1501
|
Monday, April 24, 2017, 16:06 |
David Wang | South Hot-Cell | Repair | TM2 | | Crane main hoist strane noise when lifting up TM2 |
When lifting up TM2 (20000lbs) this afternoon, TH crane has a strange noise on main hoist. The module was lift up less than 1 feet.when strange sound was noticed. The module move was stopped right away,and module was lowed back to SHC. The strange noise was confirmed later with SEG block six inches lifting up. Gordon crane technician will be here to tomorrow morning to investigate the problem. |
1502
|
Monday, April 24, 2017, 16:11 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS TP1s is restarted. |
TCS IG1S is switched on as well. The reason to start the pump is to prepare a possible extended TM2 conditioning at TCS caused by TH crane issue. TCS:TP1 and TP2 are not switched on for this. |
1505
|
Wednesday, April 26, 2017, 10:24 |
David Wang | ITW | Standard Operation | TM2 | | TM2 ITW |
TM2 was moved and connected in ITW yesterday afternoon. After roughing down, ITW turbo pumps are started. ITW TP4 can not be started to full speed. ISAC ops kept it at low speed mode with less than 1.0A current draw on pump. ITW IG1s shows red as well. I will take a look on them today when beam is off.
|
1549
|
Wednesday, May 24, 2017, 08:11 |
David Wang | ITW | Standard Operation | TM2 | | TH schedule 132 update weekly |
See attachments. |
Attachment 1: Target_Hall_shedule_132_Apr_to_Sep.mpp
|
Attachment 2: Target_Hall_shedule_132_Apr_to_Sep.pdf
|
|
1550
|
Tuesday, June 06, 2017, 13:42 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Ta#51 removed SiC#36 installed |
This afternoon Ta#51 was removed from TM2 and SiC#36 installed.
All new fasteners used. High current fasteners torqued to 130 in lbs.
|
1551
|
Wednesday, June 07, 2017, 13:33 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 SiC#36 leakc check and electrical check. |
The results are good. See attachment. |
Attachment 1: TM2_SiC_36#_leak_check_an_delectrical_check..pdf
|
|
1552
|
Wednesday, June 07, 2017, 13:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. |
I started all turbo pumps. |
1553
|
Thursday, June 08, 2017, 07:37 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Helium pressure test on TM2 water llines at TCS. |
The helium pressure test on HS line is done at TCS this morning. I got the same result as last time when we helium pressure it it with first target in April. The leak rate on this line is 1.8 XE-7atm.cc/sec. So, we know this leak is mostly on the line, but not on the VCR joints connecting the target. See attachment for last time(April) checking e-log. The leak could be from water block which is same as other lines. I do not think this leak rate will affect the operation.
The attachment can not be opened for some reasons. Please check TM2 leak check 2017-03-13 e- log for last time test result and comment. |
Attachment 1: TM2_helium_pressure_test..png
|
|
1554
|
Thursday, June 08, 2017, 08:35 |
David Wang | Conditioning Station | Development | TM2 | | TM2 gas line reconfiguration on the module top. |
Reconfigured TM2 gas line on the module top. It matches with the febiad gas line we are using on service tray now. Facing the module, both of them should be that right side line of two SST lines on feed-through. The gas line on TM2 was leak checked with a blind cap installed on service tray side and LD connected on module top this Tuesday. It is leak free with helium spray on the top of module and service tray. |
Attachment 1: TM2_gas_line_on_the_top_002.JPG
|
|
1557
|
Tuesday, June 13, 2017, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#36 | module moved |
TM#2 with SiC#36 has been moved from the conditioning station to the west target station. |
1559
|
Tuesday, June 13, 2017, 13:41 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected in ITW. |
Yasmine and I connected TM2 in ITW today. the control page is set to febiad mode. Both gas line in ITW are opened for febiad run. All connections are double checked. Module connection checklist is finished. All turbo pumps are started now. Everything is good so far. The TM2 is ready for conditioning when the ITW vacuum is good enough. |
1561
|
Monday, June 19, 2017, 07:29 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Update TH MS project schedule. |
Update TH MS project schedule. See attachment 1,2. |
Attachment 1: Target_Hall_shedule_132_Apr_to_Sep.pdf
|
|
Attachment 2: Target_Hall_shedule_132_Apr_to_Sep.mpp
|
1589
|
Tuesday, August 01, 2017, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check |
The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well. |
Attachment 1: TM2_SiC36_SHC_elec_chk.PDF
|
|
Attachment 2: TM2_SiC36_Postbeam_SHC_elec_chk.PDF
|
|
1590
|
Wednesday, August 02, 2017, 15:09 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnencted in ITW yesterday. |
Tm2 was disconnected in ITW yesterday. ITW EL cable crimp ring was broken. John Chow replaced this ring this afternoon. |
1591
|
Wednesday, August 02, 2017, 15:13 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. |
HS line is leak checked at SHC this afternoon by helium spay. Leak detector base LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 torr. No leak has been found. This line will be helium pressured at TCS. It had a 1.7XE-7 atm.cc/sec leak rate on 70 psi helium at TCS during last two target checks.
2017-08-03. Helium pressure test on TM2 HS line at TCS is done. 70psi helium, 3 minutes. base leak rate 0.0xE-7 atm.cc/sec. Result: 1.8XE-7atm.cc/sec leak which is almost same as before. This line has a very small leak on water block seal under helium pressure test which we knew already. |
1594
|
Thursday, August 03, 2017, 17:08 |
Anders Mjos | Conditioning Station | Repair | TM2 | | Power bump |
Thursday, August 03, 2017, 17:08: Restarting vacuum and water system |
1595
|
Tuesday, August 08, 2017, 13:26 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#53 | module moved |
TM#2 with Ta#53 has been moved from the conditioning station to the west target station. |
1597
|
Tuesday, August 15, 2017, 09:27 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check of target in SHC |
Travis Cave wrote: |
The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.
|
by David and Chad after target removed from module:
Anode to target @500V - 65Kohm
Anode to HS - dead short
Target to HS@500V -62Kohm. |
1598
|
Tuesday, August 15, 2017, 09:30 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#53 | TM2 radiation fields |
Travis Cave wrote: |
TM#2 with Ta#53 has been moved from the conditioning station to the west target station.
|
by Travis (measured at ~ 2' from module on service tray side):
at 3' 325 uSv/h
at 2' 640 uSv/h |
1618
|
Tuesday, September 19, 2017, 13:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#53 | Module move |
TM#2 with Ta#53 has been moved from the west target station to the south hot cell. |