Tuesday, November 29, 2016, 12:57, David Wang, ITW, Standard Operation, TM2, , TM2 is connected in ITW
|
All turbo pumps are started. Water system and water signals have been checked. Pumping down on ITW and TM2 is good so far. |
Tuesday, November 29, 2016, 07:50, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 is disconnected at TCS.
|
Argon venting is done. |
Tuesday, November 29, 2016, 06:27, David Wang, Conditioning Station, Standard Operation, TM2, , TCS water pumps are stopped
|
Argon venting on TCS and TM2 is processing |
Friday, November 25, 2016, 09:04, Travis Cave, Spent Target Vault, Standard Operation, , SiC#35, Spent Target move
|
On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details. |
Thursday, November 24, 2016, 10:30, David Wang, Conditioning Station, Standard Operation, TM2, , HV cover is installed on TM2 at TCS
|
Interlock key are returned back to B2 level.TM2 is ready for HV conditioning and heating up at TCS. |
Thursday, November 24, 2016, 09:33, Anders Mjos, Conditioning Station, Standard Operation, TM2, UC#18, Conditioning UC#18
|
Thursday, November 24, 2016, 09:33: Water package on
Thursday, November 24, 2016, 09:43: TCS:WPV1 shows only 12% open. A visual inspection confirms the valve is fully opened. Controls will be contacted
to troubleshoot |
Wednesday, November 23, 2016, 16:21, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 and TCS vacuum system has been connected.
|
All vacuum pumps have been started. Air ballast 50seconds on roughing pump. Everything is good so far. |
Wednesday, November 23, 2016, 16:10, David Wang, South Hot-Cell, Standard Operation, TM2, , SHC, TM2 leak check on HS line.
|
Chad and I leak checked TM2 HS line with new UCx target installed. Helium spray 2 seconds on each joint and 10seconds flushing around target in
SHC. LD base LR: 0.0XE-9atm.cc/sec, base pressure:0.0XE-4 torr. No response has been found on LD during check. The line is leak free. |
Wednesday, November 23, 2016, 14:25, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#18, Electrical Check
|
Results of TM#2 with UC#18 electrical at the south hot cell. See attached PDF for details. |
Wednesday, November 23, 2016, 14:21, Travis Cave, Conditioning Station, Standard Operation, TM2, UC#18, module moved
|
TM#2 with UC#18 has been moved from the south hot cell to the conditioning station. |
Tuesday, November 22, 2016, 14:26, David Wang, Conditioning Station, Standard Operation, , , TCS vacuum pumps are switched off
|
TCS will be vented tomorrow morning for TM2 moving. |
Tuesday, November 22, 2016, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#35, Electrical Check
|
Electrical check of TM#2 with the SiC#35 post beam run. See attached PDF for details. |
Tuesday, November 22, 2016, 10:45, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#35, module moved
|
TM#2 with the old SiC #35 has been moved from ITW to the south hot cell. |
Tuesday, November 15, 2016, 07:53, David Wang, Conditioning Station, Standard Operation, TM4, , Target Hall schedule for beam schedule 131(Sep-Dec, 2016)
|
Update TH schedules . See attachments |
Tuesday, November 08, 2016, 14:45, David Wang, ITE, Maintenance, TM4, , TM4 has been moved to ITE and connected there.
|
All ITE and TM4 turbo pumps are started. The east station pumping down is good so far. |
Tuesday, November 08, 2016, 14:04, Isaac Earle, North Hot-Cell, Development, , , Interference check with TCS turbo pump and proposed NHC duct routing
|
David Wang and I accessed the NHC today to check if the proposed duct routing (IRH1618) will interfere with servicing or replacement of the TCS turbo
pump. A piece of plywood was placed in the future position of the NHC/TCS partition wall (IRH1609), and a ducting elbow was placed at the approximate
position of the nearest elbow to the turbo pump. |
Tuesday, November 08, 2016, 10:23, Travis Cave, ITE, Standard Operation, TM4, Ta#50, module moved
|
TM#4 with Ta#50 has been moved to the east target station. |
Tuesday, November 08, 2016, 07:47, David Wang, Conditioning Station, Standard Operation, TM4, , TCS water and vacuum pumps are switched off
|
TCS is vented. TM4 is disconnected and TCS. |
Monday, November 07, 2016, 10:35, Travis Cave, Spent Target Vault, Standard Operation, , SiC#34, Spent Target move
|
Spent SiC#34 was moved on the 3rd of November and placed in the spent target vault. See attached pdf for details. |
Thursday, November 03, 2016, 09:01, David Wang, Conditioning Station, Standard Operation, TM4, , TCS water system has been started for TM4.
|
The system works fine. All water signals to TM4 at TCS are normal. HV cover is installed on to TM4 at TCS. |
|