328
|
Thursday, May 02, 2013, 10:09 |
chad fisher | South Hot-Cell | Repair | TM3 | | Service tray water block leak check | David and I preformed a helium leak check
on the service tray waterblocks and verify
that no damage had been done during jig installation. |
|
2783
|
Friday, March 07, 2025, 09:16 |
David Wang | Cooling | Maintenance | | | Service of 28 female Parker 1/4 quick connectors in ITW and ITE | Service of Parker 1/4 quick connectors
in ITW and ITE have been done. all
28 female connectors were serviced. o- rings |
|
397
|
Friday, July 05, 2013, 09:22 |
chad fisher | South Hot-Cell | Repair | TM3 | | Service Tray Water Block Inspection | I have inspected the service tray water
block and suggest that they SHOULD be cleaned/polished
before we install the new source tray. |
|
1873
|
Thursday, February 21, 2019, 15:10 |
Isaac Earle | Safe Module Parking | Development | | | Seismic requirements for SMP | Dragan Mitrovic, TRIUMF structural engineer,
was consulted earlier this week regarding
seismic requirements for the SMP assembly. |
|
2704
|
Thursday, October 10, 2024, 12:20 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
2738
|
Friday, January 03, 2025, 09:59 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
2643
|
Wednesday, July 17, 2024, 15:06 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround Complete - SHC/NHC Area | A safety walkaround for July 2024 was completed
for the B2 level by A. Newsome. No deficiencies
to report. |
|
2132
|
Thursday, August 06, 2020, 14:33 |
Adam Newsome | Spent Target Vault | Development | | | Safety Group Relay Interface Installation | A relay contact-based interface module
was installed in between Safety Group's storage
vault door enable junction box and Remote |
|
2125
|
Thursday, July 16, 2020, 10:20 |
Adam Newsome | Safe Module Parking | Maintenance | | | SMP: Annual Electrical Inspection | An electrical systems check was performed
on the SMP by Adam Newsome and Travis Cave.
Overall, there were no issues to |
|
1904
|
Thursday, April 04, 2019, 14:49 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum vessel support roller friction check | With the SMP vacuum vessel now installed
inside the shield box, a test was performed
to measure the torque required to rotate |
|
1990
|
Monday, September 30, 2019, 11:27 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum vessel modifications completed | The SMP vacuum vessel welds were reinforced
to match the specifications on IRH1710 Rev
D. In addition a tube stub was added |
|
1946
|
Thursday, July 04, 2019, 08:57 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum system installed | July 3:
- Assembled exhaust line flexible
hose and fittings as per ISK0529 Rev D then |
  |
1955
|
Friday, July 26, 2019, 15:43 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum control system completed | The SMP vacuum control system has
been wired and setup to be controlled from
EPICS. Backing valve control (SMP:BV1) |
|
2014
|
Friday, October 25, 2019, 06:43 |
David Wang | Safe Module Parking | Development | TM3 | | SMP vacuum | TM3 was moved into SMP Oct 25 morning.
After two nights pumping down, SMP CG1 read
30mtorr this morning. The pump is stopped. |
|
2016
|
Monday, October 28, 2019, 12:00 |
Isaac Earle | Safe Module Parking | Development | | | SMP shielding attenuation measured & compared to theoretical values | The attenuation of the SMP shielding was
measured as part of SMP commissioning (Document-170404,
R1, Section 4, Test #8) |
|
2010
|
Tuesday, October 22, 2019, 16:26 |
Isaac Earle | Safe Module Parking | Development | | | SMP shield box grounding | A braided grounding strap was attached
to the aluminum gear box support on the SMP
shield box structure, and grounded by attaching |
|
1865
|
Monday, February 11, 2019, 10:26 |
Isaac Earle | Safe Module Parking | Development | | | SMP shield box and vacuum vessel moved to Target Hall | On February 8th the SMP shield
box (IRH1675) and the vacuum vessel (IRH1806)
were both raised from a horizontal to vertical |
6x |
1903
|
Monday, April 01, 2019, 14:56 |
Isaac Earle | Safe Module Parking | Development | | | SMP shield box and vacuum vessel installed in final location | Last week drilling of the additional
required holes in the SMP shield box was
completed in the Target Hall. This |
   |
1944
|
Thursday, June 20, 2019, 15:09 |
Isaac Earle | Safe Module Parking | Development | | | SMP motor wiring inspected by electrician | The AC wiring for the SMP motor was inspected
by Randy Boehm (TRIUMF electrician) as recommended
by Franco Mammarella (TRIUMF electrical engineer). |
|
1857
|
Friday, January 11, 2019, 13:59 |
Isaac Earle | Safe Module Parking | Development | | | SMP motor selection decision | SMP drivetrain design work is currently
underway. Alejandro has selected a