ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1372   Wednesday, October 19, 2016, 11:46 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#2 has been moved from the south hot
cell to the south west silo.
  
  1376   Friday, October 21, 2016, 15:10 Anders MjosSouth Hot-CellRepairTM2Ta#49Stuck TGHT clamp bolt removalDuring target removal on Wednesday October
12th, the left target heater conductor bolt
(ITD0058) could not be removed. The bolt
  
  1378   Monday, October 24, 2016, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#2 has been moved from the south west
silo to the south hot cell.
  
  1380   Monday, October 24, 2016, 14:44 chad fisherSouth Hot-CellStandard OperationTM2SiC#35SiC#35 installedSic#35 has been installed onto TM2. High
current fasteners torqued to 130 in lbs.
Mating of the 9 pin connector was
 20161024_141155.jpg 
  1381   Monday, October 24, 2016, 14:54 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.Chad and I did the leak check on TM2 heat
shield line. LD base leak rate:0.0xE-9atm.cc/sec.
Base pressure:0.0X E-9 torr. The line is
  
  1382   Monday, October 24, 2016, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical ChecksResults of the electrical check of TM#2
with no target after the repair and with
the SiC#35 mounted on the module.
 TM2_elechk_notgt_SHC_repair.PDFTM2_elechk_SiC35_SHC.PDF 
  1383   Tuesday, October 25, 2016, 15:10 David WangITWStandard OperationTM2 TM2 has been connected at ITWAll turbo pumps are started. Two gas valves
for Febiad run are opened. Pumping down is
good so far.
  
  1384   Wednesday, October 26, 2016, 12:33 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 131(Sep-Dec, 2016)Update TH schedule after job delay on TM2
Febiad target. Everything should be back
to schedule on last two targets. See attachments.
 Target_Hall_shedule_131__Sep_to_Dec_2016.pdfTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131_Sep_to_Dec.pdf 
  1398   Tuesday, November 22, 2016, 10:45 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35module movedTM#2 with the old SiC #35 has been moved
from ITW to the south hot cell.
  
  1399   Tuesday, November 22, 2016, 11:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical CheckElectrical check of TM#2 with the SiC#35 
post beam run. See attached PDF for details.
 TM2_elechk_SiC35_postbeam.PDF 
  1401   Wednesday, November 23, 2016, 14:21 Travis CaveConditioning StationStandard OperationTM2UC#18module movedTM#2 with UC#18 has been moved from the
south hot cell to the conditioning station.
  
  1402   Wednesday, November 23, 2016, 14:25 Travis CaveSouth Hot-CellStandard OperationTM2UC#18Electrical CheckResults of TM#2 with UC#18 electrical at
the south hot cell. See attached PDF for
details.
 TM2_elechk_UC18_SHC.PDF 
  1403   Wednesday, November 23, 2016, 16:10 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.Chad and I leak checked TM2 HS line with
new UCx target installed. Helium spray 
2 seconds on each joint and 10seconds flushing
  
  1404   Wednesday, November 23, 2016, 16:21 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.All vacuum pumps have been started. Air
ballast 50seconds on roughing pump. Everything
is good  so far.
  
  1405   Thursday, November 24, 2016, 09:33 Anders MjosConditioning StationStandard OperationTM2UC#18Conditioning UC#18Thursday, November 24, 2016, 09:33: Water
package on
Thursday, November 24, 2016, 09:43:
  
  1406   Thursday, November 24, 2016, 10:30 David WangConditioning StationStandard OperationTM2 HV cover is installed on TM2 at TCSInterlock key  are returned back to
B2 level.TM2 is ready for HV conditioning
and heating up at TCS.
  
  1408   Tuesday, November 29, 2016, 06:27 David WangConditioning StationStandard OperationTM2 TCS water pumps are stoppedArgon venting on TCS and TM2 is processing   
  1409   Tuesday, November 29, 2016, 07:50 David WangConditioning StationStandard OperationTM2 TM2 is disconnected at TCS.Argon venting is done.   
  1410   Tuesday, November 29, 2016, 12:57 David WangITWStandard OperationTM2 TM2 is connected in ITWAll turbo pumps are started. Water system
and water signals have been checked. Pumping
down on ITW and TM2 is good so far.
  
  1411   Tuesday, November 29, 2016, 14:50 Travis CaveITWStandard OperationTM2UC#18module movedTM#2 with UC#18 has been moved to ITW from
the conditioning station.
  