  214   Wednesday, November 14, 2012, 10:57 David WangITWStandard OperationTM1 TM1connected in ITW

I connected TM1 in ITW yesterday. Everything is good so far. Travis was with me when i did the job.

  215   Wednesday, November 14, 2012, 11:04 David WangITERepairTM4 Change ITE dump water circiut flow wheel

I changed ITE dump water circuit flow wheel due to its poor performance. The new flow wheel works fine. The signal on electrical board is strong and constant. One shielding block on ITE was moved out for the job, and it has been moved back after the job.The ITE is ready to take proton beam. Travis was with me when i did the job.

  216   Wednesday, November 14, 2012, 11:51 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.

Five spent targets have been moved from the storage vault to the mini storage vault. The five targets are as follows: SiC #25, Ta #34, Ta #32, Ta #31, Nb #4. See the attached PDFs for full details.

Attachment 1: Vault_Storage_November_14_2012.pdf
Vault_Storage_November_14_2012.pdf Vault_Storage_November_14_2012.pdf Vault_Storage_November_14_2012.pdf Vault_Storage_November_14_2012.pdf
Attachment 2: Mini_Vault_Storage_November_14_2012.pdf
Mini_Vault_Storage_November_14_2012.pdf Mini_Vault_Storage_November_14_2012.pdf Mini_Vault_Storage_November_14_2012.pdf Mini_Vault_Storage_November_14_2012.pdf
  217   Wednesday, November 21, 2012, 09:36 Travis CaveSpent Target VaultStandard Operation  Spent target move

On Nov 20th the 5 targets in mini storage have been moved to the F-308s, those F-308s have since been moved to the hot cell ante room. They will sit there until Monday.

  225   Wednesday, January 02, 2013, 12:11 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITW to block storage area

I moved 5 shielding blocks from ITW  to block storage area for preparing the TM1 disconnection. Air sampled and swiped blocks and ITW and everything is fine.Fiona was with me all the time during the moving.

  226   Thursday, January 03, 2013, 10:05 David WangITWStandard OperationTM1 Disconnected TM1 in ITW.

TM1 has been disconnected in ITW. All  water lines had been purged. Travis was with me during the job.

  229   Thursday, January 10, 2013, 10:40 David WangITWMaintenance  Replaced all high active water system magnetic pedal wheels in ITW and ITE.

I replaced all high active water system magnetic pedal wheels in ITW and ITE. This is a preventive maintenance job we planned for this winter shut down.

  233   Thursday, January 17, 2013, 10:06 chad fisherSouth Hot-CellStandard Operation  SiC Test Target for TM4/CS

I have inserted the test target for TM4 and the CS into the hot cell.

I had some concerns about the condition of the target which I have discussed with Pierre and he has cleared. Pictures are attached.

Attachment 1: IMG_0909[1].JPG
IMG_0909[1].JPG
Attachment 2: IMG_0910[1].JPG
IMG_0910[1].JPG
Attachment 3: IMG_0911[1].JPG
IMG_0911[1].JPG
Attachment 4: IMG_0912[1].JPG
IMG_0912[1].JPG
Attachment 5: IMG_0913[1].JPG
IMG_0913[1].JPG
Attachment 6: IMG_0914[1].JPG
IMG_0914[1].JPG
Attachment 7: IMG_0915[1].JPG
IMG_0915[1].JPG
Attachment 8: IMG_0916[1].JPG
IMG_0916[1].JPG
Attachment 9: IMG_0917[1].JPG
IMG_0917[1].JPG
Attachment 10: IMG_0918[1].JPG
IMG_0918[1].JPG
Attachment 11: IMG_0919[1].JPG
IMG_0919[1].JPG
Attachment 12: IMG_0920[1].JPG
IMG_0920[1].JPG
Attachment 13: IMG_0921[1].JPG
IMG_0921[1].JPG
Attachment 14: IMG_0922[1].JPG
IMG_0922[1].JPG
Attachment 15: IMG_0923[1].JPG
IMG_0923[1].JPG
Attachment 16: IMG_0924[1].JPG
IMG_0924[1].JPG
  234   Thursday, January 17, 2013, 11:18 Travis CaveSouth Hot-CellStandard OperationTM4 module move

TM#4 has been moved from the SW silo to the south hot cell, move went well.

  238   Friday, January 18, 2013, 16:56 Grant MinorConditioning StationStandard OperationTM4 VAT valve btwn roughing and nuc. vent. closed

Bevan attempted to start pumping down on TM4 today remotely but there was an issue.  He will report on Monday.

I went into the Target Hall this afternoon while on the phone with Bevan and performed the following:

- Checked the knurled vent valves on the side of each turbo, both were found to be in the tightened position (all the way clockwise)

- Closed the VAT valve between the scroll pump and the nuclear ventilation

  239   Friday, January 18, 2013, 17:01 Grant MinorConditioning StationDevelopmentTM4 Photos of the CS with TM4 (after the no-module HV test, only vacuum connected)

Attached are some photos of TM4 in the Conditioning Station after the no-module HV test completion.  Only vacuum services are connected.

Attachment 1: CS_post_HV_test_w_TM4_18Jan2013_001.jpg
CS_post_HV_test_w_TM4_18Jan2013_001.jpg
Attachment 2: CS_post_HV_test_w_TM4_18Jan2013_003.jpg
CS_post_HV_test_w_TM4_18Jan2013_003.jpg
Attachment 3: CS_post_HV_test_w_TM4_18Jan2013_004.jpg
CS_post_HV_test_w_TM4_18Jan2013_004.jpg
Attachment 4: CS_post_HV_test_w_TM4_18Jan2013_005.jpg
CS_post_HV_test_w_TM4_18Jan2013_005.jpg
  240   Thursday, January 24, 2013, 13:30 David WangITWStandard OperationTM1 ITW-TM1 2013 winter shut down leak check.

2013 winter shut down ITW-TM1 primary vacuum vessel, secondary vacuum vessel, and water lines leak check: connected leak detector to TP2(primary and water lines) and TP4S (secondary). base leak rate 0.0xE-9atm.cc/sec,base pressure 0.0XE-4torr. Sprayed helium to all primary vacuum seal and there is no response on leak detector. Helium pressurized all water lines(except HS) at 70psi ,3mins.Tube heat(+) no response, tube heater(-)1.6xe-9atm.cc/sec, target oven(-)5.8xe-9atm.cc/sec, target oven (+) 6.9xe-9atm.cc/sec, EE 5.7xe-9atm.cc/sec, MSP no response, window 7.5 xe-9atm.cc/sec.All water lines are water leak free.  Two leaks had been found on secondary vacuum vessel. One is on exit 1 to tank o-ring (east side, E-N corner). The leak detector got   responses from 1.4 to1.7 xe-7 atm.cc/sec scale . The test  hadbeen repeated 4-5 times and   confirmed the location   . The second one is a small leak which  is on exit 2 to tank o-ring(east side, close to E-N corner). The leak detector got  responses from 1.4 to 1.8xe-8atm.cc/sec scale. The test had been repeated 3 times and confirmed the location. As the present plan. we will replace the exit1 to tank o-ring during this year shut down time.

  241   Monday, January 28, 2013, 12:26 Travis CaveConditioning StationDevelopment  Switches connected

the switches and the solenoid are all wire up to 24VDC, when you open either of the little doors the solenoid switches this is also true if there is a power loss. currently the solenoid is powered.

  243   Friday, February 08, 2013, 11:42 Grant MinorITEMaintenance  TAPC 477 resolved - ISAC elec. room gas cylinder

See attached TAPC 477 documentation.

Attachment 1: TAPC-477_resolved_8Feb2013.pdf
TAPC-477_resolved_8Feb2013.pdf TAPC-477_resolved_8Feb2013.pdf TAPC-477_resolved_8Feb2013.pdf
  244   Thursday, February 14, 2013, 09:31 David WangITWRepair  ITH MP1 is replaced.

Edi and I replaced the broken ITH MP1 in target hall with a new pump. The old pump was leak on oil. There were no oil had been left in the old pump by checking the sight glass.Thats the reason of  the pump  failure.The tray which the old pump sat on was full of leaking oil ( highly contaminated ). The old pump was bagged in 3 thick plastic bags ,and the tray was cleaned before the new pump was installed. The working area had been cleaned up and surveyed couple of times after the job. Everything is good. The new pump had been tested after the installation. It works fine.

  245   Thursday, February 21, 2013, 14:05 David WangITWRepairTM1 Disconnected EXIT1 in ITW.

Disconnected EXIT1 in ITW. All cables , wires and air lines are label marked.

  248   Tuesday, February 26, 2013, 10:26 Travis CaveITWStandard OperationTM1 module move

TM1 moved from the west station to the southwest silo. Move went well.

  250   Tuesday, February 26, 2013, 13:53 David WangConditioning StationRepairTM4 Replaced TM4 TP1

Bevan and I replaced TM4 TP1 today at conditioning station .The pump will be started this week when I do ITE and TM4 leak check .

  251   Friday, March 01, 2013, 11:35 David WangITEMaintenanceTM4 Leak check on ITE and TM4.
 The leak check on TM4 and ITE is done. All primary vacuum vessel , secondary vacuum vessel  on TM4 and ITE are leak tight. There is no any response had been found on leak detector(leak detector base LR 0.0xE-9 arm.cc/sec). All water lines had been pressurized to 70 psi helium for 3 minutes. They are all perfect leak tight( I cant find even a tiny response on leak detector) except GE water cooling line. On the GE water line, the leak detector got a instantaneous response once I applied the helium to the circuit.The leak rate climbed directly from 0.0xe-9 atm.cc/sec to 1.5 xe-5 atmcc/sec even if I stopped the helium pressurizing immediately. Once I purged the helium out of the line, the leak rate return to 0.0XE-9 atm.cc/sec quickly. I repeated the test on GE water line again and got exactly same result as the before. I would say the leak on the ITE GE water circuit isn't a small leak. The same test could be fulfilled once the TM4 is in CS later. 
  252   Wednesday, March 06, 2013, 10:09 Travis CaveITWMaintenance  module move

ITW EX1 has been moved from the west target station to the south hot cell for the seal replacement on the west station.