1925
|
Friday, May 17, 2019, 16:46 |
Adam Newsome | Safe Module Parking | Development | | | SMP Controls Installation Update |
The following controls-related |
|
2068
|
Friday, February 14, 2020, 14:13 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SIS dummy target for IGLIS TM4 electrical check | Electrical check and HS, window leak check
result at SHC. See attachment. |
|
1358
|
Thursday, September 22, 2016, 13:04 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SHC, TM4 leak check on HS line. | Chad and I leak checked the TM4 HS line
after new target installation. base leak
rate:0.0Xe-9 atm.cc/sec. No response |
|
1387
|
Tuesday, November 01, 2016, 14:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SHC, TM4 leak check on HS line. | Chad and I did a leak check on TM4 HS line
with new Ta target installed. Base leak rate
0.0xE-9 atm.cc/sec. base pressure 0.0XE-4. |
|
1226
|
Tuesday, May 10, 2016, 13:54 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on window line and HS line. | Chad and I leak checked the TM2 HS and
window lines after new target installation.
The window line was very easy pumped down |
|
1332
|
Wednesday, August 24, 2016, 10:44 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I leak checked Tm2 Hs line with
new target installed. Base LR 0.0Xe-9 atm.cc/sec.
No leak has been found. This line will be |
|
1381
|
Monday, October 24, 2016, 14:54 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I did the leak check on TM2 heat
shield line. LD base leak rate:0.0xE-9atm.cc/sec.
Base pressure:0.0X E-9 torr. The line is |
|
1403
|
Wednesday, November 23, 2016, 16:10 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I leak checked TM2 HS line with
new UCx target installed. Helium spray
2 seconds on each joint and 10seconds flushing |
|
1488
|
Tuesday, April 11, 2017, 14:06 |
David Wang | Conditioning Station | Standard Operation | TM4 | | SHC, TM2 leak check on HS line. | Chad and I did leak check on TM1 HS line
at SHC. 0.0XE-9 atm.cc/sec. No leak. |
|
1591
|
Wednesday, August 02, 2017, 15:13 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | HS line is leak checked at SHC this afternoon
by helium spay. Leak detector base
LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 |
|
2718
|
Monday, November 18, 2024, 12:18 |
Aaron Tam | South Hot-Cell | Repair | | | SHC West Manipulator Repair | November 14, 2024 - Aaron Tam w/
Chad Fisher
Following ID: |
|
2558
|
Wednesday, April 03, 2024, 10:48 |
chad fisher | South Hot-Cell | Maintenance | | | SE Manipulator wrist swap | On April 2, 2024 the wrist on the SE manipulator
of the SHC (Serial # 7986) was swapped with
a rebuild unit originally from SW position |
|
1465
|
Monday, March 27, 2017, 12:55 |
David Wang | Spent Target Vault | Repair | | | S/W silo rust clean up | Rust on S/W silo and cover plate stored
at silo area are cleaned up. |
|
1456
|
Tuesday, March 21, 2017, 11:59 |
David Wang | Conditioning Station | Repair | TM4 | | Rust inpsection on TM4 service cap inside surface and shielding plug surface. | Yasmine and I did a rust inpsection on
TM4 service cap inide surface and shielding
plug surface. No rust has been found. Also, |
11x |
1665
|
Wednesday, December 06, 2017, 09:33 |
Anders Mjos | Conditioning Station | Maintenance | | | Running chiller for maintenance tech | Dakine is on site to do maintenance
on the chiller. The tech requested the chiller
to operate. |
|
2111
|
Friday, June 26, 2020, 10:43 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Routine mechanical inspection: storage vault and mini-storage drive systems | An inspection was performed on drive systems
for both storage vaults (main and mini) by
Adam Newsome and Dan McDonald. The functionality |
|
2320
|
Wednesday, May 11, 2022, 16:29 |
Nadia Jorgenson | Spent Target Vault | Standard Operation | | | Routine mechanical inspection: storage vault | An
inspection was performed on drive systems
for the main storage vault by Dan McDonald, |
|
288
|
Thursday, April 04, 2013, 12:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started | Roughing started at 12:06. It was
believed there was a problem with the compressed
air but there was none, TM1 doesn't leak |
|
289
|
Thursday, April 04, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started |
|
|
2061
|
Wednesday, February 05, 2020, 10:54 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Roughing out TM4 at TCS. | TCS MP1 is started to rough out TM4 and
TCS. TCS and TM4 will be under roughing only
today and tomorrow. No plan to start TCS |
|