Entry  Tuesday, July 03, 2018, 09:57, Travis Cave, ITW, Standard Operation, TM2, Nb#8, Module move 
 TM#2 with Nb#8 has been moved from the south hot cell to the west target station.
Entry  Tuesday, July 03, 2018, 14:38, David Wang, ITW, Standard Operation, , , ITW water signals interlock check. 
Annual ITW water signals interlock check are done. Everything works good.
Entry  Tuesday, July 03, 2018, 14:42, David Wang, ITW, Standard Operation, TM2, Nb#8, TM2 has been connected to ITW. Nb#4_Module_connection_checklist.pdf
TM2 has been connected to ITW. All turbo pumps are started. See attachment for connection checklist.
Entry  Wednesday, July 11, 2018, 15:06, Anders Mjos, ITW, Standard Operation, TM2, Nb#8, Block move 
Maico and Travis moved blocks from ITE to ITW yesterday
Entry  Wednesday, July 11, 2018, 15:09, Anders Mjos, ITW, Maintenance, TM2, Nb#8, Uncovered ITW to toubleshoot 2A2M19 
The 2A2M19 beam profile monitor did not work and was e-faulted.
After initial troubleshooting 2 blocks were removed form ITW to inspect the entrance module where the beam monitor is installed. The cable was found not
to be connected and was quickly fixed. Blocks reinstalled. The work was done by Maico, Travis and Anders
Entry  Wednesday, July 25, 2018, 13:21, Anders Mjos, ITW, Repair, TM2, Nb#8, Leak check of ITW Entrance_Module_Leak_2018-07-25.docx
ITW Entrance Module was leak checked yesterday with the support of Vacuum Group (Dimo & Edi). The leak detector was connected to primary backing
vacuum line. A leak response was found near the bellow for the beam profile monitor on top of the Entrance Module. It could be confirmed today by actuating
the monitor, that the leak was indeed at that location. The plan is to move the TM and Entrance Module out for target exchange and repair, respectively.
Entry  Tuesday, August 14, 2018, 10:27, Travis Cave, ITW, Standard Operation, TM2, UC#23, Module move 
 Both the West Entrance and TM#2 with UC#23 have been moved back into their places in the west target station. The Entrance module move wasn't completely
smooth as it did suffer a little bumpiness when the shield plug part was installed, I was lifted back out again and no visible damage was observed on the
delicate items.
Entry  Thursday, September 20, 2018, 14:36, Travis Cave, ITW, Standard Operation, TM2, nSiC#1, Module move 
 TM#2 with nSiC#1 has been moved from the south hot cell to the west target station.
Entry  Friday, September 21, 2018, 10:06, David Wang, ITW, Standard Operation, TM2, UCx23, TM2 was disconnected in ITW. TM2_UCx_23#_disconnection_in_ITW..pdf
TM2 was disconnected in ITW this Tuesday. See attachment for checklist.
Entry  Friday, September 21, 2018, 10:07, David Wang, ITW, Standard Operation, TM2, SiC nano, TM2 with SiC nano target was has been connected in ITW. TM2_with_SiC_nano_connection_in_ITW..pdf
Tm2 with SiC nano has been connected in ITW. See attachment for checklist
Entry  Monday, October 22, 2018, 14:05, Travis Cave, ITW, Repair, , , Module move 
 ITW Exit #2 has been moved from the west station to the south hot cell for a bellows repair.
Entry  Tuesday, October 23, 2018, 10:45, David Wang, ITW, Standard Operation, TM2, SiC nano, TM2 was disconnected in ITW. TM2_SiC_nano_disconnection_in_ITW.pdf
TM2(SiC nano) has been disconnected in ITW. See attachment
Entry  Tuesday, October 30, 2018, 10:50, Travis Cave, ITW, Standard Operation, TM2, nSiC#1, Modules moved 
 Modules were moved, ITW EX2 was moved from the conditioning station to the west target station and TM#2 ,with nSiC#1,  was moved from the
west target station to the south hot cell.
Entry  Tuesday, November 06, 2018, 10:59, Travis Cave, ITW, Standard Operation, TM2, UC#25, Module move 
 TM#2 with UC#25 has been moved from the conditioning station to the west target station.
Entry  Wednesday, November 07, 2018, 09:50, Anders Mjos, ITW, Standard Operation, TM2, UC#25, TM2 connected in ITW 
TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only
(dwg). Link to check list on DocuShare.
Entry  Wednesday, November 14, 2018, 16:10, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal troubleshooting 2018-11-13_FC5.pdf
Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless
of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected.
Entry  Thursday, November 22, 2018, 08:53, Anders Mjos, ITW, Standard Operation, TM2, UC#25, Block move 
Frank and Anders moved blocks from ITE to ITW yesterday
Entry  Thursday, November 22, 2018, 08:55, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal limit switch installed FC5_limit_switch.jpg
Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system.
Entry  Thursday, January 03, 2019, 13:30, David Wang, ITW, Repair, , , ITH:MP1 
ITH:MP1 inlet pressure showed 10torr after power outage during holiday. All ITE/W turbo-pumps were tripped because of it. Removed one shielding block
above the vacuum station. Visually checked oil level  and condition in pump. oil level is high. oil color is dark. no oil  leak .  Installed
a local convectron gauge on pump inlet. After pumping down, It shows pump is good.  Tightened  all KF 25 and 50 clamps on pump inlet side. Reconnected
Entry  Friday, January 04, 2019, 08:48, David Wang, ITW, Standard Operation, TM2, , TM2 has been disconnected in ITW. UCx25_TM2_disconnection_checklist.pdf
TP1, TP2 are still connected for next week leak check. All water lines in TM2 are purged with 80 psi air, each for 5 minutes.
TP1 and TP2 had been disconnected. TM2 with UCx 25  disconnection checklist, See attachment.