Wednesday, August 03, 2016, 08:08: RGA on
Wednesday, August 03, 2016, 11:25: Configured EE to be connected to EE PS (not grounded)
Wednesday, August 03, 2016, 11:25: PS on
Wednesday, August 03, 2016, 11:32: BIAS / EL / EE to 20 / 10 / 1 kV
Ramping set to 40 / 20 A at 1 / 0.5 A/min. Good / bad vacuum at 2.0 / 2.2 E-6 T (IG2). Vacuum too high.
Wednesday, August 03, 2016, 13:02: BIAS / EL / EE to 30 / 15 / 1.5 kV
Wednesday, August 03, 2016, 15:59: BIAS / EL / EE to 35 / 17.5 / 1.5 kV. Some conditioning from 30 kV
Chiller staging stopped working around midnight. TGHT and TBHT ramped down by ISAC operators.
Thursday, August 04, 2016, 08:14: Ramping target to 50 / 25 A
Thursday, August 04, 2016, 08:22: Cycled power on chiller to reset alarm. Repeated again 5 min later
Thursday, August 04, 2016, 08:37: BIAS / EL / EE to 30 / 15 / 1.5 kV
Thursday, August 04, 2016, 09:36: Continue ramping to 100 / 50 A
Thursday, August 04, 2016, 11:32: Continue ramping to 120 / 60 A
Thursday, August 04, 2016, 14:50: ramping down
Friday, August 05, 2016, 07:09: Started cooling system
Friday, August 05, 2016, 07:56: Started ramping to 100 / 50 A
Friday, August 05, 2016, 14:27: TGHT / TBHT at 253 / 126 A.
Friday, August 05, 2016, 14:30: Ramping down at 2 / 1 A/min
Friday, August 05, 2016, 15:27: BIAS / EL / EE off
Monday, August 08, 2016, 08:15: Continue ramping. : BIAS / EL / EE to 30 / 15 / 1.5 kV
Monday, August 08, 2016, 14:36 TGHT / TBHT at 260 / 130 A. Ramping down at 2 / 1 A/min
Monday, August 08, 2016, 15:30: BIAS / EL off. EE remains at 1 kV.
Monday, August 08, 2016, 22:56: RGA off. Water system fault. Running CP1 manually
Monday, August 08, 2016, 22:57: EE off.
Monday, August 08, 2016, 22:58: Vacuum off |