1338
|
Thursday, August 25, 2016, 08:43 |
David Wang | Conditioning Station | Standard Operation | TM2 | | All TM2 connections to TCS are done. | The HV cover is installed. The Faraday
cage at B2 level is locked also.The TCS and
TM2 are still pumping down. Everything is |
|
1341
|
Monday, August 29, 2016, 13:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been disconnected at TCS | I stopped TCS water pumps and vacuum pumps
also. TM2 and TCS will be vented tomorrow
morning. |
|
1342
|
Tuesday, August 30, 2016, 10:35 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#49 | module moved | TM#2 with Ta#49 has been moved to the west
target station from the conditioning station. |
|
1343
|
Tuesday, August 30, 2016, 13:17 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW | ITW turbo pumps have been
started. |
|
1344
|
Tuesday, September 06, 2016, 10:05 |
David Wang | ITW | Standard Operation | TM2 | | 5 Shielding blocks have been transferred from ITE to ITW. | 5shielding blocks have been transferred
from ITE to ITE. ITW is configured to take
proton beam. |
|
1369
|
Tuesday, October 11, 2016, 10:36 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#49 | module moved | TM#2 with Ta#49 has been moved from the
west target station to the south hot cell. |
|
1370
|
Wednesday, October 12, 2016, 10:00 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnected at ITW | TM2 was disconnected at ITW. 3 water circuits
in ITW gave been looped to keep 75 GPM water
flow to ITW. HS line was purged at HS. RPG |
|
1372
|
Wednesday, October 19, 2016, 11:46 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved | TM#2 has been moved from the south hot
cell to the south west silo. |
|
1376
|
Friday, October 21, 2016, 15:10 |
Anders Mjos | South Hot-Cell | Repair | TM2 | Ta#49 | Stuck TGHT clamp bolt removal | During target removal on Wednesday October
12th, the left target heater conductor bolt
(ITD0058) could not be removed. The bolt |
|
1378
|
Monday, October 24, 2016, 11:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved | TM#2 has been moved from the south west
silo to the south hot cell. |
|
1380
|
Monday, October 24, 2016, 14:44 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#35 | SiC#35 installed | Sic#35 has been installed onto TM2. High
current fasteners torqued to 130 in lbs.
Mating of the 9 pin connector was |
|
1381
|
Monday, October 24, 2016, 14:54 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I did the leak check on TM2 heat
shield line. LD base leak rate:0.0xE-9atm.cc/sec.
Base pressure:0.0X E-9 torr. The line is |
|
1382
|
Monday, October 24, 2016, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Checks | Results of the electrical check of TM#2
with no target after the repair and with
the SiC#35 mounted on the module. |
 |
1383
|
Tuesday, October 25, 2016, 15:10 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW | All turbo pumps are started. Two gas valves
for Febiad run are opened. Pumping down is
good so far. |
|
1384
|
Wednesday, October 26, 2016, 12:33 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Update TH schedule after job delay on TM2
Febiad target. Everything should be back
to schedule on last two targets. See attachments. |
  |
1398
|
Tuesday, November 22, 2016, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | module moved | TM#2 with the old SiC #35 has been moved
from ITW to the south hot cell. |
|
1399
|
Tuesday, November 22, 2016, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Check | Electrical check of TM#2 with the SiC#35
post beam run. See attached PDF for details. |
|
1401
|
Wednesday, November 23, 2016, 14:21 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#18 | module moved | TM#2 with UC#18 has been moved from the
south hot cell to the conditioning station. |
|
1402
|
Wednesday, November 23, 2016, 14:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#18 | Electrical Check | Results of TM#2 with UC#18 electrical at
the south hot cell. See attached PDF for
details. |
|
1403
|
Wednesday, November 23, 2016, 16:10 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I leak checked TM2 HS line with
new UCx target installed. Helium spray
2 seconds on each joint and 10seconds flushing |
|