Tuesday, September 20, 2016, 11:48, David Wang, Assembly/Bench Test, Development, , , A silo and blue steel frame are removed out of TH
|
A silo and blue steel frame are removed out of TH this morning. They are transferred through ante room, and moved to experimental hall TM assembly
area for a long term storage. Swipes are done on the silo and frame before and during move. No contamination has been found . |
Tuesday, September 20, 2016, 11:41, David Wang, ITE, Standard Operation, TM4, , TM4 has been disconnected in ITE.
|
TM4 has been disconnected in ITE. No water line purge on HS and 3 water circuits are looped after disconnection. The HALCW system resistivity is stable
before and after this disconnection. |
Tuesday, September 20, 2016, 10:32, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, module moved
|
TM#4 has been moved from the east target station to the south hot cell |
Monday, September 19, 2016, 08:28, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 131(Sep-Dec, 2016)
|
Post new target hall Excel sheet schedule for beam schedule 131. See attachment 1,2
Post new target hall MS project schedule for beam schedule131. See attachment 3,4 |
Thursday, September 15, 2016, 11:05, Isaac Earle, North Hot-Cell, Development, , , NHC / SHC feedthrough panel removed
|
The sheet metal panel covering the NHC/SHC feedthrough port was removed today using a slide-hammer to pull out the concrete anchors (this oversized panel
would have interfered with the NHC partition wall). 50cpm was found on the inside of the panel, 100cpm on the NHC side lip of the feedthrough, and
350cpm on the face of the shielding bricks in the feedthrough. Various dimensional measurements of the feedthrough were taken which will be added |
Wednesday, September 14, 2016, 13:53, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move
|
TM#3, no target, has been moved from the conditioning station to the north east silo. |
Wednesday, September 14, 2016, 11:54, David Wang, Conditioning Station, Repair, TM3, , TM3 is disconnected at TCS.
|
TM3 is disconnected at TCS and ready to be moved to silo. |
Tuesday, September 13, 2016, 13:52, Anders Mjos, Conditioning Station, Standard Operation, TM3, , HV Test with new insulators on Service Cap (vacuum to air)
|
Tuesday, September 12, 2016, 10:00: RGA on
Tuesday, September 13, 2016, 13:52: Source on
Tuesday, September 13, 2016, 13:55: BIAS / EL at 10 / 5 kV |
Monday, September 12, 2016, 09:25, David Wang, Conditioning Station, Repair, TM3, , TM3 leak checked at TCS
|
After blue insulators replacement, TM3 service cap are leak checked. LD base leak rate 0.0xe-9 atm.cc/sec. I sprayed lots helium on all blue insulator
seals. No leak has been found. Double checked them again, and got same result. All other seals on top of TM3 also have been checked. They are leak free.
OVEN, TUBE, MSP, COIL, and EE water lines are pressurized with 70 psi helium for 3minutes each. They are good also. |
Thursday, September 08, 2016, 16:30, David Wang, Conditioning Station, Repair, TM3, , TM3 vacuum system have been connected at TCS.
|
start of roughing now.
start of TCS and TM3 turbo-pumps. Everything is good so far. |
Thursday, September 08, 2016, 16:28, David Wang, Conditioning Station, Repair, TM3, , TM3 blue insulators have been replaced.
|
All TM3 blue insulators except Gas,EL, and 60 KV common on top of the module have been replaced with new designed insulators. The new blue insulator
for gas line need to be modified to fit for the bent on the gas line. EL, and 60KV common blue insulators were replaced during last time
TM3 refurbishment so they are relative new, and not replaced this time. All seals related to the blue insulators are changed to new seals. The o- |
Wednesday, September 07, 2016, 11:44, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module moved
|
TM#3 has been moved from the NE Silo to the conditioning station. |
Wednesday, September 07, 2016, 11:39, Isaac Earle, North Hot-Cell, Development, , , NHC North / South Wall Gap Measurements
|
Measurements were taken today of the NHC north/south wall gap at the location where the NHC/TCS partition wall will be installed (43.375"
from the NHC west wall). A HILTI PD40 laser range meter was used for the measurements. They were taken at 10", 34", 62", 90",
118", and 142" from the floor which matches the top of each cross-beam. The results are below: |
Tuesday, September 06, 2016, 10:05, David Wang, ITW, Standard Operation, TM2, , 5 Shielding blocks have been transferred from ITE to ITW.
|
5shielding blocks have been transferred from ITE to ITE. ITW is configured to take proton beam. |
Tuesday, August 30, 2016, 13:17, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected at ITW
|
ITW turbo pumps have been started. |
Tuesday, August 30, 2016, 10:35, Travis Cave, ITW, Standard Operation, TM2, Ta#49, module moved
|
TM#2 with Ta#49 has been moved to the west target station from the conditioning station. |
Monday, August 29, 2016, 13:34, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been disconnected at TCS
|
I stopped TCS water pumps and vacuum pumps also. TM2 and TCS will be vented tomorrow morning. |
Thursday, August 25, 2016, 14:25, Travis Cave, Spent Target Vault, Standard Operation, , SiC#33, Spent Target move
|
SiC#33 was placed into pail #141 which in turn was placed into slot 2B of the vault. I was 295mS/hr upon removal from the south hot cell. |
Thursday, August 25, 2016, 13:59, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep, 2016)
|
Weekly update schedule. See attachment 1,2. |
Thursday, August 25, 2016, 08:43, David Wang, Conditioning Station, Standard Operation, TM2, , All TM2 connections to TCS are done.
|
The HV cover is installed. The Faraday cage at B2 level is locked also.The TCS and TM2 are still pumping down. Everything is good so far. |
|