Wednesday, August 03, 2016, 08:08: RGA on
Wednesday, August 03, 2016, 11:25: Configured EE to be connected to EE PS (not grounded)
Wednesday, August 03, 2016, 11:25: PS on
Wednesday, August 03, 2016, 11:32: BIAS / EL / EE to 20 / 10 / 1 kV
Ramping set to 40 / 20 A at 1 / 0.5 A/min. Good / bad vacuum at 2.0 / 2.2 E-6 T (IG2). Vacuum too high.
Wednesday, August 03, 2016, 13:02: BIAS / EL / EE to 30 / 15 / 1.5 kV
Wednesday, August 03, 2016, 15:59: BIAS / EL / EE to 35 / 17.5 / 1.5 kV. Some conditioning from 30 kV
Chiller staging stopped working around midnight. TGHT and TBHT ramped down by ISAC operators.
Thursday, August 04, 2016, 08:14: Ramping target to 50 / 25 A
Thursday, August 04, 2016, 08:22: Cycled power on chiller to reset alarm. Repeated again 5 min later
Thursday, August 04, 2016, 08:37: BIAS / EL / EE to 30 / 15 / 1.5 kV
Thursday, August 04, 2016, 09:36: Continue ramping to 100 / 50 A
Thursday, August 04, 2016, 11:32: Continue ramping to 120 / 60 A
Thursday, August 04, 2016, 14:50: ramping down
Friday, August 05, 2016, 07:09: Started cooling system
Friday, August 05, 2016, 07:56: Started ramping to 100 / 50 A
Friday, August 05, 2016, 14:27: TGHT / TBHT at 253 / 126 A.
Friday, August 05, 2016, 14:30: Ramping down at 2 / 1 A/min
Friday, August 05, 2016, 15:27: BIAS / EL / EE off
Monday, August 08, 2016, 08:15: Continue ramping. : BIAS / EL / EE to 30 / 15 / 1.5 kV
Monday, August 08, 2016, 14:36 TGHT / TBHT at 260 / 130 A. Ramping down at 2 / 1 A/min
Monday, August 08, 2016, 15:30: BIAS / EL off. EE remains at 1 kV.
Monday, August 08, 2016, 22:56: RGA off. Water system fault. Running CP1 manually
Monday, August 08, 2016, 22:57: EE off.
Monday, August 08, 2016, 22:58: Vacuum off |
Monday, July 25, 2016, 08:14: Enabled staging for chiller
Monday, July 25, 2016, 08:33: Disabled staging. Fault 2. Staging does not work at this point.
Monday, July 25, 2016, 08:34: Running CP1 manually to cool down water.
Monday, July 25, 2016, 09:15: Bias current limiting at 150 V. Investigating short.
Monday, July 25, 2016, 09:51: EE cable was shorting the BIAS on the TCS side.
Monday, July 25, 2016, 09:57: BIAS/ / EL at 20 / 10 kV
Monday, July 25, 2016, 10:08: Sparking at 24 kV. Lowered to 22 kV
Monday, July 25, 2016, 10:44: BIAS at 25 kV
Monday, July 25, 2016, 11:00: Sparking at 25.5 kV. Lowered to 25 kV
Monday, July 25, 2016, 12:03: 25.5 kV. No sparking for 10 min. Lower to 20 kV for lunch break.
Monday, July 25, 2016, 12:51: 26 kV
Monday, July 25, 2016, 13:00: Sparking at 27.3 kV. Lowered to 27 kV. EL at 14 kV
Monday, July 25, 2016, 13:04: More sparking. Lowered to 25 kV
Monday, July 25, 2016, 13:39: 25 kV
Monday, July 25, 2016, 14:21: A spark tripped the PS on water resistivity
Monday, July 25, 2016, 14:31: 25 kV
Monday, July 25, 2016, 15:34: ~20 sparks for the last 60 min
Monday, July 25, 2016, 16:28: ~10 sparks for the last 60 min. BIAS an EL off
Monday, July 25, 2016, 16:36: Stopped water cooling system.
Tuesday, July 26, 2016, 08:20: Started water cooling system.
Tuesday, July 26, 2016, 08:24: Ran CP1 manually for 3 min. Enabled staging.
Tuesday, July 26, 2016, 08:31: BIAS / EL at 25 / 0 kV
Tuesday, July 26, 2016, 08:39: EL float to 300 V. Set to 500 V
Tuesday, July 26, 2016, 08:45: BIAS to 25.5 kV
Tuesday, July 26, 2016, 09:07: 26 kV
Tuesday, July 26, 2016, 09:12: Lost contact with EPICS. Scheduled maintenance
Tuesday, July 26, 2016, 10:26: 6 sparks for the last 60 min
Tuesday, July 26, 2016, 10:33: BIAS to 27 kV
Tuesday, July 26, 2016, 10:43: Sparking at 27.8 kV. Lowered to 23 kV
Tuesday, July 26, 2016, 10:51: BIAS back at 27 kV. A spark tripped the BIAS on water resistivity
Tuesday, July 26, 2016, 11:08: BIAS at 27 kV
Tuesday, July 26, 2016, 11:22: BIAS at 28 kV
Tuesday, July 26, 2016, 11:42: BIAS at 27 kV after trip due to water resistivity (spark)
Tuesday, July 26, 2016, 12:00: BIAS / EL off for lunch break
Tuesday, July 26, 2016, 14:10: EL to 10 kV
Tuesday, July 26, 2016, 14:14: El to 20 kV
Tuesday, July 26, 2016, 14:20: EL to 25 kV
Tuesday, July 26, 2016, 14:27: First spark at 27.6 kV
Tuesday, July 26, 2016, 14:29: EL to 28 kV (BIAS at 0 kV)
Tuesday, July 26, 2016, 14:43: RGA on
Tuesday, July 26, 2016, 14:49: No sparking for 20 min
Tuesday, July 26, 2016, 16:02: No sparks for 90 min.
Tuesday, July 26, 2016, 16:06: PS and water off.
Wednesday, July 27, 2016, 09:14: BIAS at 24 kV
Wednesday, July 27, 2016, 09:19: Lowered to 20 kV due to sparking
Wednesday, July 27, 2016, 09:28: BIAS at 22 kV
Wednesday, July 27, 2016, 15:30: BIAS and water off
Thursday, July 28, 2016, 08:43: RGA off |