1501
|
Monday, April 24, 2017, 16:06 |
David Wang | South Hot-Cell | Repair | TM2 | | Crane main hoist strane noise when lifting up TM2 | When lifting up TM2 (20000lbs) this
afternoon, TH crane has a strange noise on
main hoist. The module was lift up less than |
|
1502
|
Monday, April 24, 2017, 16:11 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS TP1s is restarted. | TCS IG1S is switched on as well.
The reason to start the pump is to prepare
a possible extended TM2 conditioning at TCS |
|
1505
|
Wednesday, April 26, 2017, 10:24 |
David Wang | ITW | Standard Operation | TM2 | | TM2 ITW | TM2 was moved and connected in ITW yesterday
afternoon. After roughing down, ITW turbo
pumps are started. ITW TP4 can not be started |
|
1549
|
Wednesday, May 24, 2017, 08:11 |
David Wang | ITW | Standard Operation | TM2 | | TH schedule 132 update weekly | See attachments. |
 |
1550
|
Tuesday, June 06, 2017, 13:42 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Ta#51 removed SiC#36 installed | This afternoon Ta#51 was removed from TM2
and SiC#36 installed.
All new fasteners used. High current |
|
1551
|
Wednesday, June 07, 2017, 13:33 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 SiC#36 leakc check and electrical check. | The results are good. See attachment. |
|
1552
|
Wednesday, June 07, 2017, 13:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | I started all turbo pumps. |
|
1553
|
Thursday, June 08, 2017, 07:37 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Helium pressure test on TM2 water llines at TCS. |
The helium pressure test on HS line is done |
|
1554
|
Thursday, June 08, 2017, 08:35 |
David Wang | Conditioning Station | Development | TM2 | | TM2 gas line reconfiguration on the module top. | Reconfigured TM2 gas line on the module
top. It matches with the febiad gas line
we are using on service tray now. Facing |
|
1557
|
Tuesday, June 13, 2017, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#36 | module moved | TM#2 with SiC#36 has been moved from the
conditioning station to the west target station. |
|
1559
|
Tuesday, June 13, 2017, 13:41 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected in ITW. | Yasmine and I connected TM2 in ITW today.
the control page is set to febiad mode. Both
gas line in ITW are opened for febiad run. |
|
1561
|
Monday, June 19, 2017, 07:29 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Update TH MS project schedule. | Update TH MS project schedule. See attachment
1,2. |
 |
1589
|
Tuesday, August 01, 2017, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check | The electrical check of TM#2 with SiC#36
attached. Post beam at the south hot cell.
See attached results allow the before beam |
 |
1590
|
Wednesday, August 02, 2017, 15:09 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnencted in ITW yesterday. | Tm2 was disconnected in ITW yesterday.
ITW EL cable crimp ring was broken. John
Chow replaced this ring this afternoon. |
|
1591
|
Wednesday, August 02, 2017, 15:13 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | HS line is leak checked at SHC this afternoon
by helium spay. Leak detector base
LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 |
|
1594
|
Thursday, August 03, 2017, 17:08 |
Anders Mjos | Conditioning Station | Repair | TM2 | | Power bump | Thursday, August 03, 2017, 17:08:
Restarting vacuum and water system |
|
1595
|
Tuesday, August 08, 2017, 13:26 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#53 | module moved | TM#2 with Ta#53 has been moved from the
conditioning station to the west target station. |
|
1597
|
Tuesday, August 15, 2017, 09:27 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check of target in SHC |
|
|
1598
|
Tuesday, August 15, 2017, 09:30 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#53 | TM2 radiation fields |
|
|
1618
|
Tuesday, September 19, 2017, 13:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#53 | Module move | TM#2 with Ta#53 has been moved from
the west target station to the south hot
cell. |
|