  1748   Tuesday, July 03, 2018, 09:57 Travis CaveITWStandard OperationTM2Nb#8Module move

 TM#2 with Nb#8 has been moved from the south hot cell to the west target station.

  1749   Tuesday, July 03, 2018, 14:38 David WangITWStandard Operation  ITW water signals interlock check.

Annual ITW water signals interlock check are done. Everything works good.

  1750   Tuesday, July 03, 2018, 14:42 David WangITWStandard OperationTM2Nb#8TM2 has been connected to ITW.

TM2 has been connected to ITW. All turbo pumps are started. See attachment for connection checklist.

Attachment 1: Nb#4_Module_connection_checklist.pdf
Nb#4_Module_connection_checklist.pdf Nb#4_Module_connection_checklist.pdf Nb#4_Module_connection_checklist.pdf
  1751   Wednesday, July 11, 2018, 15:06 Anders MjosITWStandard OperationTM2Nb#8Block move

Maico and Travis moved blocks from ITE to ITW yesterday

  1752   Wednesday, July 11, 2018, 15:09 Anders MjosITWMaintenanceTM2Nb#8Uncovered ITW to toubleshoot 2A2M19

The 2A2M19 beam profile monitor did not work and was e-faulted. After initial troubleshooting 2 blocks were removed form ITW to inspect the entrance module where the beam monitor is installed. The cable was found not to be connected and was quickly fixed. Blocks reinstalled. The work was done by Maico, Travis and Anders

  1758   Wednesday, July 25, 2018, 13:21 Anders MjosITWRepairTM2Nb#8Leak check of ITW

ITW Entrance Module was leak checked yesterday with the support of Vacuum Group (Dimo & Edi). The leak detector was connected to primary backing vacuum line. A leak response was found near the bellow for the beam profile monitor on top of the Entrance Module. It could be confirmed today by actuating the monitor, that the leak was indeed at that location. The plan is to move the TM and Entrance Module out for target exchange and repair, respectively. Drawings of the device available on ITA0200and ITA5128

Attachment 1: Entrance_Module_Leak_2018-07-25.docx
  1767   Tuesday, August 14, 2018, 10:27 Travis CaveITWStandard OperationTM2UC#23Module move

 Both the West Entrance and TM#2 with UC#23 have been moved back into their places in the west target station. The Entrance module move wasn't completely smooth as it did suffer a little bumpiness when the shield plug part was installed, I was lifted back out again and no visible damage was observed on the delicate items.

  1787   Thursday, September 20, 2018, 14:36 Travis CaveITWStandard OperationTM2nSiC#1Module move

 TM#2 with nSiC#1 has been moved from the south hot cell to the west target station.

  1788   Friday, September 21, 2018, 10:06 David WangITWStandard OperationTM2UCx23TM2 was disconnected in ITW.

TM2 was disconnected in ITW this Tuesday. See attachment for checklist.

Attachment 1: TM2_UCx_23#_disconnection_in_ITW..pdf
TM2_UCx_23#_disconnection_in_ITW..pdf TM2_UCx_23#_disconnection_in_ITW..pdf
  1789   Friday, September 21, 2018, 10:07 David WangITWStandard OperationTM2SiC nanoTM2 with SiC nano target was has been connected in ITW.

Tm2 with SiC nano has been connected in ITW. See attachment for checklist

Attachment 1: TM2_with_SiC_nano_connection_in_ITW..pdf
TM2_with_SiC_nano_connection_in_ITW..pdf TM2_with_SiC_nano_connection_in_ITW..pdf TM2_with_SiC_nano_connection_in_ITW..pdf
  1805   Monday, October 22, 2018, 14:05 Travis CaveITWRepair  Module move

 ITW Exit #2 has been moved from the west station to the south hot cell for a bellows repair.

  1806   Tuesday, October 23, 2018, 10:45 David WangITWStandard OperationTM2SiC nanoTM2 was disconnected in ITW.

TM2(SiC nano) has been disconnected in ITW. See attachment

Attachment 1: TM2_SiC_nano_disconnection_in_ITW.pdf
TM2_SiC_nano_disconnection_in_ITW.pdf TM2_SiC_nano_disconnection_in_ITW.pdf
  1812   Tuesday, October 30, 2018, 10:50 Travis CaveITWStandard OperationTM2nSiC#1Modules moved

 Modules were moved, ITW EX2 was moved from the conditioning station to the west target station and TM#2 ,with nSiC#1,  was moved from the west target station to the south hot cell.

  1818   Tuesday, November 06, 2018, 10:59 Travis CaveITWStandard OperationTM2UC#25Module move

 TM#2 with UC#25 has been moved from the conditioning station to the west target station.

  1819   Wednesday, November 07, 2018, 09:50 Anders MjosITWStandard OperationTM2UC#25TM2 connected in ITW

TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only (dwg). Link to check list on DocuShare.

  1821   Wednesday, November 14, 2018, 16:10 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal troubleshooting

Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected.

Attachment 1: 2018-11-13_FC5.pdf
2018-11-13_FC5.pdf
  1823   Thursday, November 22, 2018, 08:53 Anders MjosITWStandard OperationTM2UC#25Block move

Frank and Anders moved blocks from ITE to ITW yesterday

  1824   Thursday, November 22, 2018, 08:55 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal limit switch installed

Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system.

Attachment 1: FC5_limit_switch.jpg
FC5_limit_switch.jpg
  1844   Thursday, January 03, 2019, 13:30 David WangITWRepair  ITH:MP1

ITH:MP1 inlet pressure showed 10torr after power outage during holiday. All ITE/W turbo-pumps were tripped because of it. Removed one shielding block above the vacuum station. Visually checked oil level  and condition in pump. oil level is high. oil color is dark. no oil  leak .  Installed a local convectron gauge on pump inlet. After pumping down, It shows pump is good.  Tightened  all KF 25 and 50 clamps on pump inlet side. Reconnected pump to system. Everything works fine so far. All ITW / E turbo pumps are started now.

  1846   Friday, January 04, 2019, 08:48 David WangITWStandard OperationTM2 TM2 has been disconnected in ITW.

TP1, TP2 are still connected for next week leak check. All water lines in TM2 are purged with 80 psi air, each for 5 minutes.

TP1 and TP2 had been disconnected. TM2 with UCx 25  disconnection checklist, See attachment.

Attachment 1: UCx25_TM2_disconnection_checklist.pdf
UCx25_TM2_disconnection_checklist.pdf UCx25_TM2_disconnection_checklist.pdf