  150   Thursday, July 26, 2012, 08:33 David WangITEStandard OperationTM4 I moved 5 shielding blocks from ITW to ITE thisTuesday morning .

  All water interlock checks for ITE had been done. The ITE water signals strength and frequency(Espcially on MSP circuit) had been checked from electrical room, and everything is good.

  159   Tuesday, August 07, 2012, 14:06 David WangITWRepair  ITW TP4S has been replaced

 I replaced ITW TP4S today as we scheduled. The working area is swiped and air sampled .Everything is fine.

The Series # of the old pump is 200927, and the new one is 600080. The E-fault 6081 which is related to the job will be closed.

  163   Monday, August 20, 2012, 12:28 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW,

I moved 5 shielding blocks from ITE  to ITW.ITW is configured to take proton beam now.

  164   Thursday, August 23, 2012, 07:34 David WangITWRepair  Replaced broken air lines on ITW HARP5B cylinder.

Prob guys replaced broken air lines on ITW HARP 5B Cylinder.Several shielding blocks had been moved out to make the cylinder accessible. After the replacement,the HARP5B works fine.All shield blocks had been moved back to original position. The job is done.

  165   Thursday, August 30, 2012, 13:57 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.

I disconnected TM 4 in ITE on AUG 29th morning.The vacuum lines stay untouched and they will be disconnected on SEP 04th.

  166   Friday, August 31, 2012, 12:10 chad fisherSouth Hot-CellMaintenance  Hot Cell Maitenance

Entered south hot cell Wednesday and replaced the pre-filter air filter as well as the front two light bulbs. Also removed two bags of compressible garbage, one bag of metal, and of course the bagged air filter (as Joe M. expressed as interest in havung it).

Inital checks found approximately 4000 cpm on the cell side of the temporary Al. panel used during the cell entry, 2000 cpm on the tacky mats layed out beside the work area but nothing on the floor under the plastic that had been layed down for the job.

 

Chad

  189   Thursday, September 27, 2012, 09:13 David WangITERepairTM4 ITE MSP water circuit flow wheel had been replaced

ITE MSP water circuit flow wheel was replaced yesterday due to poor performance.

  191   Thursday, October 04, 2012, 11:06 David WangConditioning StationRepair  Replace conditioning station scroll pump in target hall

Grant and I replaced the conditioning station broken  srcoll pump with a refurbished scroll pump which is supplied by vacuum group. The replaced pump is bagged and waiting for RPG further survey in target hall . The target hall is survey after the job, and everything is fine.

  199   Wednesday, October 31, 2012, 11:24 David WangITEStandard OperationTM4 Transfer five shielding blocks from ITW to ITE.

Bevan and I transferred five shielding blocks from ITW to ITE. ITE is ready for taking proton beam.

  200   Friday, November 02, 2012, 08:45 maicodallavalleSpent Target VaultMaintenance  F-308

The F-308 have been cleaned and serviced. There were three F-308's that came back with some contamination.#13, #15 and #19 were found to have contamination. They were decontaminated. All of the loose contamination was removed. There is still some fixed contamination. The levels of contamination are low enough to still be used for shipping spent targets. They have been moved to the north hot cell area and are ready for to be filled with spent targets. 

  201   Friday, November 02, 2012, 13:18 Travis CaveSpent Target VaultStandard Operation  spent target assay

This week six targets and the two source trays were assayed and surveyed from the storage vault. see attached PDF for details.

Attachment 1: Vault_Storage_November_2_2012.pdf
Vault_Storage_November_2_2012.pdf Vault_Storage_November_2_2012.pdf Vault_Storage_November_2_2012.pdf Vault_Storage_November_2_2012.pdf
  203   Tuesday, November 06, 2012, 11:34 chad fisherSouth Hot-CellStandard OperationTM1 Nb#7 Removal

Attached are pre-removal pictures of NB#7 and the inside face of the containment box cover before cleaning.

Attachment 1: IMG_0797[1].JPG
IMG_0797[1].JPG
Attachment 2: IMG_0798[1].JPG
IMG_0798[1].JPG
Attachment 3: IMG_0799[1].JPG
IMG_0799[1].JPG
  214   Wednesday, November 14, 2012, 10:57 David WangITWStandard OperationTM1 TM1connected in ITW

I connected TM1 in ITW yesterday. Everything is good so far. Travis was with me when i did the job.

  215   Wednesday, November 14, 2012, 11:04 David WangITERepairTM4 Change ITE dump water circiut flow wheel

I changed ITE dump water circuit flow wheel due to its poor performance. The new flow wheel works fine. The signal on electrical board is strong and constant. One shielding block on ITE was moved out for the job, and it has been moved back after the job.The ITE is ready to take proton beam. Travis was with me when i did the job.

  216   Wednesday, November 14, 2012, 11:51 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.

Five spent targets have been moved from the storage vault to the mini storage vault. The five targets are as follows: SiC #25, Ta #34, Ta #32, Ta #31, Nb #4. See the attached PDFs for full details.

Attachment 1: Vault_Storage_November_14_2012.pdf
Vault_Storage_November_14_2012.pdf Vault_Storage_November_14_2012.pdf Vault_Storage_November_14_2012.pdf Vault_Storage_November_14_2012.pdf
Attachment 2: Mini_Vault_Storage_November_14_2012.pdf
Mini_Vault_Storage_November_14_2012.pdf Mini_Vault_Storage_November_14_2012.pdf Mini_Vault_Storage_November_14_2012.pdf Mini_Vault_Storage_November_14_2012.pdf
  217   Wednesday, November 21, 2012, 09:36 Travis CaveSpent Target VaultStandard Operation  Spent target move

On Nov 20th the 5 targets in mini storage have been moved to the F-308s, those F-308s have since been moved to the hot cell ante room. They will sit there until Monday.

  225   Wednesday, January 02, 2013, 12:11 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITW to block storage area

I moved 5 shielding blocks from ITW  to block storage area for preparing the TM1 disconnection. Air sampled and swiped blocks and ITW and everything is fine.Fiona was with me all the time during the moving.

  226   Thursday, January 03, 2013, 10:05 David WangITWStandard OperationTM1 Disconnected TM1 in ITW.

TM1 has been disconnected in ITW. All  water lines had been purged. Travis was with me during the job.

  229   Thursday, January 10, 2013, 10:40 David WangITWMaintenance  Replaced all high active water system magnetic pedal wheels in ITW and ITE.

I replaced all high active water system magnetic pedal wheels in ITW and ITE. This is a preventive maintenance job we planned for this winter shut down.

  233   Thursday, January 17, 2013, 10:06 chad fisherSouth Hot-CellStandard Operation  SiC Test Target for TM4/CS

I have inserted the test target for TM4 and the CS into the hot cell.

I had some concerns about the condition of the target which I have discussed with Pierre and he has cleared. Pictures are attached.

Attachment 1: IMG_0909[1].JPG
IMG_0909[1].JPG
Attachment 2: IMG_0910[1].JPG
IMG_0910[1].JPG
Attachment 3: IMG_0911[1].JPG
IMG_0911[1].JPG
Attachment 4: IMG_0912[1].JPG
IMG_0912[1].JPG
Attachment 5: IMG_0913[1].JPG
IMG_0913[1].JPG
Attachment 6: IMG_0914[1].JPG
IMG_0914[1].JPG
Attachment 7: IMG_0915[1].JPG
IMG_0915[1].JPG
Attachment 8: IMG_0916[1].JPG
IMG_0916[1].JPG
Attachment 9: IMG_0917[1].JPG
IMG_0917[1].JPG
Attachment 10: IMG_0918[1].JPG
IMG_0918[1].JPG
Attachment 11: IMG_0919[1].JPG
IMG_0919[1].JPG
Attachment 12: IMG_0920[1].JPG
IMG_0920[1].JPG
Attachment 13: IMG_0921[1].JPG
IMG_0921[1].JPG
Attachment 14: IMG_0922[1].JPG
IMG_0922[1].JPG
Attachment 15: IMG_0923[1].JPG
IMG_0923[1].JPG
Attachment 16: IMG_0924[1].JPG
IMG_0924[1].JPG
ELOG V2.9.2-2455