the job.
  
  229   Thursday, January 10, 2013, 10:40 David WangITWMaintenance  Replaced all high active water system magnetic pedal wheels in ITW and ITE.I replaced all high active water system
magnetic pedal wheels in ITW and ITE. This
is a preventive maintenance job we planned
  
  233   Thursday, January 17, 2013, 10:06 chad fisherSouth Hot-CellStandard Operation  SiC Test Target for TM4/CSI have inserted the test target for TM4
and the CS into the hot cell.
I had some concerns about the condition
 16x 
  234   Thursday, January 17, 2013, 11:18 Travis CaveSouth Hot-CellStandard OperationTM4 module moveTM#4 has been moved from the SW silo to
the south hot cell, move went well.
  
  238   Friday, January 18, 2013, 16:56 Grant MinorConditioning StationStandard OperationTM4 VAT valve btwn roughing and nuc. vent. closedBevan attempted to start pumping down on
TM4 today remotely but there was an issue. 
He will report on Monday.
  
  239   Friday, January 18, 2013, 17:01 Grant MinorConditioning StationDevelopmentTM4 Photos of the CS with TM4 (after the no-module HV test, only vacuum connected)Attached are some photos of TM4 in the
Conditioning Station after the no-module
HV test completion.  Only vacuum services
 CS_post_HV_test_w_TM4_18Jan2013_001.jpgCS_post_HV_test_w_TM4_18Jan2013_003.jpgCS_post_HV_test_w_TM4_18Jan2013_004.jpgCS_post_HV_test_w_TM4_18Jan2013_005.jpg 
  240   Thursday, January 24, 2013, 13:30 David WangITWStandard OperationTM1 ITW-TM1 2013 winter shut down leak check.2013 winter shut down ITW-TM1 primary vacuum
vessel, secondary vacuum vessel, and water
lines leak check: connected leak detector
  
  241   Monday, January 28, 2013, 12:26 Travis CaveConditioning StationDevelopment  Switches connectedthe switches and the solenoid are all wire
up to 24VDC, when you open either of the
little doors the solenoid switches this is
  
  243   Friday, February 08, 2013, 11:42 Grant MinorITEMaintenance  TAPC 477 resolved - ISAC elec. room gas cylinderSee attached TAPC 477 documentation.  TAPC-477_resolved_8Feb2013.pdf 
  244   Thursday, February 14, 2013, 09:31 David WangITWRepair  ITH MP1 is replaced.Edi and I replaced the broken ITH MP1 in
target hall with a new pump. The old pump
was leak on oil. There were no oil had been
  
  245   Thursday, February 21, 2013, 14:05 David WangITWRepairTM1 Disconnected EXIT1 in ITW.Disconnected EXIT1 in ITW. All cables ,
wires and air lines are label marked.
  
  248   Tuesday, February 26, 2013, 10:26 Travis CaveITWStandard OperationTM1 module moveTM1 moved from the west station to the
southwest silo. Move went well.
  
  250   Tuesday, February 26, 2013, 13:53 David WangConditioning StationRepairTM4 Replaced TM4 TP1Bevan and I replaced TM4 TP1 today at conditioning
station .The pump will be started this week
when I do ITE and TM4 leak check .
  
  251   Friday, March 01, 2013, 11:35 David WangITEMaintenanceTM4 Leak check on ITE and TM4. The
leak  check on TM4 and ITE is done. All primary
vacuum vessel , secondary vacuum  vessel 
  
  252   Wednesday, March 06, 2013, 10:09 Travis CaveITWMaintenance  module moveITW EX1 has been moved from the west target
station to the south hot cell for the seal
replacement on the west station.
  