1750
|
Tuesday, July 03, 2018, 14:42 |
David Wang | ITW | Standard Operation | TM2 | Nb#8 | TM2 has been connected to ITW. | TM2 has been connected to ITW. All turbo
pumps are started. See attachment for connection
checklist. |
|
|
1751
|
Wednesday, July 11, 2018, 15:06 |
Anders Mjos | ITW | Standard Operation | TM2 | Nb#8 | Block move | Maico and Travis moved blocks from ITE
to ITW yesterday |
|
|
1752
|
Wednesday, July 11, 2018, 15:09 |
Anders Mjos | ITW | Maintenance | TM2 | Nb#8 | Uncovered ITW to toubleshoot 2A2M19 | The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were |
|
|
1758
|
Wednesday, July 25, 2018, 13:21 |
Anders Mjos | ITW | Repair | TM2 | Nb#8 | Leak check of ITW | ITW Entrance Module was leak checked yesterday
with the support of Vacuum Group (Dimo &
Edi). The leak detector was connected to |
|
|
1767
|
Tuesday, August 14, 2018, 10:27 |
Travis Cave | ITW | Standard Operation | TM2 | UC#23 | Module move | Both the West Entrance and TM#2 with
UC#23 have been moved back into their places
in the west target station. The Entrance |
|
|
1787
|
Thursday, September 20, 2018, 14:36 |
Travis Cave | ITW | Standard Operation | TM2 | nSiC#1 | Module move | TM#2 with nSiC#1 has been moved from
the south hot cell to the west target station. |
|
|
1788
|
Friday, September 21, 2018, 10:06 |
David Wang | ITW | Standard Operation | TM2 | UCx23 | TM2 was disconnected in ITW. | TM2 was disconnected in ITW this Tuesday.
See attachment for checklist. |
|
|
1789
|
Friday, September 21, 2018, 10:07 |
David Wang | ITW | Standard Operation | TM2 | SiC nano | TM2 with SiC nano target was has been connected in ITW. | Tm2 with SiC nano has been connected in
ITW. See attachment for checklist |
|
|
1805
|
Monday, October 22, 2018, 14:05 |
Travis Cave | ITW | Repair | | | Module move | ITW Exit #2 has been moved from the
west station to the south hot cell for a
bellows repair. |
|
|
1806
|
Tuesday, October 23, 2018, 10:45 |
David Wang | ITW | Standard Operation | TM2 | SiC nano | TM2 was disconnected in ITW. | TM2(SiC nano) has been disconnected in
ITW. See attachment |
|
|
1812
|
Tuesday, October 30, 2018, 10:50 |
Travis Cave | ITW | Standard Operation | TM2 | nSiC#1 | Modules moved | Modules were moved, ITW EX2 was moved
from the conditioning station to the west
target station and TM#2 ,with nSiC#1, |
|
|
1818
|
Tuesday, November 06, 2018, 10:59 |
Travis Cave | ITW | Standard Operation | TM2 | UC#25 | Module move | TM#2 with UC#25 has been moved from
the conditioning station to the west target
station. |
|
|
1819
|
Wednesday, November 07, 2018, 09:50 |
Anders Mjos | ITW | Standard Operation | TM2 | UC#25 | TM2 connected in ITW | TM2 was connected yesterday by Frank and
Anders. The West side panel with IG1S on
Exit Module 2 was replaced with a new SST |
|
|
1821
|
Wednesday, November 14, 2018, 16:10 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal troubleshooting | Measured resistance on safety limit switches
for FC5 on Exit Module 2. Determined that
the in connected signal did not work (shows |
|
|
1823
|
Thursday, November 22, 2018, 08:53 |
Anders Mjos | ITW | Standard Operation | TM2 | UC#25 | Block move | Frank and Anders moved blocks from ITE
to ITW yesterday |
|
|
1824
|
Thursday, November 22, 2018, 08:55 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal limit switch installed | Yesterday Diagnostics group installed a
temporary external limit switch to provide
the in signal to the safety system. |
|
|
1844
|
Thursday, January 03, 2019, 13:30 |
David Wang | ITW | Repair | | | ITH:MP1 | ITH:MP1 inlet pressure showed 10torr after
power outage during holiday. All ITE/W turbo-pumps
were tripped because of it. Removed one shielding |
|
|
1846
|
Friday, January 04, 2019, 08:48 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been disconnected in ITW. | TP1, TP2 are still connected for next week
leak check. All water lines in TM2 are purged
with 80 psi air, each for 5 minutes. |
|
|
1848
|
Tuesday, January 08, 2019, 08:49 |
David Wang | ITW | Standard Operation | TM2 | | TP1 TP1 have been disconnected in ITW | Started argon venting of ITW now. |
|
|
1852
|
Wednesday, January 09, 2019, 13:29 |
David Wang | ITW | Repair | | | ITH:MP1 | ITH: MP1 has been replaced due to its poor
performance. Its motor and power cable
are taken out and reused on new pump. Vacuum |
|