Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 73 of 140  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  150   Thursday, July 26, 2012, 08:33 David WangITEStandard OperationTM4 I moved 5 shielding blocks from ITW to ITE thisTuesday morning .  All water interlock checks for ITE
had been done. The ITE water signals  strength
and frequency(Espcially on MSP circuit) had
  
  159   Tuesday, August 07, 2012, 14:06 David WangITWRepair  ITW TP4S has been replaced
 

 Normal
  0

 
   
  
  163   Monday, August 20, 2012, 12:28 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW,I moved 5 shielding blocks from ITE 
to ITW.ITW is configured to take proton beam
now.
  
  164   Thursday, August 23, 2012, 07:34 David WangITWRepair  Replaced broken air lines on ITW HARP5B cylinder.Prob guys replaced broken air lines on
ITW HARP 5B Cylinder.Several shielding blocks
had been moved out to make the cylinder accessible.
  
  165   Thursday, August 30, 2012, 13:57 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.I disconnected TM 4 in ITE on AUG 29th
morning.The vacuum lines stay untouched and
they will be disconnected on SEP 04th.
  
  166   Friday, August 31, 2012, 12:10 chad fisherSouth Hot-CellMaintenance  Hot Cell MaitenanceEntered south hot cell Wednesday and replaced
the pre-filter air filter as well as the
front two light bulbs. Also removed two bags
  
  189   Thursday, September 27, 2012, 09:13 David WangITERepairTM4 ITE MSP water circuit flow wheel had been replaced ITE MSP water circuit flow wheel was replaced
yesterday due to poor performance. 
  
  191   Thursday, October 04, 2012, 11:06 David WangConditioning StationRepair  Replace conditioning station scroll pump in target hallGrant and I replaced the conditioning station
broken  srcoll pump with a refurbished
scroll pump which is supplied by vacuum group.
  
  199   Wednesday, October 31, 2012, 11:24 David WangITEStandard OperationTM4 Transfer five shielding blocks from ITW to ITE.Bevan and I transferred five shielding
blocks from ITW to ITE. ITE is ready for
taking proton beam.
  
  200   Friday, November 02, 2012, 08:45 maicodallavalleSpent Target VaultMaintenance  F-308The F-308 have been cleaned and serviced.
There were three F-308's that came back with
some contamination.#13, #15 and #19 were
  
  201   Friday, November 02, 2012, 13:18 Travis CaveSpent Target VaultStandard Operation  spent target assayThis week six targets and the two source
trays were assayed and surveyed from the
storage vault. see attached PDF for details.
 Vault_Storage_November_2_2012.pdf 
  203   Tuesday, November 06, 2012, 11:34 chad fisherSouth Hot-CellStandard OperationTM1 Nb#7 RemovalAttached are pre-removal pictures of NB#7
and the inside face of the containment box
cover before cleaning.
 IMG_0797[1].JPGIMG_0798[1].JPGIMG_0799[1].JPG 
  214   Wednesday, November 14, 2012, 10:57 David WangITWStandard OperationTM1 TM1connected in ITWI connected TM1 in ITW yesterday. Everything
is good so far. Travis was with me when i
did the job.
  
  215   Wednesday, November 14, 2012, 11:04 David WangITERepairTM4 Change ITE dump water circiut flow wheelI changed ITE dump water circuit flow wheel
due to its poor performance. The new flow
wheel works fine. The signal on electrical
  
  216   Wednesday, November 14, 2012, 11:51 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Five spent targets have been moved from
the storage vault to the mini storage vault.
The five targets are as follows: SiC #25,
 Vault_Storage_November_14_2012.pdfMini_Vault_Storage_November_14_2012.pdf 
  217   Wednesday, November 21, 2012, 09:36 Travis CaveSpent Target VaultStandard Operation  Spent target moveOn Nov 20th the 5 targets in mini storage
have been moved to the F-308s, those F-308s
have since been moved to the hot cell ante
  
  225   Wednesday, January 02, 2013, 12:11 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITW to block storage areaI moved 5 shielding blocks from ITW 
to block storage area for preparing the TM1
disconnection. Air sampled and swiped blocks
  
  226   Thursday, January 03, 2013, 10:05 David WangITWStandard OperationTM1 Disconnected TM1 in ITW.TM1 has been disconnected in ITW. All 
water lines had been purged. Travis was with
me during the job.
  
  229   Thursday, January 10, 2013, 10:40 David WangITWMaintenance  Replaced all high active water system magnetic pedal wheels in ITW and ITE.I replaced all high active water system
magnetic pedal wheels in ITW and ITE. This
is a preventive maintenance job we planned
  
  233   Thursday, January 17, 2013, 10:06 chad fisherSouth Hot-CellStandard Operation  SiC Test Target for TM4/CSI have inserted the test target for TM4
and the CS into the hot cell.
I had some concerns about the condition
 16x 
ELOG V2.9.2-2455